ML20062L599
| ML20062L599 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/20/1993 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20062L596 | List: |
| References | |
| NUDOCS 9401030211 | |
| Download: ML20062L599 (1) | |
Text
.
3/4.7-PLANT SYSTEMS
~
3/4 ~ 7.1-SERVICE WATER SYSTEMS
.- RESIDUAL HEAT REMOVAL SERVICE WATER SYSTEM - COMMON SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.1 At least the following independent residual heat removal service water (RHRSW) system subsystems, with each subsystem comprised of:
a.
Two OPERABLE RHRSW pumps, and b.
An OPERABLE flow path capable of taking suction from the RHR service water pumps wet pits which are supplied from the spray pond or the cooling tower basin and transferring the water through one Unit 2 RHR heat exchanger, shall be OPERABLE:
a.
In OPERATIONAL CONDITIONS 1, 2, and 3, two subsystems.
b.
In OPERATIONAL CONDITIONS 4 and 5, the subsystem (s) associated with systems and components required OPERABLE by Specification 3.4.9.2, 3.9.11.1, and 3.9.11.2.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, 4, and 5.
ACTION:
a.
In OPERATIONAL CONDITION 1, 2, or 3:
1.
With one RHRSW pump inoperable, restore the inoperable pump to OPERABLE status within 30 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
With one RHRSW pump in each subsystem inoperable, restore at least one of the inoperable P11RSW pumps to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.
With one RHRSW subsystem otherwise inoperable, restore the inoperable subsystem to OPERABLE status with at least one OPERABLE RHRSW pump within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHilTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.#
l 4.
With both RHRSW subsystems otherwise inoperable, restore at least one subsystem to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN
- within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- Whenever both RHRSW subsystems are inoperable, if unable to attain COLD SHUTDOWN as required by this ACTION, maintain reactor coolant temperature as low as practical by use of alternate heat removal methods.
- The allowed outage time (A0T) of the "A" and "B" loops of RHRSW may be extended up to 288 hours0.00333 days <br />0.08 hours <br />4.761905e-4 weeks <br />1.09584e-4 months <br /> (12 days) to allow for the installation of isolation valves upstream of 1(2)F014A(B) and downstream of 1(2)F068A(B) during the fifth Unit I refueling outage (IR05).
LIMERICK - UNIT 2 3/4 7-1 4
9401030211 931220 F2 PDR ADOCK 05000353 F,
P PDR g'