m

2Hb

,

,.

.

July 28, 1982

Docket No. 50-346

Toledo Edison Company

AITN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This' refers to the special followup inspection conducted by

'

Mr. J. P. Patterson of this office on July 13, 1982, of the prompt public

notification / warning system and Confirmation of Action Letter dated April 20,

1982, for the Davis-Besse Nuclear Station, Unit 1, and to the discussion of

our findings with Mr. T. Myers, Nuclear Licensing Manager and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

'

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

_

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8

0

.l

(

u.f

,'

.

Toledo Edison Company

2

July 28, 1982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or'part sought to be withheld, arI which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear f rom you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

c

-

C .

a,iello, Chief -

C. J. Paper

Emergency Preparedness and

Program Support Branch

Enclosure:

Inspection Report

No. 50-346/82-19(DEPOS)

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Health

A

RIII

RIII

RII

RIII /

p'

}l39O

Pafterson/sv

$

%

I

R e.

'

A

son

P

ello

"7/27/82