i OPERATING DATA REPORT DOCK'ET NO.
50-321 DATE 10-5-78 i
COMPLETED !!Y S.
M. Wilson TELEP110NE 912-367-7781 i
OPER ATING STATUS Hatch - 1 Not'5
- 1. Unit Name:
September 1978 r:
.s
- 2. Reporting Period:
2436
- 3. Licensed Thermal Power (MWt):
809
- 4. Nameplate Rating (Gross MWe):
t;;
(s 786 c
L
- 5. Design Electrical Rating (Net MWel:
748.6
- 6. Masimum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
]
717
- 8. If Changes Occur in Capacity Ratin;;s (Items Number 3 Through 7) Since Last Report. Give Reasons: -
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
- 10. Reasons For f.estrictions,if Any:
This Month Yr to.Daic Cumulatise 720 6551 35497
!!. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 709 4489.7 26294.6
- 13. Reactor Resene Shutdown Hours 0
0 0
- 14. Hours Generator On Line 700.6 4307.7 23932.5
- 15. Unit Reserve Shutdown Hours 0
0 0
1602904 9139858 45072680 q~f
- 16. Gross Thermal Ener;y Generated (MWH) 525950 3003850 14560711
- 17. Gross Electrical Energy Generated (MWH) 503189 2853464
- 13S48048
- t
- 18. Net Electrical Energy Generated IMWH) 97.3 65.8 69.7
- 19. Unit Senice Factor 97.3 fi5. 8 69.7 i
- 20. Unit Asailsbility Factor
- 21. Unit Capacity Factor (Using MDC Neil 97.5 60.7 55.9 88.9 55.4 51.3.
- 22. Unit Capacity Factor (Usin; DER Net) 2.7 22.2 19.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.1) ate.and Duration of Eacht:
Refueling Outage; 3-1-79: 6 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITI \\ L CRITICALITY INITI A l. ELI.CTillCITY l
gl COMMERCIA L OPElt ATION
- Corrected by 8 HWH less since calculation of August.Yr.-to-Date and 1
Cumulative due to SS ceror 7-21-78.
'(9971
~
-.a Ak'ERAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-321 i
UNIT Hatch - 1 10-5-78 DATE COMPLETED BY S. M. Wilson TELEPilONE 912-367-7781 MONIN September 4
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net) 637 I
37 763 2
630 gg 764 3
735 766 39 4'
748 20 762 5
750 21
' 759 6
753 758 22 7
754 741 23 8
748 333 ~
24 9
723 162 25 10 750 587 26 I
753 720 27 752 710 12 28 754 13 29 14 750 677 30 15 760 3g 16 761 1
INSTRUCTIONS On this format. fist the average daily unit power level in MWe. Net for each day in the reporting month. Compute to t
the nearest wnole megawatt.
l (9/77)
I
=
W
.e..
t w
\\.'
s,:
50-321 DOCKET NO.
j UNIT NAM E ilatch 1 l
UNIT SilUTDOWNS AND POWER REDUCTIONS DATE 10-5-78 COMPLETED 8Y S.
M. Wilson REPORT MON Til Sept.
TELErilONE 912-367-7781 l
l
'*L
.! g 3
Y Licensee
,E t, he,,
Cause & Corrective Action to No.
Dale i
3g
(
255 Event U
Q F
5 3 ;g =g Report a mo Prevent Recurrence l
ou i
1 1
I 78-19 9-24-78 F
19.5 A
3 CD Instru.
Auto-scram due to MSL Ili-Rad monitor upscale l
1 4
1 2
3 F: Forced Reason:
Method:
Exhibit G. Instructions 5: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data 1141aintenance of Test 2 Manual Scram-Entey Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Other(Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G Operational Error (Explain)
Exhibit I.Same S urce (9/77)
Il-Other (Explain)
~
i i
=
NARRATIVE REPORT UNIT 1 i
i Sept. 1 Preconditioing following #4 SV Outage L
s
?
Sept. 1 Reducing Load for Rod Adjustment 2240 CDT r
Sept. 2 Preconditioning t
l I
Eept. 4 Normal Operation I
Sept. 24 Reactor Scram 78-9 (GO-1-78-13) due to MSi High Radiation monitor drif t while~ at half scram for calibration 1045 CDT Reactor Critical at 2145 CDT l
?
i 4
Sept. 25 On Line 0610 CDT 1
Sept. 26 Preconditioning l
t
~
There was no single release of radioactivity or single radiation e'xposure-which accounts for more than 10 percent ~of the allowable annunal values i
during the month of September.
