ML20062G140

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Repts 50-341/78-16 on 780927-28 & 1011- 13 & Notice of Violation
ML20062G140
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/09/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML20062G142 List:
References
NUDOCS 7812270034
Download: ML20062G140 (2)


See also: IR 05000341/1978016

Text

'

, T-

,

.

.

.

%p '"" % ,

t

UNITED STATES

4

NUCLEAR REGULATORY COMMISSION

.[

f 'l i S*-

-

1 o

R E GloN ill

f

799 RooSEN ELT RoAo

e

-'*

8

-

oLEN ELLYN, ILLINOIS 60137

'

,

,

,

.....

.

}iOV

01973

-

_

'

Docket No. 50-341

.

.

Detroit Edison Company

,

ATTN:

Mr. Edward Hines, Assistant

.

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers co the inspection conducted by Mr. E. W. K. Lee of this

office on September 27 - 28 and October 11 - 13, 1978, of activities

by NRC Construction Permit No. CPPR-87 and to the discussion of our

findings with you, Mr. T. A. Alessi and others of the Fermi 2

project staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

With respect to Appendix A, it is a recurrent item. In your response

please give this matter your particular attention.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office within thirty days of your receipt

of this notice a written statement or explanation in reply,

including for each itam of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

781227CO M

Q

-

.

.-

-


-,

-,-,7

--

---

-

,

--g-

%y-.-,

, - , -

l

.

a

Detroit Edison company

-2-

N T/

01973

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

except as follows. If the enclosures contain information

that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure. The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so : hat proprietary

information identified in the application is centained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

_#

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Rpt No.

50-341/78-16

cc w/encls:

Central Files

Reprodaction Unit MRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

-

Eugene B. Thomas, Jr.

Attorney

t