Forwards IE Insp Rept 50-362/82-14 on 820712-16.No Noncompliance Noted
ML20062J600
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/27/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20062J603 List:
References
NUDOCS 8208160415
Download: ML20062J600 (2)


See also: IR 05000362/1982014

Text

-

.

.

s

-

.

JUL 2 7 E

Docket No. 50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection of San Onofre Unit 3

This refers to the routine inspection conducted by Messrs. W. J. Wagner,

G. Hernandez, and G. Perez of this office on July 12-16, 1982 of activities

authorized by NRC Construction Permit No. 98, and to the discussion of

our findings held with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

8208160415 820727

I

PDR ADOCK 05000362

O

PDR

or,,c e >

RV/dc t

g

suaaam>

WAGNEhk HERNk hEZ

PEREZ 3 N

BISH

'

'

b

"7/N/s2""" 7/s7/82"

'7710B2'

"

o yp

..

..

j/. 82

. .

.. .

.

we row aie no ecmcu cuo

OFFICIAL RECORD COPY

~ " ' '8o- 3"

4

Southern California Edison Company

-2-

JUL 2 71932

o

-

Should you have any questions concerning this inspection, we will be glad

to discuss thea with you.

Sincerely,

(

/

LL

(

T. W. Bishop, Chief

Reactor Construction Project Branch

I

'

Enclosure:

Inspection Report

flo. 50-362/82-14

cc w/o enclosure:

R. Dietch, SCE

H. B. Ray, SCE (San Clemente)

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA (Johnson)

Resident Inspector

Project Inspector

RHE (w/o enc)