ML20062D056

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-271/82-10 on 820601-04. No Noncompliance Noted
ML20062D056
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/16/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sinclair J
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20062D059 List:
References
NUDOCS 8208050440
Download: ML20062D056 (2)


See also: IR 05000271/1982010

Text

Y,

'h.

.

D*SIGYATED ORIGINAL

1 rtif nd Ey / rin he yh

16 JUL 1982

Docket No. 50-271

.

Yankee Atomic Electric Company

ATTN: Mr. J. B. Sinclair

Licensing Engineer

1671 Worcester Road

Framingham, Massachusetts 01701

Gentlemen:

Subject: Inspection No. 50-271/82-10

This refers to the routine safeguards inspection conducted by G. C. Smith of

this office on June 1 through 4, 1982, at the Vermont Yankee Nuclear Power

Station, Vernon, Vermont, of activities authorized by NRC License No. DPR-28 and

to the discussions of our findings held by G. C. Smith with Mr. W. Murphy of.

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 73.21 of the NRC's regulations, documentation of

security measures for the physical protection of special nuclear materials and

certain plant equipment vital to the safety of production or utilization facilities

is deemed to be Safeguards Information. Each person who produces, receives or

acquires Safeguards Information is required to ensure that it is protected

against unauthorized disclosure. Therefore, except for the report cover sheet,

the enclosed inspectior, report will not be placed in the Public Document Room

and will receive limited distribution pursuant to 10 CFR 73.21(c).

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely,

Or C1 ital Signca By:

bGM83 h bNW

hvThomas T. Martin, Director

U' Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report No. 50-271/82-10

(Contains Safeguards Information) ,

OFFICIAL RECORD COPY

82000SO440 g Q 1

PDR ADOCK PDR

G

}GC]

I

. .

Yankee Atomic Electric Company 2

16 JUL 1982

cc: (with copy of report cover sheet only)

Mr. Warren P. Murphy, Plant Manager

Mr. W. F. Conway, President and Chief Executive Officer

' K. Kniskern, Manager of Security

E. W. Jackson, Manager of Operations

L. H. Heider, Vice President

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Centar (NSIC)

NRC Resident Inspector (with copy of enclosure)

State of Vermont

State of New Hampshire

bec: (with copy of report cover sheet only)

Region I Docket Room (with concurrences)

Chief, Operational Support Section

Director, DPRP

(I:DETP I:DETP RI ETP

5mith/jpf Jo ner M ;in

7/1/82 1 1/W

0 FICIAL RECORD COPY

i

I

l

l

i

!

,