Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 LIC-99-0061, Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl1999-06-30030 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl LIC-99-0056, Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-061999-06-22022 June 1999 Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-06 LIC-99-0059, Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning1999-06-22022 June 1999 Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning LIC-99-0054, Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 9908101999-06-0808 June 1999 Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 990810 LIC-99-0052, Forwards Fort Calhoun Station Performance Indicators, for Apr 19991999-06-0202 June 1999 Forwards Fort Calhoun Station Performance Indicators, for Apr 1999 LIC-99-0045, Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl1999-05-26026 May 1999 Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl LIC-99-0046, Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise1999-05-12012 May 1999 Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise LIC-99-0028, Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage1999-04-30030 April 1999 Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage LIC-99-0036, Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F1999-04-28028 April 1999 Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F LIC-99-0043, Forwards Fort Calhoun Performance Indicators Rept for Mar 19991999-04-28028 April 1999 Forwards Fort Calhoun Performance Indicators Rept for Mar 1999 LIC-99-0041, Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager1999-04-27027 April 1999 Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager LIC-99-0037, Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue1999-04-26026 April 1999 Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue LIC-99-0039, Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a1999-04-20020 April 1999 Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a LIC-99-0038, Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl1999-04-20020 April 1999 Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl LIC-99-0033, Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps1999-04-15015 April 1999 Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps LIC-99-0035, Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure1999-04-0808 April 1999 Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure LIC-99-0031, Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate1999-03-31031 March 1999 Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0032, Forwards Fort Calhoun Station Performance Indicators, for Feb 19991999-03-31031 March 1999 Forwards Fort Calhoun Station Performance Indicators, for Feb 1999 LIC-99-0029, Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques1999-03-30030 March 1999 Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques LIC-99-0027, Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld1999-03-16016 March 1999 Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld LIC-99-0022, Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl1999-03-12012 March 1999 Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl LIC-99-0024, Informs That OPPD Withdraws Applications Submitted by 950626 &1999-03-12012 March 1999 Informs That OPPD Withdraws Applications Submitted by 950626 & LIC-99-0016, Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives1999-03-0101 March 1999 Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives LIC-99-0023, Forwards FCS Performance Indicators for Jan 19991999-03-0101 March 1999 Forwards FCS Performance Indicators for Jan 1999 LIC-99-0020, Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included1999-02-24024 February 1999 Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included LIC-99-0011, Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 11999-02-0505 February 1999 Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 1 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARLIC-90-0705, Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl1990-09-17017 September 1990 Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl LIC-90-0745, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions1990-09-17017 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions LIC-90-0717, Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-13013 September 1990 Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 LIC-90-0716, Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls1990-09-13013 September 1990 Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls LIC-90-0740, Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits1990-09-12012 September 1990 Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits LIC-90-0741, Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets1990-09-0707 September 1990 Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets LIC-90-0440, Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes1990-09-0606 September 1990 Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes LIC-90-0667, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 9005291990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 900529 