ML20062B435
| ML20062B435 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/07/1982 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20062B405 | List: |
| References | |
| PROC-820707-01, NUDOCS 8208040483 | |
| Download: ML20062B435 (6) | |
Text
_
-1 i
~
7-s EPIP
.4 m
'3 j
100 - STATION GROUP DIRECTOR'S DUTIES l
100-1 Supervision of Emergencies, Drills and Exercises (Primary Responsibill:7 - Station Director)
Rev. 2 4/82 100-C1 Station Director - Checklist of Initial GSEP Responsib111:1es Rev. 2 3/82 J
100-C2 Operations Director - Checklist of Inizial GSEP Responsibilities Rev. 1 1/81 100-C3 Technical Director - Checklist of Initial GSEP Responsibilities Rev. 2 2/82 100-CA Maintenance Director - Checklist of Initial GSEP Rasponsib111:1es Rav. 1 3/81 100-C5 Stores Director - Checklist of Initial GSEP Responsibill:1es Rev. 1 7/81 100-C6 Administrative Director - Checklist of Ini:1a1 GSEP Responsibill:1es Rev. 2 10/81 100-C7 Securi:7 Director - Checklist of Initial GSEP Responsibill:1es Rev. 2 7/32 100-C3 Rad /Chen Direc:ct - Checklist of Initial GSEP Responsibili:ies Rev. 2 6/82 100-C9 Energency Reports Checklist (?ri=ary Responsibility - Operations Direc:or)
Rav. 1 3/81 i
ICO-C10 Record of GSEP Activicies Rev. 0 1/81 100-Cll Environs Director - Checklist of Ini:1a1 GSEP Rasponsib111:1es Rev. 0 7/81 i
100-C12 Operational Support Canter Supervisor /
Operating Poreman (Checklist of Initial s
GSEP Responsibilities)
Rav. 0 6/82 100-Cl3 operational Support Cancer Supervisor / Rad./
Chem. Poraman (Checklist of Initial GSEP Rasponsibili:tes)
Rev. 0 6/82 l'~
jul.~o71982 8208040483 820722 PDR ADOCK 05000010 F
PDR 1 0:.
I j
l t
t~ -
1 J
EPIP 100-C7 j
j Revision 2 1
i m
July 1982
~
SECURITY DIRECTOR (Checklist of Initial GSEP Responsibilities)
NOTE This checklist is provided solely for the convenience of the Security Director.
It is not necessary to follow this checklist step by step.
Its completion is not required and its use is determined by the Security
[ -
Directo r.
I.
Identify to the Station Director any non-routine security pro-i cedures and/or contingencies that are in effect or that require a response.
l 'l i
i II.
Account for all personnel in accordance with the procedure for Assembly and Evacuation of Personnel (EPIP 300-3).
III.
Control access to roads entering the plant property IV.
Assist the Administrative Director with controlling access to the Technical Support Center.
V.
Dispatch Security personnel to the Emergency Operations Facility if activated.
VI.
Coordinate with Rad./ Chem. Director to keep security personnel informed of area affected by gaseous release. Consider devel-oping a means to avoid or monitor entrance of security personnel into possible plume path.
VII.
Coordinate with the Rad./ Chem. Director and control ingress and egress to and fran the protected area.
VIII. Record subsequent GSEP-related activities on Record of GSE?
Activities (EPIP 100-C10).
' APPROVED o
JL 07'82 1 of 1* ypp'rt-D.O.S.R.
]
. EPI?
500 - MAINTAINING EMERGENCY PREF.G.EDNESS 500-1 Quarterly Inventory of First Aid Supplies (Pr.=ary Responsibility
.WWstrative Director)
Rev. 0 1/31 500-2 Annual / Quarterly GSE? Trailer Inventory
(?rimiary Responsibility - Rad / Chem Director)
Rev. 1 2/31 500-3 Quarterly St. Joseph Hospital Isergency Car:
Inventory (?rimary Responsibility - Rad / Chem Director)
Rev. 1 6/81 500-4 Monthly Decentam%ation and Medical Area Inventory (Primary Responsibility - Rad / Chem Director)
Rev. I 1/32 500-3 Quarterly Technical Suppor: Center Inventory (Primary Responsibility - Rad / Chem Director)
Rev. 0 10/80 500-6 Quarterly Operational Suppor: Center Inventory
(?ri=ary Responsibility - Rad / Chem Director)
Rev. 0 10/80 500-7 operational Checks of Cc==unications Systems
(?rimary Responsibility - GSEP Coordinator)
Rev. 4 1/82 500-8 Quarterly E=argency Opera:1ces Facility Inventory (?-imary Responsibility - GSEP Coordinato r)
Rev. 0 5/82 500-9 Operational Check of Notification Phone List Rev. 0 7/82 JUL 071982 1 of 1
+
my-
EPIP 500-9 Revision 0 July 1982 OPERATIONAL CHECK OF NOTIFICATION PHONE LIST A.
