~ TEN'NESSEE VALLEY AUTHORITY CHdTTANOOGk'. TENNESSEE 37401 400 Chestnut Street Tower II
,. /, " r, 3
/i S,
- September 1, 1982 BLRD-50-438/82-55 BLRD-50-439/82-49 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. ' 0'Reilly, Regional Administrator 101 Marietta Street,= Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - CONDUIT LOADING ON ANNULUS FRAMING IN REACTOR BUILDING - BLRD-50-438/82-55, BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on August 2, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN QAB 8204. Enclosed is our first interim report.
We. expect to submit our next report by December 7,1982.
If you have any questions concerning this matter, please get in touch with I
R. H. Shell at FTS 858-2688.
r Very truly youca, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. I;ichard C. DeYoung, Director (Enclosure)
Office or Inapection and Enforcement U.S. Nuclear Regulai.ory Commission Washington, D.C.
20555 i
8209080619 820901 i
PDR ADOCK 05000430 S
.(OFFICI4L cc)py -
as 17
- c. - n -
y ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 CONDUIT LOADING ON ANNULUS FRAMING IN REACTOR BUILDING NCR BLN QAB 8204 BLRD-50-438/82-55, BLRD-50-439/82-49 10 CFR 50.55(e)
FIRST INTERIM REPORT Description cf Deficiency Conduit has been placed along a span of structural steel in the annulus of the Reactor Building.. Tne steel was not designed to support the resultant torsional loading. The conduit is field routed by BLNP CONST. The apparent cause of the deficiency is the failure of TVA to make a sufficiently conservative estimate of applied loads during the design process.
Interim Progress TVA is still investigating the subject deficiency. Additional information will be supplied in the next report.