ML20062G728
| ML20062G728 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/28/1973 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gavin A PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17138A483 | List: |
| References | |
| NUDOCS 7902010140 | |
| Download: ML20062G728 (2) | |
See also: IR 05000387/1973002
Text
hkbb[kb;
-
UNITED STATES
,
-
i,, o ,,
ATOTWC ENERGY COMi.11SSION
v,
. , O
G
DIRECTOR ATE OF REGULATORY OPER ATBOM'S
.]
p'
f.
a r c'o" '
,
631 PARK AVENUE
5,
[
KING oF PRUSSI A, PENNSYLVANI A 19406
NOV 2 81973
-
.
I
Pennsylvania Power and Light Company
Docket Nos. 50-387
Attention:
Mr. Austin Gavin
50-388
Executive Vice President
i
901 Hamilton Street
l
Allentown, Pennsylvania 18101
.
..
Gentlemen:
This refers to the inspection conducted by Mr. Streeter of titis office
'
on November 19, 1973, relating to obtaining and evaluating scheduling
information relative to the status of Susquehanna Units 1 and 2.
,
The area examined during this inspection ,is described in the Regulatory
'
Operations Inspection Report enclosed with this letter. Within this
crea, the inspection consisted of a meeting attended by Messrs. Urbaniak,
Lombardi, Bielecki, and Tommor of your staff and Mr. Streeter.
Within the scope of this inspection, no violations or safety ite=s
were observed.
.
In accordance with Section 2.790 of the AEC's " Rules of Practice", Part
2, Title 10,, Code of Federal Regulations, a copy of this letter and the
.
enclosed inspection report will be placed in the AEC's Public Docu=ent
Room.
If this report contains any information that you (or your
contractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application =ust include a full
statement of the reasons on the basis of which it is claimed that the
~
information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
-
i
e
1
.
l
i
.
l
r
!
.
i
l
790301oi4o -
4,
1
.
y
.
'
'
-2-
1
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
/& I/,bbAs-
~
.
Robert T. Carlson, Chief
-
Facility Construction and
.
.
Engineering Support Branch
,
Enclosure:
RO Inspection Report Nos. 50-387/73-02 and
50-388/73-02
-
.
-
- - - - - - -
, . . . . . .
_ _ . . . . . . _
_ . _
bec:
(w/encis)
R0 Chief, FS&EB
g
RO:HQ (5)
(4 w/encls plus 9 cys of Report Only)
3
DT
~
w
U Central Files %
RS (3)
,
Local PDR
-
RO Files
DTIE
State of Pennsylvania
,
- - - - - - -
-
. . . . . - . _ _ . _
. . _ _ _ _ . . _ _ . , , . . _ ,
,,
,
,
,
.
l
b
.
.
l
i