Drain Stop Valves for RHR Pump 1-2 Loop 4 Cold Leg
ML20062M620
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/21/1982
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20062M570 List:
References
RP-4, NUDOCS 8208200158
Download: ML20062M620 (1)


Text

.

PACIFIC GAS AND ELECTRIC COMPANY Di:PARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT ISI REPAIR PROGRAM PLAN Diablo Canyon Power Plant, Unit No.1 Procedure: RP-4 Drain Stop Valves for the Residual Heat Removal Pump 1-2 Loop 4 Cold Leg The valves were found to be leaking around the seats during routine testing.

The inservice inspection program for Diablo Canyon, Unit No. 1 is based upon the ASME Section XI code, 1977 edition including Summer 1978 Addendum, Class 1.

The valve was designed and fabricated in accordance with the requirements of ANSI B31.1 1968 edition. The valve is a 3/4", 1500#, Hand Operated Angle Valve and was manufactured by Rockwell Manufacturing Company. The valve bonnet and body is SA 182 GrF 316, disc is SA 276 GrCFA hard surfaced with Stellite.

Repairs will be made in accordance with the following:

1. Disassemble valve, remove bonnet from body, remove seal weld by machining and/or grinding in accordance with IWB-4220 of Section XI Sumier 1978 Addendum.
2. Lap seating surfaces to dimensions specified on the manufacturer's drawing.
3. Reinstall disc.
4. Seal weld the body to bonnet using Procedure WPS 4.9.
5. Liquid penetrant examine (ISI-PT-1) weld which will be in accordance with ASME Section V requirements.
6. Pressure test after reinstallation will be in accordance with IWA-5214 and IWA-5000 of the Summer 1978 Addendum.
7. Quality assurance will be in accordance with PGandE's Quality Ascurance Program for nuclear power plants.
8. Documentation will be in accordance with Section XI and the repair will be recorded on Form NIS-2 per Code Case N-308.
9. The services of an Authorized Nuclear Inservice Inspector will be used for the repair.

Prepared .

' Date G 91 Maintenance Engineer #

Reviewed M 8 8 Date[!25/fz 7 Quality Control /ISI / /

G DbDO O!$oh$$5 Approved N I Plant Manager Date 7/2//gz PDR f