Forwards Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 100-C7, Security Director & Revision 0 to EPIP 500-9, Operational Check of Notification Phone List. Receipt Form Encl
ML20062B423
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/10/1982
From: Scott D
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20062B405 List:
References
81-264, NUDOCS 8208040479
Download: ML20062B423 (5)


Text

I Commonw:alth Edison C --

Dresd;n Nuclear I )w*r 3titirn R.R. #1 Morr'- Illinois 60450 Telephone 815/942-2920

,, fl fh

/ h _fk Date DJS LTR:

81-264 l

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Coc: mission Washington, D.C.

20555

Subject:

Emergency Plan Implementing Procedures for Dresden Station Units 1, 2, and 3; NRC Docket Nos. 50-10, 50-237, and 50-249

References:

(a) D. J. Scott letter to H. R. Denton, dated March 12, 1981 (b) Title 10, Code of Federal Regulations, Appendix E, Part V

Dear Mr. Denton:

Enclosed are ten (10) copies of revisions to Dresden Station Emergency Plan Implementing Procedures.

No return of transmittals is necessary.

Sincerely, f

D.

. Scott Station Superintendent Dresden Nuclear Power Station

'DJS:TGB:mt Enclosures cc:

T. Blackmon File /NRC File / Numerical COI 8208040479 820722 PDR ADOCK 05000010 F

PDR

1

~.

DAP 9-2 Revision 12 DRESDEN STATION PROCEDURE ROUTING

)

(TRANSMITTAL RECEIPT) 5er No.os9Mr&

C#8s-ata) s

[f 9T

/dO - O 9 t _ 4 LlJ. [

REMOVE:

d ff l00- 00,t ADA? &

INSERT:

(Sign and return this form to the Procedures Manager.)

d 1 hereby acknowledge receipt of the above.

1 Signed Date FORM 9 2A (Cont'd.)

.- s, APPROVED JJL 0 7*82 24 of 32 D.O.S i

9 I.

p DAP 9-2 Revision 12 i

l PROCEDURE HISTORY AND SAFETY EVALUATION Procedure E///

/#o <* 7 Rev. No.

E Description of Procedure Revision or of New Procedure

[e s w e e % e a e r.~V

[f Evns-ed or 400 Tre

~~

a Am 9ectera.] BJ Gaza,-s Eew s e f

.a.

1 Justification for New or Revised Procedure i

=

1 Supportive References (Letters, Temporary Change Requests, Procedure Inquiry, N U R EG, etc.)

FORM 9-29

' l-APPROVED 2s of 32 JA. 07'82 D.O.S.R.

~

DAP 9-2 Revision 12 DRESDEN STATION PRCCEDURE ROUTING

(TRANSMITTAL RECEIPT)

N Woo.e-W' (Ma-Mt) s bO REMOVE:

/

(O S.

( N OO-t 4OA7 h

INSERT:

m o i _1_ Y t $lA 4 0 0,. f _(LUL (Sign and return this form to the Procedures Manager.)

I hereby acknowledge receipt of the above.

Signed Date FORM 9 2A (Cont'd.)

APPROVED JtR. 07'82 24 of 22 D.O.S.R.

.. _ - _ _ =

___.-u.

DAP S2 j

i Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION Procedure F Pi P -Foo - 9 Rev. No.

O Description of Procedure Revision or of New Procedure

_$ca Puador u, eaa.cn H. a 7~~

1% ~+ c Ocr fu, h,,.,u-.,,.*'

m Justification for New or Revised Procedure 4&e d. -., ~ e i

l Supportive References (Letters. Temporary Change Requests Procedure Inquiry, N U R EG, etc.)

doeeC b <. f 4 FORM 9-28 APPROVED 2s of 32 atjl. 07'82 D.O.S.R.

-_m.-

s

, - - -. - - - - - -