ML20059M653

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1993 for Grand Gulf Nuclear Station Unit 1.Informs That in Sept 1993 MOR, Component Code for Shutdown 93-008 Incorrectly Reported as Pump (P).Corrected Code Is Eductor (Erd)
ML20059M653
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/10/1993
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059M655 List:
References
GNRO-93-00135, GNRO-93-135, NUDOCS 9311190215
Download: ML20059M653 (2)


Text

-

g Entergy Operations,inc.

-- ENTERGY mma a:n G1 w Mb 13150 T.} U.T T D7 ?DO

. _. _. =.. _ _ _..

C. R. Hutchinson t

4 I

f e ')'T' ( n I h,(,4: l' r' J'?

3 November 10, 1993 U.S.

Nuclear Regulatory Commission Mail Station F1-137 Washington, D.C.

20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly operating Report GNRO-93/00135 Gentlemen:

In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1993.

In the September 1993 Monthly Operating Report, the Component Code for Shutdown Number 93-008 was incorrectly reported as a Pump (P).

The corrected code is an Eductor (ERD).

If you have any questions or require additional information, please contact this office.

Yours truly, k

/

].,/av C H/TMC attachments:

1.

Operating Status 2.

Average Daily Power Level 3.

Unit Shutdown and Power Reduction cc:

(See Next Page) t 1 OnO' 3 F I

/d 9311190215 931110 C

PDR ADOCK 05000416

%/D I

R ppg 0

November'10, 1993 GNRO-93/00135 Page 2 of 3 cc:

Mr. R.

H. Bernhard (w/a)

Mr. D.

C. Hintz (w/a)

Mr. R.

D. McGehee (w/a)

Mr. N.

S.

Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S.

Nuclear Regulatory Commission Region II T

101 Marietta St.,

N.W.,

Suite 2900 Atlanta, Georgia 30323 Mr.

P.

W.

O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 I

-