ML20062B247

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-341/78-11 on 780731-0803 & Notice of Violation
ML20062B247
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/30/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML20062B250 List:
References
NUDOCS 7810260169
Download: ML20062B247 (2)


See also: IR 05000341/1978011

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

n

.- _a

G

^-

~

fh1

-

,.

UNITED STATES

j # * % g' '. NUCLEAR REGULATORY COMMISSION

., g

f %),)

-

,,I R EGloN 111 -

  • 3 i g ,' - t 799 mCoSEVELT Ro Ao

GLEN ELLYN, ILLINot$ 60137

,

. ..... "

.

AUG 3111978'

.

Docket No. 50-341

.

Detroit Edison Company .

ATTN: Mr. Edward Eines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

.

Gentlemen:

This refers to the inspection conducted by Messrs. C. M. Erb,

E. W. K. Lee, and H. S. Phillips of this office on July 31-August 3,

1978, of activities by NRC Construction Permit No. CPPR-87 and to

the discussion of our findings with Mr. T. A. Allessi and others of

the Fermi 2 project staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas eynmined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be

in noncompliance with NRC requirements, as described in the enciesed

Appendix A.

With respect to Appendix A, Ites No. 2 is a recurrent item. In

your response please give this =atter your particular attention.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to

this office within thirty days of your receipt of this notice a

written statement or explanation in reply, including for each

,

item of noncompliance: (1) corrective action taken and the

results achieved; (2) corrective action to be taken to avoid

further noncecpliance; and (3) the date when full compliance vill

be achieved.

79/oz@M7 q

-

. .

~

.

.

Detroit Edison -2- AUG 3 01978

Company

.

_i

.*

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response eo this letter will be

placed in the NRC's Public Document Room, except as follows. If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application

must include a full statement of the reasons for which the infor-

mation is considered proprietary, and shot.ld be prepared so that

proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

41 &

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Rpt.

No. 50-341/78-11

cc w/encis:

{ Central Files

Reproduction Unit NRC 20b

,

l

'

/ PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

l Service Cc==ission

l Eugene B. Thomas, Attorney

(

l