OPERATING DATA REPORT DOCKET NO. 50-302 DATE 11/1/78 j
COMPLETED BY J. E. Barrett TELEPHONE (ona 70s 6486 i
OPERATING STATUS N*8
~
- 1. Unit Name:
Crvseal River #3
- 2. Rsponing Period:
10/1/78 10/31/78 2452
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
890 825
- 5. Design Electrical Rating (Net MWe):
83
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
. I. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Repon.Give Reasons:
A None
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
+
- 10. Reasons For Restrictions. If Any:
This Month Yr to.Date Cumulative
- 11. Hours In Reponing Period
-n 5 e 7:ne,e 14352.0
- 12. Number Of Hours Reactor Was Critical 745.0 2337.3 A191 n
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 383.'4
- 14. Heurs Generator On.Line 744.8 2180.2 28095.0
{ Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10. Gross Thermal Energy Generated (MWH) 1656897.0 4626978.0 17255069.0
- 17. Gross Electrical Energy Generated (MWH) 567618.6 1576919.6 5845948.6 34%02 0 UN_,'7 E00033 C /#94#N'73344338.G.55S7338
- 18. Nst Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100.0%
29.9%
56.4%
100.0%
29.9%
56.4%
- 20. Unic Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 32.0% 90.994 4E 25 7'/4
!.0. ~~.' 48,4 %
- 22. Unit Capacity Factor (Using DER Net) 0 0. 3 % B 1. 1 '4 2 3. 0% u.9'4 40.0% 4 4,7 %
.0%
69.7%
41.2%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:
Refuelhe-Scheduled 4/23/79. Pimed 6-8 TJeeb
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Oper::tions:
Forecast Achieved 1/10/27 INITIAL CRITICALITY 1/30/77 INITIAL ELECTRICITY COMMERCIAL OPERATION 3/13/77 y* 1138oa]l w 7>