- - _ - _ _ _. - - _

James A.FitzPatrick Nuclear Power Plant P.O. Box 41 Lycoming. Now York 13093 315 342-3840

  1. > NewYorkPower 4# Authority

""7en"6 e*n'"; " "

S s

November 15, 1993 JAFP-93-0611 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 i

Attention:

Document Control Desk

SUBJECT:

OPERATING STATUS REPORT

Reference:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the James A.

FitzPatrick Nuclear Power Plant Operating Status Report for the month of October 1993.

If there are any questions concerning this report, please contact

)

John Cook, Performance Engineering Lead, at (315) 349-6591.

Very truly yours, I

f u/'%/ '7 ll%r HARRY P. SALMON, JR.

6tch HPS:JPC:las Enclosure CC:

F. Edler NS-JAF Department Heads White Plains Office TS File RMS, JAF 9311370472 931031 M

PDR ADDCK 05000333 b'y3 I

l R

g-pyg

i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.

50-333 UNIT NAME:

TIFKPATRICK DATE:

MOVEMBER 1993 COMPLETED BY: RUSSELL TLAGG TELEPHONE:

(315)349-6590 OPERATING STATUS 1.

Unit Names FITZPATRICK 2.

Reporting Period 931001 - 931031 NOTES:

3.

Licensed Thermal Power (MWT): 2436 4.

Nameplate Rating (Gross MWE): 883.Q 5.

Design Electrical Rating (Net MWE):

816.0 i

G.

Maximum Dependable Capacity (Gross MWE) 807.0 7.

Maximum Dependable Capacity (Net MWE) 780.0 l

i 8.

If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

9.

Power level to which restricted, if any (Net MWE):

10.

Reasons for restrictions, if any

]

THIS NONTH YR-TO-DATE CUNULATIVE 11.

Hours in Reporting Period:

744.0 7296.0 160105.0 12.

Number of Hours Reactor was Critical:

566.0 6154.9 110986.3 13.

Reactor Reserve Shutdown Hours:

0 0

0 14.

Hours Generator On-Lines 556.5 5392.0 107123.2 15.

Unit Reserve Shutdown Hours:

O O

O 16.

Gross Thermal Energy Generated (MWH):

1342248.0 12675693.0 236650603.0 i

17.

Gross Electrical Energy Generated (MWH):

449110.0 4197060.0 80519920.0

+

18.

Net Electrical Energy Generated (MWH):

4.$5230.0 4054740.0 77324105.0 19.

Unit Service Factor:

74.8 73.9 66.9 20.

Unit Availability Factor 74.8 73.9 66.9 21.

Unit Capacity Factor (using MDC Net):

75.0 71.2 62.2 22.

Unit Capacity Factor (using DER Net):

71.7 68.1 59.2 23.

Unit Forced Outage Rate:

0.0 15.2 13.1 24.

Shutdowns scheduled over next 6 months (type, date, and duration of each):

Maintenance Outace 10/24/93 - 26 Days 25.

If shutdown at end of report period, estimated date of startup:

11/19/93 26.

Units in Test Status (prior to commercial operation):

FORECAST ACHIEVED Initial criticality 1

Initial Electricity Commercial Operation J

[

l-

~

NEW YORK POWER AUTHORITY JAMES A.

FITEPATRICK NUCLEAR POWER PLANT l

AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH OCTOBER 1993 DOCKET NO.t 50-333 UNIT NAHEs FITEPATRICK DATES NOVxunna 1993 COMPLETED BY: RUSSELL ELAGG TELEPHONES (315)349-6590 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1

816 17 820 l

2 818 18 822 3

817 19 821 4

818 20 823 5

818 21 823 6

820 22 823 7

818 23 675 i

8 819 24 7

9 818 25 0

10 818 26 0

11 820 27 0

12 820 28 0

13 820 29 0

t 14 820 30 0

15 822 31 0

16 820

SUMMARY

The FitzPatrick Plant operated at full power during the reporting period with one scheduled outage.

I i

t I

3

NEW YORK PO2ER AUTHORITY JAMES A.

FITZPATRICK NUCLEAR POUER PLANT UNIT BHUTDOWNS REPORT REPORT MONTHz OCTOBER 1993 DOCKET NO.:

50-333 UNIT NAME:

FITZPATRICK DATE:

NOVEMBER 1993 COMPLETED BY: RUSSELL FLAGG TELEPHONE:

(315)349-6590 D

C UH R

METHOD S

O RO E

OF YC MC NO.

DATE TYPE AU A

SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S

DOWN EVENT TD OD TO PREVENT RECURRENCE IS O

THE REPORT EE NE O

N REACTOR M

E N

N T

10 931024 S

207.5 B

1 N/A N/A N/A Shutdown for Scheduled Maintenance Outage.

1 2

3 4

F: FORCED REASON:

NETHOD:

EXHIBIT G -INSTRUCTIONS S SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)

1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST
2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C.

REFUELING

3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)

D.

REGULATORY RESTRICTION

4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION
5. REDUCED LOAD F. ADMINISTRATIVE
9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN)

NEW YORK POWER AUTHORITY JAMES A. FITEPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE i

REPORT MONTH OCTOBER 1993 DOCKET NO.s 50-333 UNIT NAMES EITEPATRICK DATES NDYearare 1993 COMPLETED BYs RUSSELL ELAGG TELEPHONES (315)349-6590 The FitzPatrick Plant operated at full power during the reporting period except as noteds The unit was removed from service on 10/24/93 0 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> (generator off line) for a scheduled maintenance outage.

The unit is scheduled to return to service on 11/19/93 0 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> (generator on line).

i I

)

l l

-.