ML20062J856
| ML20062J856 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/30/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20062J861 | List: |
| References | |
| NUDOCS 8208160485 | |
| Download: ML20062J856 (4) | |
See also: IR 05000397/1982016
Text
, _ _ _ _ - _
S
'4
'T:,3
], -
{j
'ia
"
"
,
.
c.
,
,
-
['
o.
y&Y
-
Docket No. 50-397
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Dr. R. G. Matlock
Procram Director
Gentlemen:
Subject: ilRC Inspection
This refers to the inspection conducted by fir. J. Elin of this office on
July 19-22, 1982 of activities authorized by flRC Construction Permit
flo. CPPR-93, and to the discussion of our findings held by Mr. Elin with
fir. Carlisle and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
fio items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the flRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
8208160485 820730
PDR ADOCK 05000397
l[ Q ,\\
G
ppg
omcq
RV/jk
g
..E. h f , ,00hf{.
,y.,
.
..T,
"
"
" "
" " ~ ~ ~ >
,,
.
.
... ,
^ " > .7/M82
7&.c(.82. . .
. 769/.82..
..
...
,,. .
, .. .
.
.
. . .
. .. .
,
NRC 7 0RM 318 :10 80t NRCM U2 40
OFFICIAL RECORD COPY
" "*-32*
-_ ___ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
.
Washington Public Power Supply System
-2-
,
Should you have any questions concerning this inspection, we will be glad
to discuss'them with you.
' Sincerely,
I
-[. LU : Shhe;g,
'
'
T. W. Bishop Chief
.
Reactor Construction Projects Branch
Enclosure:
,
NRC Inspection Report
,
flo. 50-397/82-16
,
.
cc w/o enclosure:
R. B. Glasscock, Quality Assurance Director
C. S. Carlisle, Deputy Program Manager
bcc: ' DMB/ Document control Desk (RIDS)
,
Distributed by RV:
State of WA (Lewis)
'
ResidentInspector(2)
'
Engelken(1tr).
-
"
.
P
a-
w
d
,
h
I
pM etoq[o,,
d
UNITE 3 STATES
[
g
NUCLEAR REEULATCRY COMMSSION
'
y.
- j
REGION V
0,,
%,
,o'g
1450 MARIA LANE, SUITE 210
WALNUT CREEK, CALIFORNIA 94596
b...
July 30, 1982
,
Docket No. 50-397
'
Washington Public Power Supply System
P. 0. Box 968
'
Richland, Washington 99352
Attention: Dr. R. G. Matlock
Program Director
Gentlemen:
Subject: NRC Inspection
This refers to the inspection conducted by Mr. J. Elin of this office on
July 19-22, 1982 of activities authorized by NRC Construction Permit
No. CPPR-93, and to the discussion of our findings held by Mr. Elin with
Mr. Carlisle and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter. Such application must be consistent with the
requirementsof2.790(b)(1).
..
%5 W
'-,6
$
ht-
m
A & $a6
.
.
Washington Public Power Supply System
-2-
July 30,1982
Should you 'have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
.
C ---
Q
l.k).IQDf::)
T. W. Bishop, Chief
Reactor Construction Projects Branch
Enclosure:
NRC Inspection Report
No. 50-397/82-16
cc w/o enclosure:
R. B. Glasscock, Quality Assurance Director
C. S. Carlisle, Deputy Program Manager
)
.
.4.
. n_
et,
,.~,1.-.
w " . .w . .. . A
-
. - - .
.
.
. . .