LIC-90-0712, Forwards fitness-for-duty Program Performance Data for Period of Jan-June 19901990-08-31031 August 1990 Forwards fitness-for-duty Program Performance Data for Period of Jan-June 1990 LIC-90-0683, Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations1990-08-27027 August 1990 Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations LIC-90-0627, Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection1990-08-22022 August 1990 Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection LIC-90-0670, Forwards Fort Calhoun Station Performance Indicators for Jul 19901990-08-22022 August 1990 Forwards Fort Calhoun Station Performance Indicators for Jul 1990 LIC-90-0662, Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution1990-08-22022 August 1990 Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution LIC-90-0673, Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl1990-08-22022 August 1990 Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl LIC-90-0636, Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement1990-08-13013 August 1990 Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement LIC-90-0591, Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-21990-08-13013 August 1990 Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-2 LIC-90-0631, Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant1990-08-0808 August 1990 Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant LIC-90-0485, Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints1990-08-0707 August 1990 Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints LIC-90-0645, Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs1990-08-0202 August 1990 Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs LIC-90-0647, Informs That Tl Patterson Assumed Position of Plant Manager, Effective 9008011990-08-0101 August 1990 Informs That Tl Patterson Assumed Position of Plant Manager, Effective 900801 LIC-90-0659, Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 9008101990-07-31031 July 1990 Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 900810 LIC-90-0449, Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.41990-07-20020 July 1990 Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.4 LIC-90-0588, Provides Notification of SPDS Implementation at Plant,Per1990-07-19019 July 1990 Provides Notification of SPDS Implementation at Plant,Per LIC-90-0585, Forwards Simulator Malfunction Cause & Effects1990-07-18018 July 1990 Forwards Simulator Malfunction Cause & Effects ML20055D9351990-07-0202 July 1990 Forwards Fort Calhoun Station Performance Indicators,May 1990 LIC-90-0564, Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility1990-06-29029 June 1990 Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility LIC-90-0522, Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated1990-06-29029 June 1990 Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated LIC-90-0566, Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne1990-06-29029 June 1990 Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne LIC-90-0488, Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements1990-06-29029 June 1990 Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements LIC-90-0446, Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs1990-06-28028 June 1990 Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs LIC-90-0429, Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided1990-06-28028 June 1990 Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided ML20043J0611990-06-22022 June 1990 Responds to NRC 900523 Ltr Re Violations Noted in Insp Rept 50-285/90-29.Corrective Actions:Five Chemistry Technicians Provided Refresher Training on 900427 on Existing EPIP-EOF-6 ML20044A1631990-06-22022 June 1990 Requests That NRC Continue Processing Exemption Request for Configuration of wide-range Nuclear Instrumentation Cables in Fire Area 34B (Upper Electrical Penetration Room). Emergency Boration Added to Achieve Safe Shutdown ML20044A4961990-06-18018 June 1990 Forwards Supplemental Application for Amend to License DPR-40,making Administrative Corrections to Tech Specs. Procedure SO-G-70, Chemical Control Also Encl ML20043G2981990-06-14014 June 1990 Provides Followup to Special Rept on Inoperable Fire Barriers.Eight Inoperable Dampers Replaced Under Mod MR-FC-87-036, Fire Damper Replacement. Remaining 38 Dampers Found to Be Acceptable After Damper Design Review ML20043E6451990-06-0808 June 1990 Provides Supplemental Response to Generic Ltr 88-17 & NRC Bulletin 80-12.Plant Pumps & Suction Header Piping Not Originally Constructed for Use as Backup to LPSI Sys for Shutdown Cooling ML20043E0071990-06-0101 June 1990 Discusses Rev to Previous Commitments Made in Response to Requirements of 10CFR50,App R,Section Iii.G Re post-fire Repairs to Equipment Required for Cold Shutdown Following Fire in Fire Area 6 ML20043G3281990-06-0101 June 1990 Advises That Personnel at Util Reviewed Reactor Operator Licensing Exam Administered on 900529.Comments on Exam Encl ML20043C1811990-05-29029 May 1990 Advises That Util Has Cleaned RW HXs AC-1A & AC-1D & Will Clean AC-1C by 900615 ML20043B4981990-05-24024 May 1990 Updates Schedule for