ML20062B898
| ML20062B898 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/27/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML20062B901 | List: |
| References | |
| NUDOCS 7811020166 | |
| Download: ML20062B898 (2) | |
See also: IR 05000341/1978013
Text
.
,.
'F
-
.
.
__.
,
- "%
UNITED STATES
. , -
+.
NUCLEAR REGULATORY COMMISSION
f., , 1
j
REGloN til
roe aooseveer ao4o
j
GLEN ELLYN ILLINOIS 60137
.._, j
....*
SEP tilgg-
h
Docket No. 50.341
.
The Detroit Edison Company
_
ATTN:
Mr. Edward Hines, Assistant
E
~
Vice President and Manager
._
Quality Assurance
,
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
This refers to the inspection conducted by Messrs. J. Hughes and
(
P. A. Barrett of this office on August 30, 31 and September 1, 1978,
of activities at Enrico Fermi Nuclear Station, Unit 2, authorized
by NRC Construction Permit No. CPPR-87 and to the discussion of our
findings with Mr. R. W. Barr and others of your staff at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
,.
i
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room, except as follows.
If this report
contains information that you or your contractors believe to be
proprietary, you must apply in writing to this office, within
twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application nust include
a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an
enclosure to the application.
,
.3710.2O(G-
(i
__
_
-
.
_.
.- ._
.
-
. ..
'
.
.
-
.
The Detroit Edison
-2-
mPany
ggp g 7}
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
.
0
'
._z.
. F. Beishman, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-341/78-13
cc w/ enc 1:
Central Files
Reproduction Unit NRC 20b
/ PDR
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr. ,
Attorney
f
l
__
. . - . . _
. , ___ _
_ _ . _ . _
.-
,
_ _ . _ _ _ ,
__ _ _ _ . _ _