Forwards IE Insp Rept 50-397/82-16 on 820719-22.No Noncompliance Noted
ML20062J856
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/30/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20062J861 List:
References
NUDOCS 8208160485
Download: ML20062J856 (4)


See also: IR 05000397/1982016

Text

,____-_

S

" "

,

'4 'T:,3 ], - {j 'ia

- c. , ,

.

[' o.

y&Y

-

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Dr. R. G. Matlock

Procram Director

Gentlemen:

Subject: ilRC Inspection

This refers to the inspection conducted by fir. J. Elin of this office on

July 19-22, 1982 of activities authorized by flRC Construction Permit

flo. CPPR-93, and to the discussion of our findings held by Mr. Elin with

fir. Carlisle and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

fio items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the flRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

8208160485 820730

PDR ADOCK 05000397

G ppg l[ Q ,\

omcq RV/jk g " " " "

" " ~ ~ ~ > ..E. h f , ,00hf{. ,,

,y., . .

..T, . ... ,

^"> .7/M82 7&.c(.82. . . . 769/.82.. .. ... ,,. . , .. . . . . . . . .. . ,

NRC 7 0RM 318 :10 80t NRCM U2 40 OFFICIAL RECORD COPY " "*-32*

-_ ___ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

.

.

,

Washington Public Power Supply System -2-

Should you have any questions concerning this inspection, we will be glad

to discuss'them with you.

' Sincerely,

I

-[. LU : Shhe;g,

'

'

T. W. Bishop Chief

.

Reactor Construction Projects Branch

Enclosure: ,

,

NRC Inspection Report

flo. 50-397/82-16 ,

.

cc w/o enclosure:

R. B. Glasscock, Quality Assurance Director

C. S. Carlisle, Deputy Program Manager

bcc: ' DMB/ Document control Desk (RIDS) ,

Distributed by RV:

State of WA (Lewis)

'

ResidentInspector(2) '

Engelken(1tr). -

"

.

P

a-

w

d

,

I

h

dpM etoq[o,,

UNITE 3 STATES

'

[ g NUCLEAR REEULATCRY COMMSSION  ;

y. ;j REGION V

0,, 1450 MARIA LANE, SUITE 210

%, ,o'g WALNUT CREEK, CALIFORNIA 94596

b...

July 30, 1982 ,

Docket No. 50-397

'

Washington Public Power Supply System

P. 0. Box 968 '

Richland, Washington 99352

Attention: Dr. R. G. Matlock

Program Director

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Mr. J. Elin of this office on

July 19-22, 1982 of activities authorized by NRC Construction Permit

No. CPPR-93, and to the discussion of our findings held by Mr. Elin with

Mr. Carlisle and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirementsof2.790(b)(1).

..

%5 W '-,6 $ ht- m A & $a6

.

.

Washington Public Power Supply System -2- July 30,1982

Should you 'have any questions concerning this inspection, we will be glad

to discuss them with you.

.

Sincerely,

C --- Q

l.k).IQDf::)

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosure:

NRC Inspection Report

No. 50-397/82-16

cc w/o enclosure:

R. B. Glasscock, Quality Assurance Director

C. S. Carlisle, Deputy Program Manager

)

.

. - - . . . . . . .4.- . n_ et, ,.~,1.-. w " . .w . .. . A