ML20062B622

From kanterella
Jump to navigation Jump to search
Advises That Plant Operation in Cycle 7 Acceptable W/Thermal Margins for Core Loadings Containing Mixture of Toprod & Exxon Std Fuel Assemblies
ML20062B622
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/22/1982
From: Clark R
Office of Nuclear Reactor Regulation
To: Musolf D
NORTHERN STATES POWER CO.
Shared Package
ML20062B626 List:
References
NUDOCS 8208040642
Download: ML20062B622 (2)


Text

I p.

m i.

h b - 86 O' O AL 22 I 82 DJSTRIBUTION:

vDocket File NRC PDR L PDR Docket Mos. 50-282 NSIC and 50-306 ORB #3 Rdg l

DEisenhut JHeltemes i

OELD Mr. D. M. Musolf I&E Huclear Support Services Dcphrtment ACRS-10 Northern States Power Conpany RAClark 414 Nicollet Mall - Oth Floor PMKreutzer-3 Minneapolis, Minnesota 55401 DCDilanni Gray File

Dear Mr. Musolf:

i By. letter dated March 12, 1902 the EXX0ff Huc1 car Company submitted for our r['

c review a topical report titled " Application of EXXON Uuclear Co. PUR Thermal Margin Methcdology to Mixed Core Configurations" XN-NF-83-21(p); dated March l

1982. You are referencing this report in your reload analysis for the Prairie +

Island Huclear Generating Plant under the provisions of 10 CFR 50.59. The analytical acthods in this topical report are applicable to Unit 1 (Cycle 7.)

and Unit 2 (Cyclef7) since each core loading contains 40 TOPROD fuel assemblies mixed with the standard EXXON assenblics. Other analytical methods that you i

are referencing in your reload analysis for TOPROD fuel assemblics appear in i

the topical report. titled " Generic Mechanical, Thermal Hydraulic and Neutronic Design for EXX0M Huclear TOPROD Reload Fuel.assemblics for Pressurized Water Reactors" Xff-NF-30-56(p) dated November 1900.

ByourletterdatedNovenberIb,1981toEXXONNuclearCompanyInc,theNuclear Regulatory Commission excluded the acceptance of supplement No. I to the topical i

report XN-UF-00-56(p). dealing with thernal margins, since we had not conpleted our evaluation. However, since that time our evaluation of topical report XM-NF-00-5G(p) supplement No. 1 & XR-NF-D2-21(p) has progressed to a point sufficient for us to conclude that the thermal margins for Unit No. 1 (Cycle

7) and Unit No. 2 (Cycle 7) are adequate to compensate for uncertainties i

related to the analytical nethods employed by the EXX0H Uuclear. Company.

Thereforeaes. conclude that the operation in Cycle 7 at the Prairie Island Nuclear Generating Plant finits 1 and 2 is acceptable with respect.to the thermal margins for core loadings containing a nixture of TOPROD and EXX00 standard fuel assemblies.

i Copics of the safety evaluations for bcMgW3f Qnadeyenclosed.

k. r[aikghedby' Robert A. Clark, Chief 8208040642 820722 Operating Pcactors Granch'#3 gDRADOCK05000 Division of Licensing cc: See next page i

omco.QRSf,3g..,,

,S.R,B,Q,;,d,,$,

pg

pR,,k,,,,,,

su m u o.P,M) 3,uge,r.,

,,D.C,D,M,ang,1,/p,n,f, A,,,,,a,(,,,,, T,M,t v,ah,,,,,,,,

.._,.........h.......

omy 7./.21./s2........7/..$ia2........,.7I.h.h2...... N... R........

OFFICIAL RECORD COPY use mi-um

. - -. -.,~_-

unc ronu us oow nscu om

~

'l L

Northern States Power Company cc:

Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Mr. Louis J. Breimburst Mr. R. L. Tanner Executive Director County Auditor Minnesota Pollution Control Agency Red Wing, Minnesota 55066 1935 W. County Road B2 Roseville, Minnesota 55113 U. S. Environmental Protection Agency Federal Activities Branch The Environmental Conservation Library Region V Office Minneapolis Pubite Library ATTN: Regional Radiation 300 Nicollet Mall Representative Minneapolis, Minnesota 55401 230 South Dearborn Street Chicago, Illinois 60604 Mr. F. P. Tierney, Plant Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Jocelyn F. Olson, Esquire Special Assistant Attorney General Minnesota Pollution Control Agency 1935 W. County Road B2 Roseville, Minneosta 55113 U.S. Nuclear Regulatory Commission Resident Inspectors Office Route #2, Box 500A Welch, Minnesota 55089 Regional Administrator Nuclear Regulatory Commission, Region III Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137

/

t 9

-