SEPTEMBER #21 y'
s APPENDIX B AVERAGE DAILY UNIT POWER LEVEL IXX'KET NO.
50-302 UNIT FLCRP-3 DATli 10/5/78 '
COMl?LETED BY J. E. Barrett TliLEPilONE 9_04-795-6486
~
1 MONTH SEPTEMBER 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -
(MWe-Net)
(MWe-Net) t-(,
1 0*
17 n
2 18 100 O
1g 140 3
~
4 0
20 160 5
0 21 0
6 0'
0 22 7
0 23 O
8 0
24 0
9 0
--25 0
- 10 0
26 n
'" 11 -
O 27.
0 12 0
2 0
- 13 0.
29 93 14 -
'O 30 235 15 0
31 a
16'
~0 i-INSTRUCTIONS On this form, list the average daily unit power level in MWe. Net for each day in tric reporting month. Compute to the' o
nearest whole mepwatt.
. )
'these figuies will he u ed to plot a r.raph for caeh reporting month. Note that when noximum dependable caiucit.s is used foi the net ele. trit.:1 i.iting ol' the unit, there may be ocea:, ions whsn the dady avea;c power lesc! exceed, the 100'; hne (or the re. tris teil power Incl line). In such cases, the averare daily ~ unit power output sheet :,hould be footnotcJ to e.splus. II.e appnent anoma!y.
-/ g-( o/(, o49y 4 1.16 8
o.
W
-6 PERM 2NO-DM*-#EPO*f--
i DOCKET-MG. 302 -
--)
DATE:
10/1/78 COMPLETED BY:
J.E. BARRETT TELE PHONEM 904-)-795-6486 QPEReIINQ }Igly)
INOTES I
UNIT NAME CRYSTAL RIVER N3 1
1
.EPORTING PERIOD: 9/1/78*9/30/78 l
1 R
verueen tur nu u_
nougg_tpuri, au-a i
i NAMEPLATE RATING (GROSS MWE):
890 1
I DESIGN ELECTRICAL RATING (NET MWE):
825 1
1 MAXINUM DEPENDABLE CAPACITY (GROSS MWE):
835 I
I MAXIMUM DEPENDABLE CAPACITY (NET MWE):
797 1
1
_________.w__________
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE i REASONS'
__________.a__
___==
lPOWERLEVELTOWHICHRESTRICTED.IFANY(NETMWE); NONE
>scoseM: ecener m.uoNr.Ir
,_m_____._____.___________
THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6551.0 13607.0 1, 2,. NUMBER OF HOURS REACTOR WAS CRITICAL 218.5 1592.3 7648.2 orarven negenue eugtppuu uggne n_n n,n 3n,u
- 14. h0URS GENERATOR ON-LINE B6.3 1435.5 7350.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 if. 0 809? TMCAMAL.EMERGV-GENEa ^'r"
'" 81& O 29-70681,"
15596142, 4 - -
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 19233.0 1009301.0 5278330.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 16066.0 957037.0 4994756.0 la UMIP EE"VICE rect 0" L3,0 '-
20,9
'^
54,6+#*
- 20. UNIT AVAILABILITY FACTOR 12.0*/*
21.9e/*
54.0*/*
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 2.8+/*
18.3*/*
46.1*/*
I
- 22. UMIT !^"^CI*Y "a T0" 'UCIMC SC" MET' O. 7.' -
07. 7.' -
St.5+/*
(
- 23. UNIT FORCED QUTAGE RATE 88.0*/*
77.8+/*
43.5*/*
yu eugypeuug etugggggp eygn egg gry, 3 Mcg7gg_4_y.ypg,--DATE,-AND-DURATION-OF-EACH44-o,
_=...
....____..__._..=
=..__.. _-_....._-
( "j 7e ?ugt noun av run ge nengav nemygp ee7; giver pave pc e7anego. _
a-
- 26. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL OPERATION):
FORECAST ACHIEVED yurv7at enyvycat;vy
- f 3 9 i,,
INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77 J
L*
g.
w e
-m
Plu d Till.Y S T A T il S REPORT - R E l ll E l. ! NG INFORMArlON REyllEST
~
e 1.
