Objects to NRC 820729 Request for License Fee to Support 820409 License Change Request.Nrc Request Based on Separate & Single Safety Issue Instead of Intended Joint Consideration of Single Issue Involving Two Subsets
ML20063M799
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/10/1982
From: Mardis D
FLORIDA POWER CORP.
To: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
References
3F-0982-06, 3F-982-6, TAC-48844, NUDOCS 8209160127
Download: ML20063M799 (3)


Text

_ _ _ - _ _ _.

<td

_ u e,c we N

1 J.= q &

i

p fQ ldO{pOj g Q2%y

%g'(w%ff*

a ya Power C o n P O n

  • T e 0 88 September 10,1982 RECE:VED BY LFMB
  1. 3F-0982-06 File: 3-0-3-e Date.

, /. 3.

f,h Loz.

/Id.......

C-l Mr. W. O. Miller, Chief License Fee Management Branch AC!k'a cora,al.

Office of Administration U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 License Amendment Fee for April 9,1982 License Change Request

Dear Mr. Miller:

Your letter of July 29, 1982, requested remittance of a $f,000 license fee to f

support our application to operate Crystal River Unit 3 at power levels up to 75 percent Full Power with three operating reactor coolant pumps and the Reactor Coolant Pump Power Monitors (RCPPM's) bypassed. Your request was based upon viewing of our April 9,1982 submittal as a separate and single safety issue (i.e.,

apart from previous analyses supporting operation with the RCPPM's bypassed.)

Florida Power Corporation does not agree with your interpretation of applicable fees. Florida Power Corporation requested an amendment to allow plant operation with the RCPPM's bypassed. This involves a single safety issue (i.e., Departure from Nucleate Boiling Ratio (DNBR) margin associated with a loss of flow transient.) This single issue necessarily involves two subsets since the plant can operate with either three or four operating reactor coolant pumps. These two subsets were considered on separate schedules by the Office of Nuclear Reactor Regulation (NRR) in order to facilitate an accelerated review to return the plant to power following spurious plant trips caused by the RCPPM's. NRR requested further information to support three pump operation with the RCPPM's bypassed; thus prompting our April 9 submittal.

g 8209160127 820910 PDR ADOCK 05000302 P

PDR General Office 3201 Thirty-tourin street souin. P O Box 14042. St Petersburg, Florida 33733 813-866-5151

Mr. W. O. Miller, Chief September 10,1982 Page 2 Additionally, your understanding of the chronology of this licensing action muy be incomplete. Attached is a tabulated summary of correspondence related to piant operation with the RCPPM's bypassed.

Should your interpretation of our applicable license fee remain unchanged, please contact this of fice.

I Very truly yours, tud David G. Mardis l

l Acting Manager i

Nuclear Licensing DGM/myf Attachment Mardis(T09)Cte-1 cc: Mr. 3. P. O'Reilly Regional Administrator, Region 11 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 101 Marietta Street N.W. Suite 3100 Atlanta, GA 30303

DATE INITIATED BY SUBJECT 04/01/82 FPC Request to operate at up to 75% Full Povier with RCPPM's bypassed. Noted that this request preceded a request to operate at up to 90% Full Power with RCPPM's bypassed.

$4,000 enclosed.

04/01/82 NRC Telephone authorization of April I request.

(Provided 4 reactor coolant pumps were running).

04/02/82 NRC Written confirmation of April 1 telephone l

authorization.

04/06/32 FPC Request and analysis supporting operation at up to 90% Full Power with RCPPM's bypassed.

l l

04/06/82 NRC Telephone authorization of April 6 request.

(Provided 4 reactor coolant pumps were running).

04/09/82 FPC Request to operate at up to 75% of 90% Full Power with RCPPM's bypassed and 3 reactor coolant pumps operating.

04/16/82 NRC Written confirmation of April 6 telephone authorization.

04/30/82 FPC Additionalinformation supporting April 9 submittal.

07/15/82 NRC Amendment 55 to Operating license formalizing April 6 authorization to operate at 90% Full Power with RCPPM's bypassed. (Four pump operation only).

07/16/82 NRC Amendment 56 to Operating license allowing operation up to 2475 MWt with RCPPM's bypassed. (Four pump operation only).

_ _ _ _ _ _ _ _ _ _ _