ML20062B781

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation & Lll Technical Evaluation Rept Supporting Reactor Protection Sys Power Monitoring Sys Mod. If NRC Understanding Re Mod Implementation Incorrect,Nrc Must Be Notified within 30 Days
ML20062B781
Person / Time
Site: Pilgrim
Issue date: 07/28/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20062B783 List:
References
NUDOCS 8208050040
Download: ML20062B781 (2)


Text

..

' ' ';"L 2 8 1982 , , .

DISTRIBUTION: b~D/h discEe't'TUD DEisenhut AE00 flRC PDR SNorris IE L PDR KEccleston ACRS-10 ORB #2 Rdg Gray File TBarnhart-4 Docket flo. 50-29% ELD LSchneider DBrinkman CMiles RDiggs

!!r. A. Victor Morisi, fianager Nuclear Operations Support Department Boston Edison Corpany 25 Braintree ll111 Park Rockdale Street Braintree,11A 02184

Dear !!r. !brist:

Subject:

Reactor Protection System (RPS) Power ilonitoring System Design flodification Re; Pilgrim fluclear Power Station We have completed our myiew of the subject modification for your facility.

Our review was based on your past submittals as referenced in the enclosed Safety Evaluation. He find your proposed design modifications to be acceptable.

It is our understanding that the nodification will be performed during the first planned outage of eight days duration and that proposed Technical Specification changes will be submitted at that time. If this understanding is not correct, please notify us within 30 des of the date of receipt of this letter.

This completes our review of this issue except for your forthconing Tech-nical Specification subnittal which should conform to the appmpriate guid-ance contained in the Safety Evaluation, the enclosed Technical Evaluation Report, and the revised Ibdel Technical Specification for RPS electric power ronitoring, which is being forwarded separately.

If you have any questions on this matter, please contact your Project Itanager.

Sincerely, Lse.m1 signea by Donenic B. Vassallo, Chief 8208050040 820728 Operating Reactors Branch #2 PDR ADOCK 05000293 P PDR Division of Licensing ,

Enclosures:

1. Safety Evalu tion
2. Technical Evaluation Report cc w/ enclosures:

See next page ORB #2:DL, ORB #2:DL de.

omer > . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .....p,...... . - . . . .. . .. . .. . h.g' .....t)RB

.. . . . . . . #2

. . : DL .

OaJ)RB#2:DL r....... . . . . . . . . . . . . . . . . . .

CURNAMEy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ........ . . . . . . . . . . . . . . . .. . . . . . . . . . . . .

one> . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.?l331.8,2,,: cb,,,, ,Z/Ahp2,, , , ,Z/jyp2, , , ,,, ,,

nac rORM 318 00-80) NMM CC40 0FFIClAL RECORD COPY usa m a n _ m ,eo

Mr. A. Victor Morisi Boston Edison Company ,

cc:

Mr. Richard D. Machon Pilgrim Station Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 Resident Inspector c/o U. S. NRC P. O. Box 867 Plymouth, Massachusetts 02360 Ms. JoAnn Shotwell Office of the Attorney General Environmental Protection Division 1 Ashburton Place 19th Floor Boston. Massachusetts 02108 Rcnald C. Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 e

9 mea %-. y p -.. . M