ML20062G728

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-387/73-02 & 50-388/73-02 on 731119.No Noncompliance Noted
ML20062G728
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/28/1973
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gavin A
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138A483 List:
References
NUDOCS 7902010140
Download: ML20062G728 (2)


See also: IR 05000387/1973002

Text

hkbb[kb;

-

UNITED STATES

,

-

i,, o ,,

ATOTWC ENERGY COMi.11SSION

v,

. , O

G

DIRECTOR ATE OF REGULATORY OPER ATBOM'S

.]

p'

f.

a r c'o" '

,

631 PARK AVENUE

5,

[

KING oF PRUSSI A, PENNSYLVANI A 19406

NOV 2 81973

-

.

I

Pennsylvania Power and Light Company

Docket Nos. 50-387

Attention:

Mr. Austin Gavin

50-388

Executive Vice President

i

901 Hamilton Street

l

Allentown, Pennsylvania 18101

.

..

Gentlemen:

This refers to the inspection conducted by Mr. Streeter of titis office

'

on November 19, 1973, relating to obtaining and evaluating scheduling

information relative to the status of Susquehanna Units 1 and 2.

,

The area examined during this inspection ,is described in the Regulatory

'

Operations Inspection Report enclosed with this letter. Within this

crea, the inspection consisted of a meeting attended by Messrs. Urbaniak,

Lombardi, Bielecki, and Tommor of your staff and Mr. Streeter.

Within the scope of this inspection, no violations or safety ite=s

were observed.

.

In accordance with Section 2.790 of the AEC's " Rules of Practice", Part

2, Title 10,, Code of Federal Regulations, a copy of this letter and the

.

enclosed inspection report will be placed in the AEC's Public Docu=ent

Room.

If this report contains any information that you (or your

contractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such infor-

mation from public disclosure. Any such application =ust include a full

statement of the reasons on the basis of which it is claimed that the

~

information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

-

i

e

1

.

l

i

.

l

r

!

.

i

l

790301oi4o -

4,

1

.

y

.

'

'

-2-

1

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

/& I/,bbAs-

~

.

Robert T. Carlson, Chief

-

Facility Construction and

.

.

Engineering Support Branch

,

Enclosure:

RO Inspection Report Nos. 50-387/73-02 and

50-388/73-02

-

.

-

- - - - - - -

, . . . . . .

_ _ . . . . . . _

_ . _

bec:

(w/encis)

R0 Chief, FS&EB

g

RO:HQ (5)

(4 w/encls plus 9 cys of Report Only)

3

DT

~

w

U Central Files %

RS (3)

,

PDR

Local PDR

-

RO Files

NSIC

DTIE

State of Pennsylvania

,

- - - - - - -

-

. . . . . - . _ _ . _

. . _ _ _ _ . . _ _ . , , . . _ ,

,,

,

,

,

.

l

b

.

.

l

i