ML20059M663
| ML20059M663 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/31/1993 |
| From: | Daughtery L ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20059M655 | List: |
| References | |
| NUDOCS 9311190219 | |
| Download: ML20059M663 (3) | |
Text
DOCKET NO 50-416 DATE 11/03/93 COMPLETED BY L.
F.
Dauahterv TELEPHONE (601) 437-2334 OPERATING STATUS 1.
Unit Name:
GGNS UNIT 1 2.
Reporting Period:
October 1993 3.
Licensed Thermal Power (MWt):
3833 MWT 4.
Nameplate Rating (Gross MWe):
1372.5 MWE 5.
Design Electrical Rating (Net MWe):
1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe):
1143 MWE 8.
If changes occur in capacity Ratings (Items 3 through 7) Since Last Report.
Give Resason:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr to Date cumulative
- 11. Hours in Reporting Period 745
'7.296 79,192
- 12. Number of Hours Reactor was Critical 0
6.332.5 63.878.6-
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
6.183.2 61,396.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 23.276.782 215.516,922
- 17. Gross Electrical En rgy Canerated (MWH) 0 7.477.150 68.558,982'
- 18. Not Electrical Eneroy Generated (MWH) 0 7.185.016 65.652.940
- 19. Unit Service Factor 0
84.8
' 7 9. lB
- 20. Unit Availability Factor 0
84.8 79.8'
- 21. Unit Capacity Factor (Using MDC Net)
O 86.2 77.0
- 22. Unit Capacity Factor (Uslag DER Net) 0 78.8 69.9 23.. Unit Forced Outage Rate 0
4.8 6.1
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period.
Estimated Date of Startup: 11/07/93
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/E2 INITIAL ELECTRICITY-10/20/84 COMMERCIAL OPERATION 07/01/85 0
9311190219 931110 5'
H PDR ADOCK 05000416 h R
PDR 61
.~.
e O
DOCKET NO 50-416' DATE 11/03/93 COMPLETED BY L.
F.
Daucthtery TELEPHONE (601) 437-2334 MONTH october 1993 Day AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
l 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27-0 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
N/A a
J r
.j
Attachment III J *.
UNTT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 2 -
UNIT NAME I
DATE 11/03/93 COMPLETED BY LF.Daughterv i-TELEPHONE 601-437-2334 REPORT MONTH OCTOBER 1993 NO Date Type (1) '
Duration Reason Method Of Licensee System Code Component Cause & Corrective Action To Hours -
(2)
Shutting Event Report #
(4)
Code Prevent Recurrence (C&CA)
+
4 Domt Reactor (5)
(3) 934)03-09/28/93 F/S 803 NC I
93-009 AD EDR Continued Refueling Outage 6.
Reactor shutdown for RFO6 before original schedule because # 10 kt Pump was declared inoperable :md Technical Specification LCO required plant shutdown.
I 2
3 4
5 F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load -
4
. Licensing Examination 6-Other' 9
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
. m m
u
.m
.m
.._______.y 1
-e
=
m