.. _ . . . _ _ _ ._ _ . _ . _ ___._ -__ _ _ _ _. - _ . _ _ _ _ . _ _ _ _ . _ _ . _ . - _

I i

i I VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT I

MONTH June YEAR 1982 i

l i

APPROVED:

1 l

/

h STATIONMANA%R 1

8208120150 820715 PDR ADOCK 05000338 R PDR

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 1
2. Reporting Period: June 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 4,343 35,664
12. Number of Hours Reactor Was Critical 0 3,129.9 26,958.2
13. Reactor Reserve Shutdown Hours 0 21.5 256.4
14. Hours Generator On-Line 0 3,022.9 26,375.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 7,941,328 68,255,580
17. Gross Electrical Energy Generated (MWH) 0 2,537,888 21,783,410
18. Net Electrical Energy Generated (MWH) 0 2,396,973 20,519,889
19. Unit Service Factor 0 69.6 74.0
20. Unit Availability Factor 0 69.6 74.0
21. Unit Capacity Factor (Using MDC Net) 0 63.8 66.5
22. Unit Capacity Factor (Using DER Net) 0 60.9 63.4
23. Unit Forced Outage Rate 0 7.3 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Fall Maintenance Outage 11-05-82 thru 11-15-82

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 08-03-82
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338

UNIT NAME North Anna 1 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Scheitendorf TELEPHONE (703) 894-5151 X2502 Type Duration Reason 2 l

No. Date Method of Licensee System Component Cause & Corrective (Hours) Shutting **" Code Action to Down Reactor3 Report # *4 5 Prevent Recurrence 82-10 720 The scheduled refueling outage continues l

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161) l E-Operator Training & License Examination 5-Load Reduction l F-Administrative 9-Other G-Operational Error (Explain) 5 l

H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTl! June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 _

5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 l

16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l

OPERATING DATA REPORT DOCKET NO. 50-339 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 2
2. Reporting Period: June 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 4,343 13,535
12. Number of Hours Reactor Was Critical 491.4 1,973.1 9,387.9
13. Reactor Reserve Shutdown Hours 8.5 54.9 1,688.1
14. Hours Generator On-Line 468.2 1,905.3 9,364.7
15. Unit Reserve Shutdown Hours 0 0 0 j 16. Gross Thermal Energy Generated (MWH) 960,712 4,687,916___ 23,470,757
17. Gross Electrical Energy Generated (MWH) 315,535 1,549,226 7,864,458
18. Net Electrical Energy Generated (MWH) 294,637 1,466,297 7,468,713
19. Unit Service Factor 65.0 43.9 69.2 l
20. Unit Availability Factor 65.0 43.9 69.2 1
21. Unit Capacity Factor (Using MDC Net) 46.0 37.9 62.0
22. Unit Capacity Factor (Using DER Net) 45.1 37.2 60.8 l 23. Unit Forced Outage Rate 1.8 5.9 15.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l Fall Maintenance Outage 10-15-82 thru 10-25-82 l

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report # Prevent Recurrence 82-09 820611 S 243.3 C 4 NA NA NA Continuation of Refueling outage.

82-10 820611 F 4.7 B 1 NA NA NA Normal rampdown to generator off line to pe,rform turbine Overspeed test.

82-11 820616 F 3.8 B 1 NA NA NA Normal rampdown to generator off line to balance the turbine.

i i

i 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 420.0 2 0 18 657.3 3 0 19 736.1 4 0 20 833.1 5 0 21 849.4 6 0 22 862.0 7 0 23 820.8 8 0 24 839.0 9 0 25 856.5 10 0 26 851.9 11 82.8 27 862.7 12 201.7 28 862.7 13 213.8 29 871.4 14 209.8 30 874.3 15 206.7 31 0 16 165.1 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.