Submitting Results of PORV Block Valve Prototype Testing.Establishment of Test Parameters & Development of Test Procedures Tentatively Scheduled for Submittal in Nov 1990.Final Rept Expected by 910630 ML20043B5061990-05-23023 May 1990 Advises That Testing to Verify Operability of Hydrogen Purge Sys Successfully Completed During 1990 Refueling Outage.Proposed Tech Spec Rev Will Be Submitted by 900701 ML20043B4731990-05-23023 May 1990 Forwards Fort Calhoun Station Performance Indicators, Monthly Rept for Apr 1990 ML20043A7821990-05-18018 May 1990 Advises That Licensee Plans to Replace Valves HCV-247 & HCV-2988 During 1991 Refueling Outage Pending Successful Redesign & Retesting of New Valves by Valcor ML20043A8021990-05-18018 May 1990 Advises That Walkdown of safety-related Portions of Plant to Verify Accuracy of Fire Barrier Penetration Drawings & Surveillance Tests Will Be Completed by 900831 ML20043B0391990-05-16016 May 1990 Informs of Current Status of Post Accident Sampling Sys. Program Meets Min Requirements & Fulfills Conditions of Tech Spec 5.15 ML20042G9861990-05-11011 May 1990 Forwards Rev 0 to Interim Operability Criteria (Ioc) Criteria for Performing Safety Analysis for Interim Operability of Piping, Resulting from Discussion at 900306 & 0418 Meetings ML20042G9571990-05-10010 May 1990 Forwards Suppl to Application for Amend to License DPR-40, Making Administrative Clarification to Chloride Sampling Requirements.Standing Order Procedure S.O.-M-10, Tool Accountability Also Encl ML20042G9981990-05-10010 May 1990 Forwards Proprietary & Nonproprietary Rev 13 to EPIP-EOF-18, Offsite Radiological Surveys. ML20042H0021990-05-10010 May 1990 Fowards Fort Calhoun Station Performance Indicators,Mar 1990, Monthly Rept ML20042G4671990-05-0909 May 1990 Forwards Application for Amend to License DPR-40,changing Chemical & Vol Control Sys 1990-09-07
[Table view] |
Text
e o
Omaha Public Power District 1623 HARNEY 8 OMAHA. NEBRASMA 68102 e TELEPHONE 536 4000 AREA CODE 402 August 26, 1982 Nuclear Regulatory Commission Office of Antitrust & Indemnity Nuclear Reactor Regulation Washington, D.C. 20555 Attn: Ira Dinitz, Indemnity Specialist Re: Docket No. 50-285 Agreement No. B-67
Dear Mr. Dinitz:
Enclosed are copies of Endorsement Nos. 44, 45, 46 and 47 for the MAELU Policy No. MF-63 and Endorsement Nos. 51, 52, 53, 54 and 55 for the NEL-PIA Policy No. NF-207.
If you have any questions regarding these endorsements, please let us know.
Sincerely, 4 2A H. E. Petersen Manager - Insurance HEP /jr Enclosures pn a oI 8208310193 820826 PDR ADOCK 05000285 J PDR cuetOvucut,wggOppORrumiry
a -
r
. NUCLEAR ENERGY UIABILITY INSURANCE MUTUAL ATO MIC ENERGY LIABILITY UNDERWRITERS AMENDMENT O F CONDITION 2 " INSPECTION: SUS PENSIO N" AND DEFINITION O F " INSURED S!IIPMENT" (Indenmified Nuclear Facility)
It is ag reed that:
- 1. Condition 2 " INSPECTION: SUSPENSION" is replaced by the following:
2 INS P ECTIO N:SUSl > E NSIO N The ccmpanies shall at any time be pe rmitted but not obligated to inspect the facility and all operations relating thereto and to examine the insured's books and records as far as they relate to the subject of this insurance and any property insurance afforded the insured through any company who is a member of Mutual Atomic Energy Reinsurance Po ol . If a representative of the companies discovers a condition which he believes to be unduly dangeruuu with respect to the nuclear energy hazard, a representative of the companies may recluest that such condition be corrected withuut delay. In the event of noncompliance with such request, a representative of the companies may, by notice to the named insured, to any other person or organization considered by the companies to be responsible for tha continuation of such dangerous condition, and to the United States Nuclear Regulato ry Commission, suspend this insurance with respect to the nuned insured and such other person or organization effective 12:00 midnight of the next business d ay of such Commission following the date that such Commission receives such notice. The period of such suspension shall terminate as of the time stated in a written notice from the companies to the named insured and to each such person or organization that such condition has been corrected.
Neither the right to make such inspections and examinations nar the making thereof nar any advice or report resulting therefrom shall constitute an under taking, on behalf of or for the bancfit of the insured or others, to determine or warrant that such facility o r ope rations a re s a fe o r h ealthful, o r a re in complia nce with any law, rule or regulation. In consideration of the issuance or continuation of this policy, the insured agrees that neither the companies nor any persons or organizations making such inspec-tions or examinations on their behalf shall be liable with respect to injury to or destruction of property at the facility, or any consequential loss or expense resulting the ref rom, o r any loss resulting from interruption of business or manufacture, a rising out of the making of or a failure to make any such inspection or examination, or any report thereon, or any such suspension of
o .
