ML20062C737
| ML20062C737 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/10/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 7811130425 | |
| Download: ML20062C737 (1) | |
Text
.-
I p **"C%,
t UNITED STATES fe.
81 NUCLEAR REGULATORY COMMISSION fl Y'
o REGION 111 3
- f 799 ROOSEVELT RoAO
,3 S
k e
GLEN ELLYN,ILLINotS 60137
}
Docket No. 50-341 k.
.g u-The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Thank you for your letter dated October 4,1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 30, 1978. We will examine your corrective action during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
=J R.' F. Heishman, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 7811130 M