PURPOSE The purpose of this procedure is to describe the method for testing the Emergency Plan Implementing Procedure (EPIP) Notification Phone List for shift augmentation.
B.
REFERENCES 1.
NUREG - 0654.
2.
EPIP Notification Phone List.
3.
Generating Station Emergency Plan (GSEP).
C.
PREREOUISITES None.
D.
PRECAUTIONS 1.
Do not call bargaining unit personnel.
2.
Ensure that all personnel understand that travel to the plant is not required.
E.
LIMITATIONS AND ACTIONS 1.
If at any time during the test an actual emergency should occur, discontinue the test.
2.
Do not interfere with nonnal shift operation.
F.
PROCEDURE 1.
Person requesting the test (Station GSEP Coordinator, Operations Duty Supervisor or Shif t Engineer),
a.
Call or notify the Shift Engineer of the test requirenent.
b.
Request the Shift Engineer or his delegate record the time and initiate the test in accordance with this procedure.
2.
Shift Engineer or his delegate, a.
Call an Operations Duty Super /isor and repeat the following message:
APPROVED Jul. 07'82-O.0.S.R.
O O
EPIP 500-9 Revision 0 "This is a test of the GSEP Notification Phone List. Please make the required calls for a Site Emergency.
Do not call bargaining unit personnel. Record the time initiated, the name of each person contacted, the time each person is contacted and the time required for each person to reach his reporting station.
Report back to the Shif t Engineer or his delegate when your portion of the call list is canplete. Send all record sheets to the Station GSEP Coordinator. This is a test."
b.
Record time notified of the completion of each call list.
c.
Send record of times to the Station GSEP Coordinator.
3.
Operations Duty Supervisor, a.
Call the Maintenance GSEP Supervisor and repeat the follow-ing message:
"This is a test of the GSEP Notification Phone List. Please
~
make the required calls for a Site Emergency.
Do not call bargaining unit personnel. Record the time initiated, the name of each person contacted, the time each person is contacted and the time required for each person to reach his reporting station. Report back to the Shif t Engineer or his delegate when your portion of the call list is complete. Send all record sheets to the Station GSEP Coordinator. This is a test."
b.
Call personnel for the remaining positions on Call List A, record time each person was contacted and obtain travel time estimates for each person.
c.
Call the Shift Engineer or his delegate when Call List A has been completed.
d.
Send records to the Station GSEP Coordinator.
4.
Maintenance GSEP Supervisor.
a.
Call the Technical Staff GSEP Supervisor and repeat the following message:
"This is a test of the GSEP Notification Phone List. Please make the required calls for a Site Emergency. Do not call bargaining unit personnel. Record the time initiated, the name of each person contacted, the time each person is contacted and the time required for each person to reach his reporting station.
Report back to the Shif t Engineer or his delegate wnen your portion of the call list is canplete. Send all record sheets to the Station GSEP Coordinator. This is a test."
APPROVED Jul.07*82 2 of 3 D.O.S.R.
EP!P 500-9 Revision 0 b.
Call personnel for the remaining positions on Call List B, record time each person was contacted and obtain travel m
time estimates for each person.
c.
Call the Shift Engineer or his delegate when Call List 3 has been completed, d.
Send records to the Station GSEP Coordinator.
5.
Technical Staff GSEP Supervisor.
a.
Call the Rad./ Chem. GSEP Supervisor and repeat the following message:
"This is a test of the GSEP Notification Phone List.
Please make the required calls for a Site Emergency. Do not call bargaining unit personnel. Record the time initiated, the name of each person contacted, the time each person is contacted and the time required for each person to reach his reporting station. Report back to the Shif t Engineer or his delegate when your portion of the call list is complete. Send all record sheets to the Station GSEP Coordinator. This is a test."
b.
Call personnel for the remaining positions on Call List C, record time each person was contacted and obtain travel time estimates for each person.
c.
Call the Shift Engineer or his delegate when Call List C has been completed, d.
Send records to the Station GSEP Coordinator.
6.
Rad./ Chem. GSEP Supervisor.
CAUTION Do not call bargaining unit personnel.
a.
Call personnel for the positions on Call List 0, record i
time each person was contacted and obtain travel time estimates for each person.
b.
Call the Shift Engineer or his delegate when Call List D has been completed.
c.
Send records to the Station GSEP Coordinator.
G.
CHECKLISTS None.
H.
TECHNICAL SPECIFICATiong pEFER NCES APPROVED
~'
None.
Jll 07'82 3 of 3 FINAg D.C.S.R.
I
-