ML20062B176

From kanterella
Jump to navigation Jump to search
Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 100-C8, Rad/Chem Director. Revised Index of Station Group Director Duties Encl
ML20062B176
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/30/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20062B158 List:
References
EPIP-100-C8-01, EPIP-100-C8-1, NUDOCS 8208040361
Download: ML20062B176 (5)


Text

~

I EPIP 100 - STATION GROUP DIRECTOR'S DUTIES 100-1 Superi1sion of E=ergencies, Drills and Exercises (Primary Responsibility - Station Director)

Rev. 2 4/32 100-C1 Station Director - Checklist of Inizial GSEP Responsib111:1es Rev. 2 3/82 100-C2 Operations Director - Checklist of Initial GSEP Responsibilitles Rev. I 1/81 100-C3 Technical Director - Checklist of Initial GSEP Responsib111:1es Rev. 2 2/82 100-C4 Maintenance Director - Checklist of Initial GSEP Responsibilities Rev. 1 3/81 100-C5 Stores Director - Checklist of Initial GSEP Responsib111 ties Rev. 1 7/S1 100-C6 M mstrative Direc:or - Checklist of Initial GSEP Responsibilities Rev. 2 10/91 100-C7 Security Direc:or - Checklist of Initial GSEP Responsibill:1es Rev. I 1/31 100-C3 Rad / Chem Director - Checklist of Initial GSEP Responsib111:1es Rev. 2 6/82 100-C9 Emergency Reports Checklist (Prima'yr Responsibility - Operations Direc:or)

Rev. 1 3/31 100-C10 Record of GSEP Ac:1v1:1es Rev. 0 1/81 100-C11 Environs Director - Checklist of Initial GSEP Responsib111:1es Rev. 0 7/81 100-C12 Operational Suppor: Center Superiisor/

Operating Foreman (Checklist of Initial GSEP Responsibilities)

Rev. 0 6/82 100-C13 Operational Suppor: Center Superrisor/ Rad./

Chem. Fore =an (Checklist of Inicial GSEP Responsibili:1es)

Rev. 0 6/82 JUN301982 8208040361 820713 PDR ADOCK 05000010 1 of 1 F

P D,.R.,

, e mm.. mnw.

e

.~-e.

~

EPIP 100-C8 RAD./ CHEM. DIRECTOR Revision 2 (Checklist of Initial GSEP Responsibilities) June 1982 NOTE This checklist is provided solely for the convenience of the Rad./ Chem. Director.

It is not necessary to follow this check-list step by step.

Its completion is not required and its use is detemined by the Rad./ Chem. Director.

I.

Assist the Operations Director in organizing rescue operations for injured personnel.

Number of Injured Ambulance Required Contamination Involved Location Injureo sype or Contaminatea Transportation Personnel Injuries Required 1.

2.

3.

4 5.

II.

Identify to the Operations Director radiological precautions that the Operations Department should follow.

III.

Commence preparatory alignment of the High Radiation Sampling System (HRSS) as follows:

A. High Radiation Sampling System Ventilation during Post-Accident Condition (D0P 8900-1) completed.

B. Conversion of HRSS from Normal Operation Alignment to Post-Accident Operation Alignment (DSBP 2000-1) ccm-pleted.

IV.

Commence on-site assessment of any effluent release or.

radiation problem requiring Generating Station Emergency Plan (GSEP) activation.

Samples and surveys during post-accident conditions should be performed in accordance with the following prioritized guidelines:

APPROVED 1 of 4 JUN 30'82 D.O.S.R.

EPIP 100-C8 Revision 2 A.

Perform area surveys and collect air surveys in the Control Room, Assembly Areas, Technical Support Center and Operational Support Center if a gaseous release is occurring or if radiation levels in Primary Containment are greater than the Unusual Event classification.

B.

Collect air or liquid samples as close as possible to the point of any effluent release that is occurring as a result of the event.

C.

Collect reactor water, torus water, drywell air and sump water samples as necessary to accommodate safe operation of the plant.

D.

Perfonn local area surveys and collect air samples as appropriate to accomplish required maintenance activities.

E.

In the absence of the Environs Director and once per-sonnel become available, perfonn off-site surveys and collect off-site air and water samples.

V.

Record appropriate initial readings as follows:

A.

Wind Direction B.

Wind Speed C.

150 ft. - 35 ft. Temperature Difference D.

Radiation Monitor Readings Monitor Reading 1.

2.

~

3.

4.

l 5.

VI.

Commence off-site environs monitoring as appropriate.

A.

Contact the G.E. Fuel Re-Processing Plant and inquire about any abnonnal responses observed on their instrumentation that may hav!! resulted frem a Dresden release.

l B.

Dispatch the Environs Director to the Emergency Operations j

Facility (EOF).

APPROVED 2 of 4 JUN 30'82 U.O.S.R.

i.

4 EPIP 100-C8 Revision 2 NOTE In the absence of an Environs Director, the Rad./ Chem. Director assumes responsibility for off-site environs monitoring.

C.

Dispatch two teams of Rad./ Chem. personnel to the GSEP trailer to obtain supplies and report to the Environs Director at the EOF.

D.

Dispatch a team of Rad./ Chem, personnel to the EOF to assist the Environs Director as needed.

NOTE This team should be instructed to carry the following equipment:

1.

A low Range Ion Chamber Survey Instrument 2.

A High Range Gamma Survey Meter VII.

Consider issuing one tablet of 130 mg per dose of potassium iodide to personnel who are subjected to either of the following conditions:

A.

Personnel, within one hour, have been subjecged to an airborne concentration of I-131 of 5.0 x 10 uCi/cc or greater.

B.

Personnel would receive a projected calculated dose equivalent of 10 Rem or greatar to the thyroid gland.

NOTE Call Company Medical Director, W. Harrison Mehn, M.D., on (312) 294-3034 immediately following a suspected exposure as indicated above.

VIII. Call in additional Management Chemist to assist in directing counting room activities.

IX.

Assist the Operations Director in determining the need for an assembly and/or an evacuation.

A.

Evacuation route of lowest dose rate per Assembly and Evacuation of Personnel (EPIP 300-3).

Route #1 Route #2 APPROVED' 3 of 4 JUN 30'82 u.O.S.R.

~

1

+

z s

l'c EPIP 100-C8 Revision 2

_s 8.

Off-sit _e ass'embly required for personnel monitoring. -----

~

s GSEP Trailer G.E. Fuel Re-Processing Plant LaSalle Station f

Braidwood Station C.

Radiation Protection personnel available to escort and monitor i

evacuating personnel. --

X.

Coordinate with the Security Director and control ingress and egress I

to and from the Protected Area.

XI.

Provide the Operations Director with information on the hazards and protective measures associated with Toxic or Hazardous materials. ' -

XII. Commence processing non-injure 8$ personnel as appropriate.

A.

Organize a personnel survey' team.

8.

Activate and staff personnel decontamination facility.

- - ---~~

C.

Determine the need for bioassay procedures to be performed. -- -

XIII.' Note additiona' 7;uipment and/or support requested from the Healtn

, Physics Dire cb.

.n r.

N t

N XIV.

Record subseouent GSEP-related activities on Record of GSEP Activities (EPIP 100-C10).

+

APPROVED 4 of 4

'IFINAL)

JilN 30'82 D.O.S.R.

l a

w

~

---q

.