Pa ge 2 o.f 2 insurance, but this provision does nat limit the contractual obligations of the companies under this policy o r any policy affording the insured property insurance through any company who is a member of Mutual Atomic Energy Reinsurance Pool.
2 The definition of " insured shipment" in Insuring Agreement III,
" DEFINITIONS" is replaced by the following:
" insured shipment" means a shipment of source material, special nuclea r mate rial, spent fuel, wa ste, o r tailing s o r wastes produced by the extraction or concentration of uranium or tharium from any ore processed primarily for its source mate rial content, he rein called " material," (1) to the facility from any location except an indemnified nuclea r facility, but only if the transportation of the material is not by predetermina-tion to be inte rrupted by remaval of the mate rial f rom a trans-porting conveyance for any purpose other than the continuation of its transportation, o r (2) from the facility to any other location, but only until the material is removed from a transporting conveyance for any p 2rpoce other than the continuation of its t ra n s p o r ta tio n .
Effective Date of To form a part this Endorsement Januaq 1, 1981 of Policy No.
I'F-63 12:01 A. M. Standa rd Time n Nblic Pc.er District I s s u e d t o _ _ __.___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _
Date of Issue rarch 20, 1981
_j/ For the Subscribing Companies
,,ut t,, s - ao
, :J Mutual Atomic Ene rgy Liability Underwriters n .e,&,ia m u dkinf g lax cun.
By ___ __ _________ __
,e iv / ]
7;,3-.
q,-
Endo rsement No.
^ Countersigned by 1/1/S1 ME-805
t ,
NUCLEAR ENERGY LIABILITY INSURANCE MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ADVANCE PREMIUM ENDORSEMENT and STANDARD PREMIUM ENDORSEMENT Calendar Year 1982
- 1. ADVANCE PREMIUM It is agreed that the Advance Premium due the companies for the calendar year designated above is $ 80,116.88 .
- 2. STANDARD PREMIUM AND RESERVE PREMIUM In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium and Reserve Premium are:
Standard Premium $ 80,116.88 .
Reserve Premium $ 60,213.83 .
Effective Date of To form a part this Endorserent January 1, 1982 of Policy No. MF 63 Issued to Omaha Public Power District Date of Issue January 6, 1982 7:n;is To co :n Tuar ims is A -
'3'
- For the Subscribing Companies
(
(F AL itTY IL PV) f:0 Mi 3 r,a 1:enin is ATFCKota critta Ints '
1 1RJt CDP (,
By 4/a b a ,
Endorsement No. 45 Countersigned by b
AUTHORIZ5D REPRESENTATIVE
e -
O ,
NUCLEAR ENERGY LIABILITY INSURANCE MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS AMENDMENTS OF DEFINITION OF " NUCLEAR ENERGY HAZ ARD' AND PART OF CONDITION 4. " LIMITATION OF LIABILITY COMMON OCCURRENCE" (Indemnified Nuclear Facility)
It is agreed that:
- 1. In Insuring Agreement III, " DEFINITIONS", solely with respect to an " insured shipment" to which this policy applies as proof of financial protection required by the Nuclear Regulatory Commission, Subdivision (2) of the definition of
" nuclear energy hazard", as amended, is further amended to read:
(2) the nuclear material is in an insured shipment which is away from any other nuclear facility and is in the course of transportation , including the handling and temporary storage incidental thereto, within (a) the territorial limits of the United States of America, its territories or possessions , or Puerto Rico; or (b) international waters or airspace, provided that the nuclear material is in the course of transportation between two points located within the territorial limits described in (a) above and there are no devia-tions in the course of the transportation for the purpose of going to any other country, state or nation, except a deviation in the course of said transportation for the purpose of going to or returning from a port or place of refuge as the result of an em.ergency.
- 2. Subdivision (b) of Condition 4, " LIMITATION OF LIABILITY: COMMON OCCUR-RENCE", as amended, is replaced by the following:
(b) source material, special nuclear material, spent fuel, waste, or tailings c- " castes produce: by the extraction or concentration of uraniam or thorium from any ore processed primarily for its source material content in the course of transportation for which insurance is afforded under this policy and also arising out of such properties of other source material, special r,uclear material, spent fuel, waste, or tailings or wastes produced by the extraction or concentration of uranium or thorium from any ore L_
a .
