O OPERATING DATA REPORT DOCKET NO.

50-302 1

DATE 8/2/82 CONIPLETED ElY D. Bonart TELEPilONE (904) 795-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit #3 N"I'*

2. Reporting Period:

7/1/82 - 7/31/82

?

3. Licensed Thennal Power (Mht):

2544

)

4. Nameplate Itating (Gross SIWE):

890

5. DeGgn Electrical Rating (Net 31We):

825

+

845

6. Stasimum Dependable Capacity (Gross SlWe):

806

7. Stasimum Dependable Capacity (Net SlWe):
8. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Lesel To which Restricted,if Any (Net MWe):

2475 MW thermal.

10. Reasons For Restrictions,if Any:

Pump Power Monitors.

Tius 31onth Yr..t o.Da t e Cumulative

11. Ilours in Reporting Period 744 5088 47208
12. Number Of Ilours Reactor Was Critical 697.6 4077.I 29526.49
13. Reactor Reserve Shutdown llours 51.2 71.1 1280.3
14. Ilours Generator On-Line 659.7 3999.3 28811.48
15. Unit Resene Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWil) 14455227 8994227 64361168
17. Grow Electrical Energy Generated (31Wil) 489164 3052238 21851829
18. Net Electrical Energy Generated (MWil) 464307 2902151 20731449
19. Unit Senice Factor 88.67%

78.60%

61.03%

20. Unit Asailability Factor 88.67%

78.60%

61.03%

l

21. Unit Capacity Factor (Using MDC Net) 77.43%

70.77%

55.97%

22. Unit Capacity Factor (Using DER Net) 75.65%

69.14%

53,23%

23. Unit Forced Outage Rate 11.3%

21.4%

25.9%

24. Shutdowns Scheduled Oser Nest 6 Sionths(Type. Date,and Duration of Facht:

t None

25. If Shut Down At End Of Report Perim. Estimated Date of Startup:
26. Units in Test Status l Prior to Commercial Operation):

Forecast Achiemi 1/14/77 INill A L CRi flCAlll Y l

INill AI. I:LEC T RICIT Y 1/30/77 I

CO\\lMI.RCl \\L OPI:R A flON 3/13/77 8208160093 820809 PDR ADOCK 05000302 R

PDR

4 j

AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO.

Sn in?

UNIT FLCRP-3 DATE 8/2/82 r

~

CO\\1PLETED llY -. D. Bocart TELEPilONE. (904) 795-6486 Sf0NTil July 1982 1

DAY

. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL D1We-Net)

(.\\lWe-Neo i

g 356 37 721 529 799 2

gg 570 759 3

,9 4

588 20 812 5

387 812

^

21 36 756 6

7 23 749 l

624 8

24 791 9

10 773 25 654 10 777 11 739 27 733 12 745 700 l

28 732 13 29 712 14 30 788 15 371 765 3,

259 l

16 L

l l

l l

l i

INSTRUCTIONS On this format, list the aserage daily unit power lesel in NtWe-Net for each da) in the reportmg month. Compute to the nearest whole megan att.

I I

i P3/77) i k

w y.

,,,,-.c

,.n, n-.

T r.

F.M UNITSliUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNI T NAME FLCRP-3 DATE 8/3/82 REPORT MONTil 7/82 COMPLETED IsY M.W. Culver TELEPHONE (404) 745-6486 "i-Licensee

@r, h7,

}?

3 f $k Cause & Corrective L-Dite

~?

4

.5 s 5 ihent 7?

E~$

Action to

5 E 5

~ 5. ;-

Report cE C

$U Present Recurrence e

e v

6 82-14 820701 F

A N/A N/A HH MECFUN Continued from last month.

Power reduced to 70% to 80% due to the loss of condensate pump IB.

82-16 820701 F

7.28 D

1 82-44 SF HANGER Continued from last month. Discovered 82-044/01T that conduits carrying some HPI controls were not seismically quali-fled.

Declared HPI inoperable, entered I hour action statement, manually shut down reactor. EHC system problems delayed startup.

82-17 820705 F

28.17 H

3 N/A EA CKTBRK Lightning strike on the output break-ers.

82-18 820707 S

B N/A N/A HF HTEXCH Reduced power to cican waterbox B.

82-19 820709 F

22.98 A

1 N/A HA INSTRU Removed plant from the line to repair the turbine control (EHC) system.

I 2

3 4

F: Forced Reason:

Method:

Exlubit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual

, for Piepar.ition of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Esent Report (i.ER) File tNURI'G-D Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License Exammation F-Administrative 5

G-Operational Error (Explain)

Exhibit 1 - Same Source N/77)

I! Other (Explain)

'e

p.

p Page 2 DOCKET NO.

50-302 UNil SlitilDOWNS AND POWER REDUCTIONS uni r N AM E FTFRP 1 DATE 8/3/82 COMPLETED HY M-U rn i w r REPORT MONTil 7/82 TEI.EPilONE (904) 795-6486 i

[?

3 E

t icensee

[%

Cause & Corrective 2

N. i.

Date i

3g j

.g g y Event sg o8 Action to Report u efiv

[U preseni Recurrence i

$E E

5 5 :y H

v C

i

~

82-20 820715 F

25.87 A

3 N/A CB INSTRU RCS flow transmitter failed resulting in a reactor trip.

82-21 820727 S

B N/A N/A Hil MECFUN Reduced power to perform maintenance on condensate pump 1A.

l 82-22 820729 F

A N/A N/A HC HTEXCH Reduced power to locate a saltwater leak in 'A' waterbox.

?

I l

I 2

3 4

f: Forced Reason:

Method:

Exhibit G - Instructions S. Stheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B.Mainti..ance of Test 2 Manual Scram.

Entr> Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 016I)

E-Operator Training & License Examination F-Administrative 5

G Operational Error (Explain)

Exhibis 1 - Same Source t')/77 )

Il-Other (Explain) 0

MONTIILY OPERATIONAL SIRS!ARY STATEMENT

._.k' DOCKER NO. 50-302 UNIT FLCRP-3 DATE 8/3/82 COMPLETED BY M.W. Culver TELEP110NE (904) 795-6486 MONTil > Tuly 1982

SUMMARY

STATCIENT:

The month began with an outage carried over from the previous month. The unit experienced 3 additional trips and 4 significant power reductions during the course of the month.

d