Forwards IE Insp Rept 50-275/82-21 on 820606-0703.No Noncompliance Noted
ML20062J241
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/22/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20062J244 List:
References
NUDOCS 8208160309
Download: ML20062J241 (4)


See also: IR 05000275/1982021

Text

,

,% * m.

jr

.,

y-

.-

Q y

JUL 2 21982

Docket No. 50-275

Pacific Gas and Llectric Company

P. O. Box 7442

San Francisco, California 94106

Attention: Mr. Philip A. Grane Jr.

Assistant General Counsel

Gentlemen:

Subject: UhC Inspection of the Diablo Canyon 1;uclear Plant

'lhis refers to the routine, montly inspection conducted by Messrs.

J. D. Carlson and M.11. Mendonca of this office from June 6,1982,

through July 3, 1982, of activities authorized by NRC License I;o.

DPR-76, and to the discussions of our findings held by Messrs.

Carlson and Hendonca with Mr. Thornberry and other meubers of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

!;o items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with 10 Ci'R 2.790(a), a copy of this letter and the

enclosure will be placed in the liRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of

this letter and submit written application to withhold information

contained herein within thirty days of the date of this letter. Such

application must be consistent with the requirements of 2.790(b)(1) .

~"

8208160309 820722 / [hf

gDRADOCK 05000275

PDR

e-> .

'

. .egr,n,Isc. gg.Q. .S&/' ~, pT..... . . . ... .. ... ... ... .. . .

"""> ..

,,Me,nd,onca T.,, Young ,

Sternberg,, , , , ,,, , ,, , ,, ,,

"k . 7/ /I/.8 2... ... ./lI/.82.. . . . 7. /. .# /.82. . . 712&l.S2.. . . . ... .. .. .. .. . . . . . . . . . . . . . . . . . . . . . .

NRC F ORM 318 IlOr80l NRCM O240 OFFICML RECORD COPY "'* '98o-a29 2.

- -

Pacific ~Gme end Electric Compcny -2- JUL 22 1982

i

Should you have any questions concerning this inspection we.will~be

6 1 ad to discuss them with you.

Sincerely,

. /Jcpod 6,2We+2 :3 re r

D. M. Sternberg, Chief

Reactor Operations Project Branch.

~ Enclosure:

liRC Inspection Report

Ho. 50-275/82-21

cc w/o enclosure:

J. L. Schuyler, PG&E

J. D. Schiffer,-PG&E

W. S. Raymond, PG&E

cc with enclosure:

R. C. Thornberry, PG&E.(Diablo Canyon)

bcc': DMB/ Document Control Desk (RIDS)

Distributed tiy RV:

State of CA (idslas/ Johnson)

Resident Inspector

Engelken~(1tr)

Sandra Silver (Report only

o ne,

'

o, UNITED STATES

8 o NUCLEAR RE!ULATORY COMMISSION

$'

o

,

REGION V

1460 MARIA LANE. SUITE 260

-

4

WALNUT CREEK, CALIFORMA 94596

-

,d

....*

July 22, 1982

Docket No. 50-275

,

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94106

Attention: Mr. Philip A. Crane Jr.

Assistant General Counsel

Gentlemen:

Subj ect : NRC Inspection of the Diablo Canyon Nuclear Plant

This refers to the routine, montly inspection conducted by Messrs.

J. D. Carlson and M. M. Mendonca of this office from June 6, 1982,

through July 3, 1982, of activities authorized by NRC License No.

DPR-76, and to the discussions of our findings held by Messrs.

Carlson and Mendonca with Mr. Thornberry and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of

this letter and submit written application to withhold information

contained herein within thirty days of the date of this letter. Such

application must be consistent with the requirements of 2.790(b)(1) .

7

_ _ . _ . _ - _ - _ _ _ . . - _ ..

9

Pacific Gas and Electric Company -2- Quly 22, 1982

Should you have any questions concerning this inspection we will be

glad to discuss them with you. ,

Sincerely,

_

dd. -

. M. Sternberg, hief

Reactor Operations Proj ect Branch

Enclosure:

NRC Inspection Report

No. 50-275/82-21

cc w/o enclosure:

J. L. Schuyler, PG&E

J. D. Schiffer,.PG&E

W. S. Raymond, PG&E

cc with enclosure:

R. C. Thornberry, PG&E (Diablo Canyon)

l

f

l,

1

i

,

l

i

l

l

l

l

!

~ . . - . - - . - . . .. . ., .

b