/
. processed primarily for its source material content in the course of transportation for which insurance is afforded under one or more other Nuclear Energy Liability Policies (Facility Form) issued by Mutual Atomic Energy Liability Underwriters.
Effective Date of To form a part This Endorsement January 1, 1982 of Polic) No. Mr-63 12 : 01 A . M Standard Time Issued to Omaha Public Power ni nt rice Date of Issue February 1, 1982 For the Subscribing Companies By Endorsement ': o . 46 Countersigned b , _
k y J
. .L3 I. s i.
j,yd
.,;~
i i
l 1
1 l
l l
l l
Page 2 of 2 '!E-58
~
NUCLEAR ENERGY LIABILZTY YNSURANCE MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS
- l. MEDIDE T AD/ANCE PPDiIU4 E'DOPSDE7f
- 2. STANDARD PRD4IU4 AND RESEWE PRD4IU'4 ENDOPSDER
- 3. REIURN PRD4IUM EUE .
- 1. Advance Prenian It is agreed that the Amended Advance Praniu:n due the capanies for the calendar year 1981 is s67.nsa.as .
- 2. Standard Preniun and Peserve Prenium Subject to the provisions of the Industry Credit Rating Plan, it is agreed that the Standard Premiun and Reserve Prenium for the calendar yea ~r designated aime are:
Standard Praniun $67,058.35 Reserve Pranium $50,289.34
- 3. Return Pre:niun $9,317.90 .
t e' ;
- {
Effective Date of
~
To fonn a part -
this Endorsenent January 1, 1981 _ of Policy No. MF-63 Issued to Omaha Public Power District Date of Issue April 20, 1982 For the Subscribing Caganies
'. 1 IUGIIC ENEPGY LIABILITY UNDEF5'dTERS
/
i BY -
,- -e
,O -- -- r . ct caz .u m4 0 c oe
\._./ cua t mee t . : 'au.;t, o cu Fiu . tnue#, it ems 4 imp xc,no eN .c oet, eto io,s.se cc. , ae o mea to , w on. v tm 7 nota 6caer.1 las rse e o , s i s
e _ =. caa co,F..,
. snet u
- 'S t is. s: va <n I ailus O p *- ]
n , r. s % a m.. 1 o m.m,.-.m i n je ! ve r a . F A 10 7 sm o ad ,., U r.e er d Au t he t f ue acJ L de aswrem e ccer, , L td u . n m ,,, . 's.,* 4A 4 t
- 1.3240'6 g o Gren u m a .M ,,, e o , u e Mar %cr ; % ame to . De, 443 L lrsoM st . .;rc e ster , 'A 7 6 3 uza6
.4MsN
,--e J4 y e-4 'e4 s
3 Nr t h e d Ac c i ! eat and l Me'n i t y c ) . Nrt or$ f Flaza. Nrthr d, c t - b ' 15 7.034153 6J c Q *> B MJrt 'sj it g4* t'; t ler 'e g d ob
%{M, LO . 'Pe. s6 rr0Mf(t $t 8' r * 'J ro . (t NIf . 4 9ts2 4 Q
a e.n:s u..r.m e w. . a penon . ,% t c . 9 ". Si ma H 3 c, j
.m vam t, u . ne. u ~a vea t a . , >.e. n r . , v 1:w wa a c) 4. 2
- s .m e u a sein wr u.,
v ers u se , to or s ,o.
