O.i j;.
.t-APPENDIX A
- t NOTICE OF VIOLATION GPU Nuclear Corporation Docket No 50-219 Oyster Creek Nuclear Generating Station License No.
DPR-16 During_the NRC inspection conducted September 23, 1990, through October 20, 1990, two violations of NRC requirements were-identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
'10 CFR Part 2, Appendix C,-(1990), the violations are listed below:
A..
Technical Specification 6.8.1 requires that written procedures be established; implemented and maintained that meet or exceed the require-ments of NRC Regulatory Guide 1.33.
q Regulatory Guide 1.33, Revision 2, specifies that equipment control activities be covered by written procedures and endorses ANSI N18.7-1976, Section 5.2.2, which requires that procedures be followed.
Station Procedure 108, " Equipment Control", Revision 48, specifies the required rev_tew and documentation for the installation of_ temporary piping when:it is not shown on approved system drawings.
Contrary to the above,. procedures were not followed in that an air hose
. routed from the. reactor building 23 ft elevation to the 119 ft elevation and a: hose and valves in a reactor building penetration were installed without the required review and documentation until September 27, 1990, when the installations were reviewed and documented.
This equipment was not shown on approved system drawings.
This'is.a severity level IV violation (Supplement I).
78.
Technical Specification 6ill requires that procedures _for-personnel radiation protec_ tion shall be adhered to for all ope' rations involving personnel radiation exposure, Procedure 9300-ADM-4000.11,~ revision 0, Rules for Conduct of-Radiological Work, Section 7.2, requires.that all personnel who enter the Radiological Controls: Area:shall obey the posted,-oral, and written radiological
- controls instructions, procedures and Radiatian Work Permits.
Contrary to the above, on October 16, 1990, procedures for personnel radiation protection were not adhered to in that a_ worker entered an area posted as a High. Radiation Area without the.high range self reading dosimeter and the dose rate meter or alarming dosimeter required by Radiation Work Permit No.90-990 for high radiation areas, i:
-This violation is severity level V (Supplement IV).
9012040028 90112.1 PDR ADOCK 05000219 o
~_
l b:,. ". :sq i
- 2n
+,
s
- 6 Pursuant to the provisions of 10 CTK 2.201, GPU Nuclear Corporatio1.is-hereby crequired to _ submi' a written-statement lir explanation to this office within 30-
-days of tthe date of the letter-tra: 3mitting this Notice of Violation.
Thi s :;
' reply snould be clearly marked as a " Reply to a Notice of-Violation" and -
~
.should. include _ for each violation:
(1) admission or denial of the" violation,-
.(2)Lthe reasons for the' violation, if admitted,-(3) the corrective steps lthat have-been-taken and the results achieved, (4) the corrective steps thatLwi.11 be taken to avoid further violations, and (5) the date when full compliance will-be achieved._ Where. good cause is shown, consideration will be:given to extending this. response time.
+: