Monthly Operating Rept for Jan 1994 for Davis-Besse Nuclear Power Station Unit 1
ML20063H357
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/31/1994
From: Koch S, Jeffery Wood
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB-94-0324, KB-94-324, NUDOCS 9402170323
Download: ML20063H357 (5)


Text

. . . . ., ... . - - . _ _ - - _ _ _ -

4 TOLEDO

%ss EDISON l

' A Centeriot Energy Cornpany EDISON PLAZA 300 MADISON AVENUE "

T LEDO, OHIO 43652 0001 +

February 14, 1994 KB-94-0324 l

Docket No. 50-346 License No. NPF-3 U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D.C. 20555 Gentlemen:

i Monthly Operating Report,, January 1994 ,

Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report'for Davis-Besse Nuclear Power Station Unit No.1 for the month of Janitary 1994.

If you have any questions, please contact S. D. Koch at (419)'321-7791.-

Very truly yours,

/

/

J n K. Wood Plant Manager ,

i Davis-Besse Nuclear Power Station SDK/nlg Enclosures l

cc: Mr. R. J. Stransky NRC Senior Project Manager  ;

I Hr. J. B. Martin Region III Administrator Mr. S. Stasek l NRC Senior Resident Inspector j 9402170323 940131 { 7- 7- i PDR .ADOCK 05000346 m ~l jl R ';

PDR d.  ;


_-____r- 4~ a -

w- -

1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-0346 l UNIT Davis-Besse Unit 1 DATE 2/01/94 COMPLETED BY STEVE KOCH-TELEPHONE 419-321-7791 1 l

MONTH JANUARY 1994 I l

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL .

DAY (MWe-Net) DAY (MWe-Net) l

! l l 1 878 17 879 2 880 18 -880 l J

3 879 19 880 l i

l i 4 880 20 878'

_i i

5 880 21 878 l r 6 880 22 878 )

l 7 879 23 877 l

8 880 24 878  !

9 880 25 879 l

10 878 26 878 1

l 11 878 27 877 ,

12 877 28 876  !

i 13 879 29 878 ^

l l

14 879 30 877 l

15 878 31 879 j

16 877 i

l l

I l

1 -

l

. i i

OPERATING DATA REPORT l DOCKET NO 50-0346 DATE 2-01-94 COMPLETED BY STEVE KOCH TELEPHONE 419-321-7791-OPERATING STATUS ,

1. Unit Names Davis-Besse Unit 1 Notes
2. Reporting Period..................... JANUARY 1994 I
3. Licensed Thermal Power (MWt)............. 2772
4. Nameplate Rating (Gross MWe)............. 925
5. Design Electrical Rating (Net MWe)....... 906

[

6. , Maximum Dependable Capacity (Gross MWe).. 913 l
7. Maximum Dependable Capacity (Net MWe).... 868
8. If changes Occur in Capacity Ratings (Items number 3 through 7) since last report, give reasons:

t l

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any (Net MWa; This Month Yr-to-Date Cumulative l
11. Hours In Reporting Period.............. 744.00 744.00 135937.00 l 12. Number Of Hours Reactor Was Critical... 744.00 744.00 82984.45 l
13. Reactor Reserve Shutdown Hours......... 0.00 0.00 5532.00
14. Hours Generator On-Line................ 744.00 744.00 80767.73
15. Unit Reserve Shutdown Hours............ 0.00 0.00 1732.50 l 16. Gross Thermal Energy Generated (MWH)... 2,061,'037 2,061,037 207,832,806 l 17. Gross Electrical Energy Generated (MWH) 687,192 687,192 67,027,213 l
18. Net Electrical Energy Generated (MWH).. 653,583 -653,583 63,179,952
19. Unit Service Factor.................... 100.00 100.00- 59.42
20. Un it Avail ability Factor. . . . . . . . . . . . . . . 100.00 100.00 60.69
21. Unit Capacity Factor (Using MDC Net)... 101.21 101.21 53.55
22. Unit Capacity Factor (Using DER Net)... 96.96 96,96 51.30  ;
23. Unit Forced Outage Rate................ 0.00 0.00 21.18-  !
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):  !

! l 1

I

25. If Shut Down At End Of Report Period, Estimated Date of Startup  ;
26. Units In Test Status (Prior to commercial Operation): l Forecast Achieved )

1 INITIAL CRITICALITY l INITIAL ELECTRICITY  ;

l COMMERCIAL OPERATION  :

1 1

I l

- - - m - - ,, ,y4 3

-UNIT SHUTDOWNS AND POVER REDUCTIONS DOCKET NO.: 50-346 UNIT NAME: Davis-Besse #1 DATE: February 1, 19942 Completed by: S. D. Koch  !

Report Month January 1994

~

Telephone: (419)321-7791 '

n y _5.

,, 4 gf' t.ic.nese 4 .ceuse 6 corr.ctiv.

, no . Det.

h 3 g E. A f5-I gj moport e.

3'u Prevent Recurrence

~

t 4

i' i

No significant shutdowis or. power reductior s.

4 1

F Forced Reason: Method: Exhibit G - Instructions for Preparation of Data 5: Scheduled A-Equipment Failure (Explain) 1-Manual. Entry Sheets for Licensee Event Report (LER)

IHtaintenance or Test 2-Manual scram File (NUREG-0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from 2

  • E-Operator Training & License Examination Previous Month' Exhibit I - Same Source i

' F-Ad:sinistrative 5-Load Reduction

  • Report challenges to Power Operated Relief Valves G-Operational Error (Explain) 9-other (Explatn)

(PORVs) and Pressuriser Code Safety valves (PCSVs)

H-Other (Explain)

-~ - . . - . . . = . , . - - - .

l l- , c' i

f I .

' OPERATIONAL

SUMMARY

January 1994 " j Reactor power was maintained at approximately 100 percent ' full power until 0137 hours0.00159 days <br />0.0381 hours <br />2.265212e-4 weeks <br />5.21285e-5 months <br /> on January 16, 1994, when a manual. power reduction to approximately 94 percent power was initiated to perform main turbine control valve testing and control rod drive (CRD) exercise testing.

After completion of main turbine control valve testing and CRD exercise.

testing, reactor power was slowly increased to apprcximately 100 percent full power, which was achieved at 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br /> on. January 16, 1994. Reactor power was maintained at this power level for the rest of the month.

u l

)

I i 9 l

l i

i i

- . , - . , , . - , - - - - - , , , . . . . , ,