Forwards IE Inspec Repts 50-329/78-13 & 50-330/78-13 on 780724-28,31,0801-31,0901-08 & Notice of Violation
ML20062E285
Person / Time
Site: Midland
Issue date: 11/03/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20062E289 List:
References
NUDOCS 7812060064
Download: ML20062E285 (2)


See also: IR 05000329/1978013

Text

_ __-________

7'

.

.

PDR~

-

-

p** "'%

UNITEo STATES

,

NUCLEAR REGULATORY COMMISSION

[ {gk.li :

.,

l

j

R EGloN iil

g

g

7eo noosevsLT noAo

,#

oLEN ELLYN. ILUNols 60137

g,

.....

4

sy ,

l

Docket No. 50-329

NOV 31978

Docket No. 50-330

Consumers Power Company

ATTN: Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI

49201

Gentlemen:

This refers to the inspection conducted by Mr. R. J. Cook of this

'l

'

office during the period July 24-28, 31, August 1-31, and September 1-8,

1978, of activities at Midland Nuclear Power Plant Construction site

authorized by NRC Construction Permits No. CPPR-81 and CPPR-82 and

to the discussion of our findings with Mr. Corley and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

"

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appearet.

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

The inspection showed that

action had been taken to correct the identified noncompliance

i

f

and to prevent recurrence. Consequently, no reply to this

noncompliance is required and we have no further questions

regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, Appendix A to the letter and the enclosed

,

inspection report will be placed in the NRC's Public Docr2ient Room,

except as follows. If this report contains information -hat you or

your contr:.ctors believe to be proprietary, you must app-y in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application

must include a full statement of the reasons for which tne 3 , formation

is considered proprietary, and should be prepared so that proprietary

e

information identified in the application is contained in an

enclosure to the application.

7812060b M

.

_ _ _ - _ _ . _ _ _ _ _

.

.

.

.

Consumers Power Company

-2-

NOV 3197g-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

dP

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A. Notice

of Violation

2.

IE Inspection Rpt No.

50-329/78-13 and

50-330/78-13

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Locci PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron M. Cherry, Chicago

.

b

I

i