Forwards Insp Repts 50-324/78-20 & 50-325/78-20 on 780815-18.No Noncompliance Noted
ML20062B858
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/21/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20062B861 List:
References
RII:DGH, NUDOCS 7811010397
Download: ML20062B858 (2)


See also: IR 05000324/1978020

Text

4

1

/t, ). c

'

s'

b

UNITED sT ATEs

[ga8Gu

'o,

NUCLEAR REGULATORY COMMISSION

y. O E',

,

,

(1,-}

REGloNil

,e(,

e,

!

-

g

to1 M ARIETT A STREET, N.W.

!

ATLANTA, GEORGIA 30303

, ggg

,

' + , " . ' "

SEP f. I 1978

.

% .*

,

In Reply Refer To:

'

RII:DGH

50-324/78-20

50-325/78-20

Carolina Power and Light Company

ATIN:

Mr. J. A. Jones

Executive Vice President

Engineering, Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection conducted by Mr. D. G. Hinckley of this office

on August 15-18, 1978, of activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for the Brunswick I and 2 facilities, and to the

discussion of our findings held with Mr. A. C. Tollison at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report centains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

,

l

be prepared so that proprietary information identified in the application is

'

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Rocci.

i

!

yp11 Q10Y( 7

'

. .. .. -

-

,

t

l

!

.

.

._ _

__

___

.

-

-

.

I

Carolina Power and Light Co.

-2-

SEP z 1 teaB

'

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

.o

k]T

F. J. Lon

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report Nos.

50-325/78-20 and 50-324/78-20

cc: Mr. A. C. Tollison, Jr.

Plant Manager

Box 458

Southport, North Carolina

28461

.