sm, re,a u m - c -, e se. .; . . , o %. m . ac, 5 - e. n; . u i t. . 4 . t we, o se tor st . , me. w,w
+ im
<,e. , is ,m i esns
,. e:wnm )
e 62 w mg ,-e g , y 2, t t.co e, ..t r.1 vs . in w e,w s , - o .n. ,e . . s );-p w ocau m , pu,,mv rom m,, '*e, i u %r t s N eu st
%20m a,a ,
ed gc j
.r i t t e :> v ' .tesn 4 g p L.:,
< r .o r n i aa. - i t, u . t . ~. , ,n.w , n , . . , . ,,1 ,, o k . v .;4 .3n m y o ree r t en Murs-c e N . 6e %ie A,e . recre, sa map
. t:4:32 g C a (c J ! 00 so Mer iJ14n s . t r.d s ic opa t i s , h at2 ? 24a;(4 g
,~..-e.- - ~ , ~
u cea . :c,e.n,trav.cn w e. r,,
,. a.m e.n .:m . ,wu e %C gcte ok o aci .ne a mm, 4 r ra .i nu c m., y+ . N% e 4. , r i u,,
.,. t e .n,u . 9 u:t o,o . s ., , 2 u . n i w. s t r t . to M 3. p ci o c. g se cui ei.e s rarine ins u. . ws 3e o r ., .t, o ,
..s* ,-
.. ,,,n.. w a st.. . r oi . -s m
ssic? 4. e m .
.4 i m4
,,, >* M g - g
' t a t e F a r* 6,re 4s.4 i ,3 . m o mstay, w it,(e .lli l as t ea s e tn iton s t , , S lorta e .n , IL 6I701 . 8? rs4 7 od 4 hC Trw,acrics [m esn.efmSaa, O. in s il' t. , t .y , Anp. , ca . . . . . 3 21r a t g e j .#d 4
t rw en t r ac m.t , c my .
e1*e j ' . ? J te , f e i l t 1 and a
're. ca. 5.e, sure. Nrto,a. ci ain
,r ket y (. 0 ia mm IC4J'M9 oeU o 9 ,
I 3 L l 'J*st s t , $4 ] t iaore , ML ll /' ' g V t t e 1 5 t s t e: f a re lmr4m e t )., PJ .i o ? 9 * . *e ' r 1 S t t .e .. (1 O ,c c n m ,, an e w . v <<< me r .1 , ww > :1 + ?, , a q ! 7 )
cann y2 yy 4 0 oo b g4 r 6n te O ,p 4 .d g th s r or ent January 1, 1981 To form a part of Policy I - 7 12.01 A.M. Standard Time issued to Omaha Public Power District Date of issue flarch 12, 1981 For the su scribing co panies O r By _ .-
I General Manager Endorsement No _ 51 Countersigned by
( (1/S1)
(
~
- Nuclear Energy Llability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDMENTS OF DEFINITION OF " NUCLEAR ENERGY HAZAR0" AND PART OF CONDITION 4, " LIMITATION OF LIABILITY; COMMON OCCURRENCE" (Indemnified Nuclear Facility)
It is agreed that:
- 1. In Insuring Agreement III, " DEFINITIONS", solely with respect to an
" insured shipment" to which this policy applies as proof of financial protection required by the Nuclear Regulatory Commission, Subdivision (2) of the definition of " nuclear energy hazard", as amended, is further amended to read:
3 (2) the nuclear material is in an insured shipment which is away from aa n any other nuclear facility and is in the course of transportation, jja including the handling and temporary storage incidental thereto, within
.u an U 9$- (a) the territorial limits of the United States of America, its c h 7j territories or possessions, or Puerto Rico; or 5"MN uEam (b) international waters or airspace, provided that the nuclear
., a 3 ;j material is in the course of transportation between two points d b -, / located within the territorial limits described in (a) above and o3s2"4{
, there are no deviations in the course of the transportation for 3 , if the purpose of going to any other country, state or nation, except a deviation in the course of said transportation for the purpose L o J; e4 9
- of going to or returning from a port or place of refuge as the il ' , s result of an emergency.
e ,; C "
n< : Subdivision (b) of Condition 4, " LIMITATION OF LIABILITY; COMMON OCCURRENCE",
[lj3- b T as amended, is replaced by the following:
ea s; U$y[ _ (b) source material, special nuclear material, spent fuel, waste, or tailings US 0 ( 7- or wastes produced by the extraction or concentration of uranium or O l; y c J thorium from any ore processed primarily for its source material content S4 A E -
in the course of transportation for which insurance is afforded under NyE f this policy and also arising out of such properties of other source
"{7I aoft " from any ore processed primarily for its source material content in the 2yu"
" " ~ ~
i course of transportation for which insurance is afforded under one or more 6t.nsr Nuclear Energy Liability Policies (Facility Form) issued by Nuclear Energy Liability Insurance Association.
inEs*$orNm'en't January 1, 1982 To form a part of Policy No issu,a ,, OMAHA PUBLIC 9dME N IS M & ""*
Date of issue December 17, 1981 For the su icribing ce panies By _ ..
