Forwards IE Inspec Repts 50-317/78-30 & 50-318/78-27 on 781023-26 During Which No Items of Noncompliance Were Noted
ML20062G485
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/13/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20062G488 List:
References
NUDOCS 7812290028
Download: ML20062G485 (2)


See also: IR 05000317/1978030

Text

. _ _.

e *

a

. f0l%

.as M% UNITED STATES

y ,- 7 *, NUCLEAR REGULATORY COMMisslON

o REGION I

5 -[

0,

J

4

f $35 PARK AVENUE

KING OF PRUS$1A, PENNSYLVANIA 19406

    • ~

,,,,,

Docket Nos. 50-317

50-318 13 NOV 1978

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject: Combined Inspection 50-317/78-30 and 50-318/78-27

(

This refers to the inspection conducted by Mr. D. Johnson of this office

on October 23-26, 1978, at Calvert Cliffs Nuclear Power Plant, Units 1

and 2, Lusby, Maryland, of activities authorized by NRC License Nos.

DPR-53 and DPR-69, and to the discussions of our findings held by Mr.

Johnson with Mr. L. Russell of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The infomation sought to be withheld shall be incorporated as

7812290018

G

. - .- __ -

_-

- . .

. .

-

.

!

Baltimore Gas and Electric Company 2 13 NOV 1978

far as possible into a separate part of the affidavit. If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

'

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

P.G W ,b.,Ae% b

Eldon J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-317/78-30 and 50-318/78-27

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

L. R. Russell, Chief Engineer

W. Gibson, Supervisor Operational QA

l