ML20062K008

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-261/82-25 on 820706-09.No Noncompliance Noted
ML20062K008
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/26/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Jackie Jones
Carolina Power & Light Co
Shared Package
ML20062K011 List:
References
NUDOCS 8208160522
Download: ML20062K008 (2)


See also: IR 05000261/1982025

Text

{{#Wiki_filter:..

   .
     .
         ,
                                                                             %\taE
                                    July 26, 1982
       Carolina Power and Light Company
       ATTN: Mr. J. A. Jones, Senior Executive
                 Vice President and Chief
                 Operating Officer
       411 Fayetteville Street
       Raleigh, NC 27602
       Gentlemen:
       Subject: Report No. 50-261/82-25
       This refers to the routine safety inspection conducted by Mr. R. H. Albright of
       this office on July 6-9, 1982, of activities authorized by NRC Operating License
       No. DPR-23 for the H. B. Robinson facility and to the discussion of our findings
       held with Mr. C. W. Crawford, Manager Operations and Maintenance at the con-
       clusion of the inspection.
       Areas examined during the inspection and our findings are discussed in the
       enclosed inspection report.     hithin these areas, the inspection consisted of
       selective examinations of procedures and representative records, interviews with
       personnel, and observations by the inspector.
       Within the scope of this inspection, no violations or deviations were disclosed.
       We have examined actions you have taken with regard to previously reported
       unresolved items. The status of these items is discussed in the enclosed
       inspection report.
       In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
       be placed in the NRC's Public Document Room unless you notify this office, by
       telephone, within ten days of the date of this letter and submit written
       application to withhold information contained therein within thirty days of the
       date of this letter. Such application must be consistent with the requirements
       of 10 CFR 2.790(b)(1).
       Should you have any questions concerning this letter, we will be glad to discuss
       them with you.
                                             Sincerely,
                                             (Orginal signed by D. M. Verrelli)
                                             D. M. Verrelli, Chief
                                             Reactor Projects Branch 1
                                             Division of Project and
                                                Resident Programs
       Enclosure (See Page 2)
 C'208160522 820726
 PDR ADOCK 05000261
 O                  PDR
                                                                                    {{g
 , ,   .
     .     .
         Carolina Power and Light Company          2             July 26, 1982
         Enclosure:
         Inspection Report No. 50-261/82-25
         cc w/ encl:
         R. B. Starkey, Jr. , Plant General Manager
         bec w/ enc 1:
         Document Management Branch
         State of South Carolina
         NRC Resident Inspector

l ! l

         RII                         R               RII-    '           RII     /

( g/d b^F Pd j RHAlbright:es arr AKHardin DMVerelli l 7Mc/82 7M/82 7/: /82 7/z$/82 , ! l

                                            .

' l }}