O OPERATING DATA REPORT DOCKET NO.
50-302 1
DATE 8/2/82 CONIPLETED ElY D. Bonart TELEPilONE (904) 795-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit #3 N"I'*
- 2. Reporting Period:
7/1/82 - 7/31/82
?
- 3. Licensed Thennal Power (Mht):
2544
)
- 4. Nameplate Itating (Gross SIWE):
890
- 5. DeGgn Electrical Rating (Net 31We):
825
+
845
- 6. Stasimum Dependable Capacity (Gross SlWe):
806
- 7. Stasimum Dependable Capacity (Net SlWe):
- 8. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Gise Reasons:
N/A
- 9. Power Lesel To which Restricted,if Any (Net MWe):
2475 MW thermal.
- 10. Reasons For Restrictions,if Any:
Pump Power Monitors.
Tius 31onth Yr..t o.Da t e Cumulative
- 11. Ilours in Reporting Period 744 5088 47208
- 12. Number Of Ilours Reactor Was Critical 697.6 4077.I 29526.49
- 13. Reactor Reserve Shutdown llours 51.2 71.1 1280.3
- 14. Ilours Generator On-Line 659.7 3999.3 28811.48
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 14455227 8994227 64361168
- 17. Grow Electrical Energy Generated (31Wil) 489164 3052238 21851829
- 18. Net Electrical Energy Generated (MWil) 464307 2902151 20731449
- 19. Unit Senice Factor 88.67%
78.60%
61.03%
- 20. Unit Asailability Factor 88.67%
78.60%
61.03%
l
- 21. Unit Capacity Factor (Using MDC Net) 77.43%
70.77%
55.97%
- 22. Unit Capacity Factor (Using DER Net) 75.65%
69.14%
53,23%
- 23. Unit Forced Outage Rate 11.3%
21.4%
25.9%
- 24. Shutdowns Scheduled Oser Nest 6 Sionths(Type. Date,and Duration of Facht:
t None
- 25. If Shut Down At End Of Report Perim. Estimated Date of Startup:
- 26. Units in Test Status l Prior to Commercial Operation):
Forecast Achiemi 1/14/77 INill A L CRi flCAlll Y l
INill AI. I:LEC T RICIT Y 1/30/77 I
CO\\lMI.RCl \\L OPI:R A flON 3/13/77 8208160093 820809 PDR ADOCK 05000302 R
4 j
AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.
Sn in?
UNIT FLCRP-3 DATE 8/2/82 r
~
CO\\1PLETED llY -. D. Bocart TELEPilONE. (904) 795-6486 Sf0NTil July 1982 1
DAY
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL D1We-Net)
(.\\lWe-Neo i
g 356 37 721 529 799 2
gg 570 759 3
,9 4
588 20 812 5
387 812
^
21 36 756 6
7 23 749 l
624 8
24 791 9
10 773 25 654 10 777 11 739 27 733 12 745 700 l
28 732 13 29 712 14 30 788 15 371 765 3,
259 l
16 L
l l
l l
l i
INSTRUCTIONS On this format, list the aserage daily unit power lesel in NtWe-Net for each da) in the reportmg month. Compute to the nearest whole megan att.
I I
i P3/77) i k
w y.
,,,,-.c
,.n, n-.
T r.
F.M UNITSliUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 UNI T NAME FLCRP-3 DATE 8/3/82 REPORT MONTil 7/82 COMPLETED IsY M.W. Culver TELEPHONE (404) 745-6486 "i-Licensee
@r, h7,
}?
3 f $k Cause & Corrective L-Dite
~?
4
.5 s 5 ihent 7?
E~$
Action to
- 5 E 5
~ 5. ;-
Report cE C
$U Present Recurrence e
e v
6 82-14 820701 F
A N/A N/A HH MECFUN Continued from last month.
Power reduced to 70% to 80% due to the loss of condensate pump IB.
82-16 820701 F
7.28 D
1 82-44 SF HANGER Continued from last month. Discovered 82-044/01T that conduits carrying some HPI controls were not seismically quali-fled.
Declared HPI inoperable, entered I hour action statement, manually shut down reactor. EHC system problems delayed startup.
82-17 820705 F
28.17 H
3 N/A EA CKTBRK Lightning strike on the output break-ers.
82-18 820707 S
B N/A N/A HF HTEXCH Reduced power to cican waterbox B.
82-19 820709 F
22.98 A
1 N/A HA INSTRU Removed plant from the line to repair the turbine control (EHC) system.
I 2
3 4
F: Forced Reason:
Method:
Exlubit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual
, for Piepar.ition of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Esent Report (i.ER) File tNURI'G-D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Exammation F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source N/77)
I! Other (Explain)
'e
p.
p Page 2 DOCKET NO.
50-302 UNil SlitilDOWNS AND POWER REDUCTIONS uni r N AM E FTFRP 1 DATE 8/3/82 COMPLETED HY M-U rn i w r REPORT MONTil 7/82 TEI.EPilONE (904) 795-6486 i
[?
3 E
t icensee
[%
Cause & Corrective 2
N. i.
Date i
3g j
.g g y Event sg o8 Action to Report u efiv
[U preseni Recurrence i
$E E
5 5 :y H
v C
i
~
82-20 820715 F
25.87 A
3 N/A CB INSTRU RCS flow transmitter failed resulting in a reactor trip.
82-21 820727 S
B N/A N/A Hil MECFUN Reduced power to perform maintenance on condensate pump 1A.
l 82-22 820729 F
A N/A N/A HC HTEXCH Reduced power to locate a saltwater leak in 'A' waterbox.
?
I l
I 2
3 4
f: Forced Reason:
Method:
Exhibit G - Instructions S. Stheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B.Mainti..ance of Test 2 Manual Scram.
Entr> Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 016I)
E-Operator Training & License Examination F-Administrative 5
G Operational Error (Explain)
Exhibis 1 - Same Source t')/77 )
Il-Other (Explain) 0
MONTIILY OPERATIONAL SIRS!ARY STATEMENT
._.k' DOCKER NO. 50-302 UNIT FLCRP-3 DATE 8/3/82 COMPLETED BY M.W. Culver TELEP110NE (904) 795-6486 MONTil > Tuly 1982
SUMMARY
STATCIENT:
The month began with an outage carried over from the previous month. The unit experienced 3 additional trips and 4 significant power reductions during the course of the month.