General Manager 52 // /
Endorsement No CounterslGnad by _m NE-58 (1/1/82)
Nuclzar Entrgy Licbility Insurancs NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMlUM AND STANDARD PHEMlUM CALENDAR YEAR 1982 ENDDRSEMENT
- 1. ADVANCE PREMIUM: It is agreed that the Advance Prenium due the companies for the period designated above is:
$ 275,958.12 .
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is:
$ 207,403.17 .
This is to certify that thin to i n a copy or the original Endorseront having (12 m ~ ^x . . nr a11 being made part of the !!ud e . ,s !. '
re' (Pacility Form) as des-Ignaira he *
. S a 1.r.e - c c.me i~ c fi uI J11 horcunder.
1 Jo > L. ttrocchi.'Viec Pres ~ent-Lutbt ny Unden #
A mencan Nue: car Insurers Ef fective Date of this Endorsement Jantiary 1,1982 NF-207 To form a part of Policy No 12:01 A.M. Standard Time _
issued to _0:4AllAfDELICl0WER_aI1IRICT _ _ _
For the su scribing co panies oate of issue. December _ll._1S&L_
By .
/
f_ I General _ Manager Endcrsement No _ Countersigned by._ _ _ _ . _ _ _ _ _ _ _ _ . . _
M
, Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHAtlGES If1 SUBSCRIBIflG COMPANIES AtlD If4 THEIR PROP 0RTI0flATE LIABILITY ENDORSEMENT Calendar Year 1982 a
- 1. It is agreed that with respect to bodily injury or property damage caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word " companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury or property damage as designated below. r e
e
- 2. It is agreed that the effective period of this endorsement is from the be,gi ng of the effective date of this endorsement stated below to the close of December Alo, 982 or to the time of the termination or cancellation of the policy, if sooner. Ggg SUBSCRIBl%5 COMPA%IES t:3 h
- Pit 0 PORTION OF 1100 g $4
+ 0 0 O h 'cf Aetna Casualty ard Surety Co.. The,151 Farmington Ave. Hartford, CT 06156 Aetna Insurance Company. 55 Elm St.. Hartford, CT 06115 9.957349 3.153160 d
ccs #M go h -
Af filtated FM Insurance Co.. Allendale Park. P.O. Son 7500. Johnston. RI 02919 0.248934 4 d .a y Alliant Insurance Company, f,435 Wilshire Blvd., los An9eles. CA 90054 1.327647 3 cd oo Allstate Insurance Co.. Allstate Plata South - G1, Northbrook. !L 60062 4.978675 % q c3
- 4erican Home Assur ance Co. 102 Maiden Lane, new York. NY 10005 0.871268 ;oN American Motorists Insurance Co., Long Grove. IL f 004 9 0.414890 -)
Bituminous Casualty Corporation. 320-18th 5t., Rock Island. !L 61201 a 0.414890 1 g ed .