^
h I
e I
"s.
k i
+
f v
I
(
f i
- 1.h' l
e ~
s,n.--,vv,
,yn.-
+
-w-
l
~
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR SEPTEMBER 1978 4
NUMBER DATE COMPLETED DESCRIPTICH 1391 9/27/78 Recalibrate
'n Recorder 2802 9/7/78 Repair PSW 1 2808 9/7/78 Repair Oil 1 cire MG Set Lube Oi}
2831 9/16/78 Change Oil f -
and Diesel Engine as pt 0
r"%
2855 9/26/78 Repair Sente.
ter 2906 9/1/78 Repair Inta
' ut 2924 9/21/78 Calibrate "r
.c Gallons" Counter 2938 9/25/78 Rework Dies'
- ilation Fan 2959 9/14/78 Check CRD T_
. Operation 2982 9/13/78 Calibrate "r uct Iodine" Monitor 2998 9/13/78 Rewire Compe
.isplay #2
- l.,
3014 9/13/78 Check "Suppr-System B Hi Temp" /..
3016 9/14/74 Clean R/W I!J 21ation
)
Monitor Tanh
/
3018
'9/6/78 Repair "A" A:
3028 9/24/78 Repair Prim:.
aant Nitrogen Makeup Intc; 3045 9/14/78 Repair " Safe
.uto Blow-down Temp" L Temp" 3046 9/13/78 Calibrate ".
x Recorder 9
^
i 1
i 3055 9/6/78 Repair "Rx Bldg. Stack" Recorder 3062 9/13/78 Calibrate " Fission Product Iodine" Monitor r
?
3065 9/13/78 Repair Annunciator For " Steam or Water Analysis Room" l
3066 9/20/78 Check "Drywell Cooling Unit 7A Lo Diff. Press." Alarm j
3068 9/13/78 Repair" Inlet Flow to Hold Up i
Line" Recorder 3069 9/24/78 Adjust Circ. Water Pump 1B
[
Sump Pumps 3070 9/13/78 Check " Torus Water Level Lo"
[
)
Alarm 3075 9/13/78 Remove Alarm Card for Unused f
" Diesel Gen. & Intake Structure t
Cable Tray" Monitor
{
3079 9/27/78 Repair CRD Accumulator Valve f
i Leak i
t 3084 9/13/78 Inspect Wiring for D/G Governor
[
3092 9/14/78 Repair RWCU Pump "B" Leak
(
l 3097 9/21/78 Calibrate Discharge Integrator Readings and Discharge Flowrate Indicator 3099 9/13l?8 Repair " Unit Aux. Transf. 1B" Alarm i
3100 9/24/78 Repair CRD Temp. Recorder e
3101 9/13/78 Repair "Racire MG set Drive Motor
& Gen Temp." Recorder i
F 3103 9/13/78 Cheth "Drywell/ Torus AP" Recorder 3138' 9/13/78 Replace Indicator Light for "No r
Exhaust Fan Running" Monitor 3143 9/15/78 Check "Recire. MG Set Motor Temp" Recorder 4
1 3144 9/22/78
' Replace Sensor Element for " Reactor Bldg. Vm't Exhaust" ARM i
M p-g
-y-g p--
, - + - -
-7 w
s t
3156 9/27/78 Check "D/G "B" Crankcase l
Press /Vac" Manometer 3168 9/24/78 Repair "RWCU Knocker Valve" i
Indicators N
3173 9/24/78 Check RWCU Pump B Leak 3174 9/18/78 Calibrate "R/F Vent Exhaust Kad. Monitor 3176 9/21/78 Check Calibration of "Radwaste Discharge Flow to River" Recorder 3209 9/27/78 Add Strip Chart to LPRM 36-21 e
3212 9/19/78 Repair Control Room Air Conditioner
' ~'
Unit 32.13 9/21/78
.Same as 3212 3217 9/24/78 Reset Raised Tronado Vent on Control Bldg. Roof 3223 9/18/78 Repair "Recirc Pump Temp" Recorder 3228 9/26/78 Repair Personel Radiation Detector HFM-4A 3233 9/21/78 Repair " Reactor Building Inaccessible Area Fan Flow" Recorder
'3234 9/22/78 Repair Oil Leak in RWCU Pump 1B 3235 9/22/78 Repair Door Lock 1A at Diesel Bldg.
East Entrance 3245 9/21/78 Repair Area Radiation Monitor l
3248 9/22/78 Adjust Packing on RWCU Pump B l
Suction Valve l
1 3249 9/22/78 Repair "CRD Temp" Recorder j
3281 9/27/78 Repair " Fuel Pool Pump 1A Low Discharge Press" Alarm i
I
.g.
68v e,_w w-
-