ML20062J477

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/82-27 on 820622-25.No Noncompliance Noted
ML20062J477
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/22/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20062J480 List:
References
NUDOCS 8208160378
Download: ML20062J477 (2)


See also: IR 05000389/1982027

Text

-

.-

-.

.

.

.-

-

!

y1.l(0Q

~

.

July 22, 1982

Florida Power and Light Company

ATTN:

Dr. R. E. Uhrig, Vice President

,

Advanced Systems and Technology

-

P. O. Box 529100

Miami, FL 33152

Gentlemen:

l

Subject:

Report No. 50-389/32-27

,

This refers to the routine safety inspection conducted by Mr. B. R. Crowley of

this office on June 22-25, 1982, of activities authorized by NRC Construction

,

'

Permit No. CPPR-144 for the St. Lucie facility and to the discussion of our

findings held with Mr. B. J. Escue, Site Manager, at the conclusion of the

inspection.

,

Areas examined during the inspection and our findings are discussed in the

!

enclosed inspection report.

Within these areas, the inspection consisted of

'

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

,

We have examined actions you have taken with regard to previously icentified

i

enforcement matters and unresolved items. The status of these items is discussed

!

in the enclosed report.

l

'

i

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

!

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

'

be placed in the NRC's Public Document Room unless you notify this office, by

'

i

telephone, within ten days of the date of this letter and submit written appli-

!

cation to withhold information contained therein within thirty days of t.hc h ta

,

of this letter.

Such application must be consistent with the requirements of

'

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(Orginal signed by H. C. Dance)

,

H. C. Dance, Chief

t

Reactor Projects Branch 2

Division of Project and

,

,

Resident Programs

Enclosure:

-

See Page 2

i

- . -

8208160378 820722

PDR ADOCK 05000389

"

i

G

PDR

[Qf

-

- - . .

-

. . .

. - .

. _ _ -

_

_-

..

-- .

.-

.

.

-

o

Florida Power and Light Company

2

July 22, 1982

Enclosure:

Inspection Report No. 50-389/82-27

cc w/ encl:

B. J. Escue, Plant Manager

N. Weems, Assistant QA

Construction Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

SII

,R I ['

RI

RII

RII

3

W

jy G

( Nmco[nomos

,.

'BRCrowley:ht

AR rdt

KL

1 dis

HCDance

J

7/f /82

7/y\\/82

7//{ /82

7/.pt /82

/

7/ 7/82