MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
- _______ _ _ _ _ _ _ _ _ _ _ _ _
Il 9
APFENDIX B AVERAGE LPJLY POWER LEVEL DOCKET NO. 059-03i5 UNIT BRUNSWICK UNIT 1 DATE G8/03/82 COMPLETED DY FRANCES HARRISCN TELEPHONE 919-407-9521 l JULY 82 l
l DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY c'0WER LEVEL l (MWE-NET) (MWE-Nd-)
1 606. 17 -12.
2 596. 18 -8. f 3 593. 19 -8.
1 l
4 591. 20 -8.
5 589. 21 -8. -
l l 6 587. 22 -10.
7 582. 23 -9.
8 580. 24 -8.
9 576. 25 -8.
10 335. 26 -9.
11 70. 27 -10, 12 495. 28 -9.
13 600. 29 -10.
14 571. 30 -10.
15 479. 31 -10.
16 433.
1.16 - 8 8208120016 820804 PDR ADOCK 05000324 R PDR d
- . - - - . - . . - - . - - - ~ . - - - - - - - . . -. .- .- - ..
i l - .
l
.i OPERATING DATA REPORT I DOCKET NO. 050-0325 DATE 08/03/82 COMPLETED BY FRANCES HARRISON i TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
- 2. REPORTING PERIOD: JULY 82 I I '
! 3. LICENSED THERMAL POWER (MWT): 2436 I I
. 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
! 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I l 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE)
- 790.0 ------------------------------- '
l 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
{ GIVE REASONS:
l
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
I THIS YR TO CUMUL MONTH DATE ATIVE ,
1
- 11. HOURS IN REPORTING PERIOD 744.0 5087.0 47088.0 !
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 366.7 4352.0 32617.3 '
( 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
! 14. HOURS GENERATOR ON LINE 358.2 4224.5 30764.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
! 16. GROSS THERMAL ENERGY GENERATED (MWH) 654785.0 7541286.9 61959091.5 l
l '/ . GROSS ELECTRICAL ENERGY GENERATED (MWH) 207507.0 2425439.0 20426647.0
- 18. NET ELECTRICIAL ENERGY GENERATED (11WH) 195573.0 2333300.0 19636791.0
- 19. UNIT SERVICE FACTOR 48.1 83.0 65.3
- 20. UNIT AVAILABILITY FACTOR 48.1 83.0 65.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 33.3 58.1 52.8 l 22. UNIT CAPACITY FACTOR (USING DER NET) 32.0 55.9 50.8 l 23. UNIT FORCED OUTAGE RATE 51.9 14.4 21.0
! 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHb (TYPE, DATE, AND DURATION OF EACH):
i l
25: IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 8/ 5/82
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
l COMMERICIAL OPERATION -------- --------
l 1.16 - 9
APPENDIX Docket No: 050-325 Unit: Brunswick No. 1 Date: August 1982 Completed by: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1 operated at 48.1 percent availability factor for the month of July with a 33.3 percent capacity factor. There were two off-line outages this month. They are detailed in Appendix D, the unit shutdowns and power reduction log. The unit operated at reduced power because of core coastdown.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick No. I fuel pool.
Investigation on Outage Report #82-074 completed. It is included in this months report.
h O UNil'SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0M _
4'""*"l
DATE ^"""S' 1"2 July 1982 COMPLETED BY Frances Harrison REPORT MON 111 TELEPilONE t919 N3/-9321
-, $g 3 $ Licensee ,E *r, . Cause & Corrective f No. Date e- E :) R EEy Event =? c-3 Action to S jh 5 3d~ Report : N0 $0 Prevent Recurrence L
< > u d .
I 82-074 820607 F 37.1 A 3 NA HB VALVEX RX SCRAM - Blown fuse to MSIV -
Wire on position indication for MSIV was found grounded. Wire was lifted.
Problem will be repaire*d during the, fall 1982. Refueling Outage as TT #1-E-82-2014. E
. s i
I 2 3 4 -
F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-l'quipment I ailure (Explain) 1. Manual for Preparation of Data ll M tintenance of Test 2-Manual Scram. Entry Sheets for Licenser -
C-Refochng 3-Automatic Scram. Event Report (LER) Fde(NUREC.
D Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination 5-Load Reductions F Adnsnistrative 6-Other 5 G-Operational Error (Explain) Exhibit 1. Same Source -
P7/77) Il Other (Explain)
F -
h O i
UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-012s UNIT N. ole ii.ruaswic k 1
[
DATE Aucust 1982 l irances narrison
' COMPLETED IlY REPORT MONT11 July 1982 TELEPIIONE (919) 457-9521
. 3 i<
L
.. E c
, .$ E 3 4 5 ~; Licensee ,E v, .
g*3 Cause & Corrective No. Date g g 3 .3 s U Event gi gO Action to ,
F-f5 5 ~5 Report # in u uo Prevent Recurrence r
.a :
d . .
= 6 82-089 July 10, 198. F 24.2 A 3 NA liA TURBINE Turbine trip as a result of deiective tracking rectifier.
Defective rectifier was taken out of service. Presently EllC is being fed .
by alternate until rectifier can be repaired. J.-
i .
1 I 2 3 4 F: Forced Reston: Method: Exhibit G. Instructions ,
S: Scheduled A l'quipment Failure (Explain) 1-Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) Fde (NUREC.