Name of Facility:
Crystal R i v e r li n i t 3 2.
Scheduled date of next refueling shutdown:
April, 1979 3.
Scheduled date for restart following refueling:
J u ne, 1979 4
Will~ re f ueling or re sump tion -of operation thereafter requ i re a technical specification change or other license amendment?
Yes.
In general, changes to the CR #3 technical specift-caLtons'wiII inelude:
a.
Mode ra to r Te mpe ra t u re Coefficient (3.1.l.3) b.
Control Rod insertion 1. i m i t s (~1.1.3.6) c.
Control Rod Group Assignments (3.1.3.7) d.
Axial imbalance 1.imits (3.2.1) c.
Refueling ll o r o n Concentration (3.9.1)
These'specifleations will be reviewed and changed as neces-sary based on the reactivity of the second cycle as compa red
(
Lo that of the !!rst cycle.
5 Scheduled date(s) Iur submitting proposed lleensing action and supporting information:
Ma rch, 1979 6
Important licensing considerations associated with refuel-
- inn, e.g.,
new or different fuel design or supplier, un-reviewed deign or performance analysis me t hod s, significant changes in luel design, or new operating procedures.
Florida Power Corporation is presently discussing with the NRC staff our intent to request that the power level of CR
- 3 be ra i s e d from the present level of 2452 MW (t) to the ultimate core power level of 2544 MW(t) as described in the CR #3 FSAR.
Aiditional information conrerning our proposed power upgrade for CR #3 will be supplied in forthcoming
{a, monthly operating re po r t s.
7.
The number ut fuel assemblies (a) in the co re and (b) in the spent fuel storage pool, a) 177 assemblics i
b) 4 assemblies 8
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assembltes.
a.
.Present storage capacity - Pool A - 120 plus H failed
~
fuel assemblies i
Pool !! - 120 plus 8 falled l
fuel assemblies i
l
m UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302
' UNIT N AME FLCRP-3 DATE 10/s/7R REPORT MONTil SEPTEMBER, 1978 COMPLETED BY L
E.
Barrett TELEPilONE 904-795-64R6 e.
E E
.! E 3
y $3 1.icensee
,E g j"t Cause & Corrective No.
Date g
3g sa jj5 Event r7 a-
/
Action to H
c$ 5 5
j di g Report 8r 50 Prevent Recurrence c5 1
I 1
Reason:
I 78-6 780303 F
425.3 A
2 RB Conrod Unit down sin'ce 3/3/78 to replace (2) l During burnable poison rods which came un-this mo.
coupled during plant operation to clean up the RC system and repair the ateam generator tubing damaged as a result o f pieces of the poison rod assembly in the RC system.
78-7 782009 F
202.9 A
2 HB &
Valvex Reason; I
CA ZZZZZZ Unit shut down to repair seat leak on main steam safety valve and seal leaks on incore instrument sealing assembly.
78-8 782909 F
5.5 A
2 HB Valvex Reason:
Unit down to replace main steam drain valve which failed.
l INFORMATION: '{otal Forced outage hours this month:633.7 Year to Date:
5016.6 Cum:
5663.0 F: Forced Reason:
Method:
Exhibit G - Instinctions S: Scheduled A. Equipment Failure (Explain) l Manual for Preparation of Dat:
B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporiILER) FileINUREG-D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License lixamination F-Administrative 5
?
G-Operational Error (Explain)
Exhibit 1 Same Source 19/77) ll-Other (Explain) l
}
V L'
..,-s h
8.
(Continued) b, Filed request on January 9,1978 with NRC concerning expansion of Pool A from 120 to 544 assemblies plus 6 failed fuel assemblies and expansion of Pool B from 120 to 609 assemblies.
Expansion of Pool A is to occur after the refueling in April, 1979. The Pool B ex-pansion will occur at a later refueling outage (approximately 1986).
Additional detailed design information concerning our fuel pool expansion was submitted to the Commission on March 3 and March 22, 1978.
9.
The projected date of the last refueling that can be dis-charged to the spent fuel pool assuming the present licensed capacity.
1981-1982.
("
ECS/ emf 5/7a.