ML20062B247
| ML20062B247 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/30/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML20062B250 | List: |
| References | |
| NUDOCS 7810260169 | |
| Download: ML20062B247 (2) | |
See also: IR 05000341/1978011
Text
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
G
n
.-
_a
~
fh1
^-
-
,.
j # * % g'
UNITED STATES
'.
NUCLEAR REGULATORY COMMISSION
- ., g
-
f ,,I % ) , )
R EGloN 111
3 i g ,' -
t
799 mCoSEVELT Ro Ao
-
,
GLEN ELLYN, ILLINot$ 60137
.....
.
.
AUG 3111978'
"
.
Docket No. 50-341
.
Detroit Edison Company
.
ATTN:
Mr. Edward Eines, Assistant
Vice President and Manager
Quality Assurance
2000 Second Avenue
Detroit, MI
48226
.
Gentlemen:
This refers to the inspection conducted by Messrs. C. M. Erb,
E. W. K. Lee, and H. S. Phillips of this office on July 31-August 3,
1978, of activities by NRC Construction Permit No. CPPR-87 and to
the discussion of our findings with Mr. T. A. Allessi and others of
the Fermi 2 project staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas eynmined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be
in noncompliance with NRC requirements, as described in the enciesed
Appendix A.
In
With respect to Appendix A, Ites No. 2 is a recurrent item.
your response please give this =atter your particular attention.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to
this office within thirty days of your receipt of this notice a
written statement or explanation in reply, including for each
,
item of noncompliance: (1) corrective action taken and the
results achieved; (2) corrective action to be taken to avoid
further noncecpliance; and (3) the date when full compliance vill
be achieved.
79/oz@M7 q
-
.
.
~
.
.
Detroit Edison
-2-
AUG 3 01978
Company
.
_i
.*
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter, the enclosures, and your response eo this letter will be
placed in the NRC's Public Document Room, except as follows. If
the enclosures contain information that you or your contractors
believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application
must include a full statement of the reasons for which the infor-
mation is considered proprietary, and shot.ld be prepared so that
proprietary information identified in the application is contained
in an enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
41
&
R. F. Heishman, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Rpt.
No. 50-341/78-11
cc w/encis:
{
Central Files
,
Reproduction Unit NRC 20b
l
'
/ PDR
Local PDR
Ronald Callen, Michigan Public
l
Service Cc==ission
l
Eugene B. Thomas, Attorney
(
l
--.