D Regulatory Restriction 4 Continuations 0161)
. E Operator Training & License Examination 5-Load Reductions -
F-Administrative 6-Other I G-Operational Error (Explain) Exhibit I .Same Source '
(9/77) 11-O:her (Explain)
F #
p p y 1
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAM E
(
Aucust 1982 f,J DATE "" * " "
July 1982 COMPLETED BY REPORT MONTil TELEPilONE N*>'-9'"
b t n.
- :, .$ ? 'h h.5; Licensee 5-r, o Cause & Corrective No. Date g 3 ij @ jyJ Event y mo Q Action to Prevent Recurrence i
F f5 $ j5- Report # g d . .
NA RC ZZZZZZ END OF CYCLE COASTDOWN.
82-90' 820711 S 94.6 F 5
- ALL RODS OUT AND 100% CORE FLOW.
i i . y
- l 1
3 4 I 2 R:a n- Method: Exhibit C Instructions -!
F: ForecJ for Preparation of Data S: Scheduled A l'.pn;iment Failure (Explain) 1 Manual 2-Manual Seram. Entry Sheets for Licensee Il Maintenance or Test Event Report (LER) Fde (NUREG.
C. Refueling 3 Automatic Scram.
D Regulatory Restriction 4 Continuations 0161) 5-Load Reductions E-Operator Training & Ucense Examination 5
6-Other F-Adninistrative Exhibit I Same Source G-Operational Errur (Explain)
- li Other (Explain) 19/77) i
DOCKET NO. 050-0325 UNIT SliUTDOWNS AND POWER REDUCTIONS Brunswick I UNIT N AME l DATE Aucust 1982 COMPLETED BY Fr'ncoe 9,vrison REPORT MONT1f July 1982 (919) 457-9521 TELEPllONE q .
.$ g 3 5 Licensee E r, h, Cause & Corrective ,
No. Date g 3g 4 :; y U Event gy g3O Action to H
$E $ 35 x
Report # in u uo Prevent Recurrence ,
z C .
82 92 July 16,1982 F in B 1 NA XX ZZZZZZ Local Leak Rate Testing
. progress)
(LLRT outage in progress) t t
II i
~
I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A l'quipment Failure (Explain) 1-Manual for Pseparation of Data II. Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3. Automatic Scram. Event Report (LER) File (NUREC.
D. Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination 5-Load Reductions F Adnunistrative f.Other 5 ,
G-Operational Error (Explain) Exhibit I- Same Source 19/77) Il Other (Explain)
O .
1 1
APPENDIX B AVERACE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 08/03/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JULY 82 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -7. 17 -10.
2 -8. 18 -10.
3 -10. 19 -10.
4 -10. 20 -10.
- 5 -13. 21 -10.
6 -13. 22 -10.
7 -12. 23 -9.
8 -11. 24 -7.
9 -13. 25 -8.
10 -10, 26 -8.
11 -9. 27 -9.
12 -9. 28 -10.
13 -9. 29 -9.
14 -10. 30 -9.
15 -9. 31 -9.
16 -8.
1.16 - 8
OPERATING DATA REPORT l i DOCKET NO. 050-0324 DATE 08/03/82 COMPLETED BY FRANCES HARRISON
! TELEPHONE 919-457-9521 OPERATING STATUS
, 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: JULY 82 I I
- 3. LICENSED THERMAL POWER (MWT): 2436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE l 11. HOURS IN REPORTING PERIOD 744.0 5087.0 59112.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2465.2 37632.1 '
l 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 0.0 2384.6 35153.9 i 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
! 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 4467965.8 64465503.4 l 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 1415289.0 21409226.0 l 18. NET ELECTRICIAL ENERGY GENERATED (MWH) -7095.0 1344813.0 20534226.0
! 19. UNIT SERVICE FACTOR 0.0 46.9 59.5
- 20. UNIT AVAILABILITY FACTOR 0.0 46.9 59.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) -1.2 33.5 44.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) -1.2 32.2 42.3
- 23. UNIT FORCED OUTAGE RATE 0.0 17.1 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):
l l 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 8/ 5/82 l 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
! INITIAL ELECTRICITY -------- --------
COMMERICIAL OPERATION -------- --------
1.16 - 9
APPENDIX Docket No: 050-324 Unit: Brunswick No. 2 Date: August 1982 Completed by: Frances Harrison OPERATIONS SUMARY BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 was shut down the entire month of July for a refueling outage. Estimated startup date is August 5, 1982.
There are 824 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
g n n v
. DOCKETNO. 050-0325
- UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 11 DATE Anonst Jos, COMPLETED ilY rr,- ",rrienn REPORT MONT11 Julv 1982 ,E (o m m o W
,I l
.. E c
-, 3? 3 455 Licensec Eg je. Cause & Corrective No. Date & 5g i .s y J Event p v) U g"g Action to ,l H y, E 5 5g.
e Report #
o o Prevent Recurrence ,
3, C
I.82-054 Aug. 4, 1982 s 744 C 4 NA RC FUELXX Refueling outage i
V i .
I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions A l'quipment Failure (Explain) 1 Manual for Preparation of Data S: Scheduled ll Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refuchng 3 Automatic Scram. Event Report (LER) Fde (NUREG.
D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & Ucense Examination 5-Load Reductions F. Administrative 5 6-Other Exhibit 1.Same Sourec G-Operational Error (Explain) *
(9/77) Il Other (Explain) .
p