Centennial Insurance Co.. Atlantic Bu11 din 9. 45 hall Street. New York. hv 10005 Corr'ercial unton Insurance Co., one Beacon St.. Boston, MA 02108 0.248934 3.319116 o4 H O I
Connecticut indemnity Company. The. 9 Farm Springs Rd.. Farmington. CT 06032 0.414890 .a r-1 44 pl Continental Casualty Co.. ChA Plata. Chicago. IL 60685 4.148895 . ,o k -
Continental Insu rance Co., Tae. 80 Maiden La. 9ew York. NY 10038 3 Federal Insurance Co. 51 John F. Kennedy Parkway. Short Hills. MJ 07078 7.675457 1.493602 1 *5C3 C2 3
Fireman's f und Insurance Compantes. P.O. Son 3395. San Francisco, CA 94159 5.310586 J. +2 H.,,, 3 Geeeral Accident Insurance Company of America. 414 Walnut St.. PPiladelphia, PA 19105 1.327647 H Hanover Insur ance Co.. The. 440 Lincoln St.. Worcester. MA 01605 o
- fH 0.497867 Hartford A.cident and Indemnity Co.. Hartford P1 era. Hartford. CT 06115 Hartford Steam Botter Insp. 4 Ins. Co.. The. 56 Prospect St.. Hartford CT 06102 Highlands Insurance Co., 600 Jef ferson St. Houston TI 77002 7.053122 0.497867 h]oc c c3 cd Home Indemntty Co.. Toe. 59 Maiden Lane. New York, hr 10038 0.414890 o a kU 3.651028 g ;; O fg 3
Insurance Co. of North America. P.O. Bos 7728. Philadelphta. PA 19101 1.659558 4 Monarch Insurance Co. of Ohio. The.19 Rector St.. hew Trrk MY 10006 Northern Insurance Company of New York, P.O. Bon 1228. Bal timore, M3 21203 0.331912 2.240404
- 3 yM Northwestern kattonal Ins. Co. 731 No. Jackson St.. Milwaukee. wi 53201
,, 9 g ,w, 0.663823 yo O .
Chio Casualty Insurance Coepany. The.136 horth Third 5t.. Hamilton. CH 45025 Pacific indemat ty Co. 51 John F. Kennedy Parkway. Shrt Hills. NJ 07078 0.165956 C, y Z #E 0.331912 ..-,s f,5 Peerless Insurance Co. 62 Maple Ave. Beene. NH 03431 Protective Insurance Co., 3100 No. Meridian St.. Indianapol ts. IM 46208 0.124467 o b 9 c. f g Pravideace Wasniagtoe imurance Co., 20 bashington Place. Providence. At 02903 0.248934 7 ,c g3 o
Rellance Insurance Company. 4 Penn Center Plata. Philadelphia PA 19103 0.165956
'# o O* { ~ T, 0.995735 *3 Royal Insurance Company of Amertca.150 William Street. New York. MY 10033 3.319116 Cr4 $Z 5t. Paul Fire & Martre Ins. Co. 385 Washington St.. St. Paul. M's $5102 4.699869 a3 U M 7 R dh a j Seaboard Surety Co. 90 W111 tam St., hew York, NY 10038 0.165956 State Farm F1 e & Casualty Company.117 East Hashington St., 81oomin9 ton. IL 61701 0.829779 i oOM Transamerica insurance Comparg. P.O. Bon 54256. Los Anacles. CA 90054 0.829779 A /p -g j Travelers Indematty Company, The, One Tower Square. Hartford. CT 06115 a O ,y United States Fidellty and Guaranty Co. 100 Light St.. Baltimore. "3 21202 10.787128 d ~ c~.,4 4 10.45521' g Unt ted States Fire Insurance Co.. P.O. Bos 2387. Morristown. %1 07960 Zurich Insurance Co. 231 No. Martingale #d., Schaumburg !L 60196 3.319116 1.244669 h o 53 Effective Date of this Endorsement Muuary I s l982 To form a part of Policy No.
12:01 A. M. Standard Time issued to Oraha Public Power District For the sub ribing companies Date of issue Mmh 9.14W)
- By l M~ Gjnpral Manager Endorsement No. M Countersi y / ,/- v--
(1/82)
Nu lear Energy LI:bility insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM END0RSEMENT CALENDAR YEAR 1981 It is agreed that Items la. and Ib. of Endorsement No. 49 are amended to read:
la. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $ 230.978.75 .
Ib. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is: $ 173.218.86 .
Return Premium: $32,095.00 .
l This is to certify that this is a true copy of the origina d part Endorsement having the endorsecont number and being Form) as des-d of the Nuclear Energy Liability Policy (F
._ i
~ *
(g4 {c yU l0 Je n 1,. Quattrwhi. Vice P'"i*"t.1, a American Ntxtear insurm e 0a Effegt
, ,emen January 1, 1981 NF-207 To form a part of Policy No 12:n1 A.M. Standard Time issued to Omaha Public Power District Date of issue AP ril 20, 1982 For the s scribing co panies B y ____ _ ~_
'i ~Q4neral Manager Endorsement No 55 \
Countersigned by -i NE-36 e s