Forwards IE Inspec Rept 50-518/78-13, 50-519/78-13, 50-520/ 78-13, 50-521/78-13 on 781010-11 During Which No Items of Noncompliance Were Noted
ML20062E497
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 11/02/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20062E498 List:
References
NUDOCS 7812080046
Download: ML20062E497 (2)


See also: IR 05000518/1978013

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

..

7

'

'

J &

.

'

pm REGg UNITED STATES ,/g /yj s &:

'.

p)"y

/~n/*

f 'o NUCLEAR REGULATORY COMMISSION .N #

'

[ ,4 g REGloN 11 Q/

{, g 101 MAR ETTA STREET.N.W.

o

f ATLANTA. GEORGI A 30303

~(C 6

g, -

.....

M/

'

In Reply Refer To:

RII:TEB

50-518/78-13, 50-519/78-13

50-520/78-13, 50-521/78-13

.

Tennessee Valley Authority

ATTN: Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

( Gentlemen:

This refers to the inspection conducted by T. E. Burdette of this

office on October 10-11, 1978, of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153

for the Hartsville Nuclear Plants A and B, and to the discussion of

our findings held with R. T. Hathcote at the conclusion of th'e-

inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the;_in- '

spection consisted of selective examinations of procedures and .,

representative records, interviews with personnel, and observations

by the inspectors. .

Within the scope of this inspection, no items of noncompliance were

'

disclosed.

-

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withholc

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

?S2.30sooY(o

.

O

___ ___._.______ _ _ _ _ _ _ _ _ - _ _ _ _

. .

-C = p.

.

.

Tennessee Valley Authority -2- NOV 0 21978

so that proprietary information identified in the application is

contained.in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be

glad to discuss them with you.

Sincerely,

-

t /

_ Charles E. Murp y, Shief

I' Reactor Construction and Engineering

Support Branch

Enclosures:

Inspection Report Nos. 50-518/78-13,

50-519/78-13, 50-520/78-13, 50-521/78-13

cc w/ encl:

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. R. T. Hathcote, Project Manager

Hartsville Nuclear Plant

P. O. Box 2000

Hartsville, Tennessee 37074

,

Mr. J. F. Cox

400 Commerce Street

W90214

Knoxville, Tennessee 37902

-