James A.FitzPatrick Nuclear Power Plant P.O. Box 41 Lycoming. Now York 13093 315 342-3840
- > NewYorkPower 4# Authority
""7en"6 e*n'"; " "
S s
November 15, 1993 JAFP-93-0611 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 i
Attention:
Document Control Desk
SUBJECT:
OPERATING STATUS REPORT
Reference:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the James A.
FitzPatrick Nuclear Power Plant Operating Status Report for the month of October 1993.
If there are any questions concerning this report, please contact
)
John Cook, Performance Engineering Lead, at (315) 349-6591.
Very truly yours, I
f u/'%/ '7 ll%r HARRY P. SALMON, JR.
6tch HPS:JPC:las Enclosure CC:
F. Edler NS-JAF Department Heads White Plains Office TS File RMS, JAF 9311370472 931031 M
PDR ADDCK 05000333 b'y3 I
l R
g-pyg
i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.
50-333 UNIT NAME:
TIFKPATRICK DATE:
MOVEMBER 1993 COMPLETED BY: RUSSELL TLAGG TELEPHONE:
(315)349-6590 OPERATING STATUS 1.
Unit Names FITZPATRICK 2.
Reporting Period 931001 - 931031 NOTES:
3.
Licensed Thermal Power (MWT): 2436 4.
Nameplate Rating (Gross MWE): 883.Q 5.
Design Electrical Rating (Net MWE):
816.0 i
G.
Maximum Dependable Capacity (Gross MWE) 807.0 7.
Maximum Dependable Capacity (Net MWE) 780.0 l
i 8.
If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9.
Power level to which restricted, if any (Net MWE):
10.
Reasons for restrictions, if any
]
THIS NONTH YR-TO-DATE CUNULATIVE 11.
Hours in Reporting Period:
744.0 7296.0 160105.0 12.
Number of Hours Reactor was Critical:
566.0 6154.9 110986.3 13.
Reactor Reserve Shutdown Hours:
0 0
0 14.
Hours Generator On-Lines 556.5 5392.0 107123.2 15.
Unit Reserve Shutdown Hours:
O O
O 16.
Gross Thermal Energy Generated (MWH):
1342248.0 12675693.0 236650603.0 i
17.
Gross Electrical Energy Generated (MWH):
449110.0 4197060.0 80519920.0
+
18.
Net Electrical Energy Generated (MWH):
4.$5230.0 4054740.0 77324105.0 19.
Unit Service Factor:
74.8 73.9 66.9 20.
Unit Availability Factor 74.8 73.9 66.9 21.
Unit Capacity Factor (using MDC Net):
75.0 71.2 62.2 22.
Unit Capacity Factor (using DER Net):
71.7 68.1 59.2 23.
Unit Forced Outage Rate:
0.0 15.2 13.1 24.
Shutdowns scheduled over next 6 months (type, date, and duration of each):
Maintenance Outace 10/24/93 - 26 Days 25.
If shutdown at end of report period, estimated date of startup:
11/19/93 26.
Units in Test Status (prior to commercial operation):
FORECAST ACHIEVED Initial criticality 1
Initial Electricity Commercial Operation J
[
l-
~
NEW YORK POWER AUTHORITY JAMES A.
FITEPATRICK NUCLEAR POWER PLANT l
AVERAGE DAILY UNIT POWER LEVEL REPORT MONTH OCTOBER 1993 DOCKET NO.t 50-333 UNIT NAHEs FITEPATRICK DATES NOVxunna 1993 COMPLETED BY: RUSSELL ELAGG TELEPHONES (315)349-6590 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1
816 17 820 l
2 818 18 822 3
817 19 821 4
818 20 823 5
818 21 823 6
820 22 823 7
818 23 675 i
8 819 24 7
9 818 25 0
10 818 26 0
11 820 27 0
12 820 28 0
13 820 29 0
t 14 820 30 0
15 822 31 0
16 820
SUMMARY
The FitzPatrick Plant operated at full power during the reporting period with one scheduled outage.
I i
t I
3
NEW YORK PO2ER AUTHORITY JAMES A.
FITZPATRICK NUCLEAR POUER PLANT UNIT BHUTDOWNS REPORT REPORT MONTHz OCTOBER 1993 DOCKET NO.:
50-333 UNIT NAME:
FITZPATRICK DATE:
NOVEMBER 1993 COMPLETED BY: RUSSELL FLAGG TELEPHONE:
(315)349-6590 D
C UH R
METHOD S
O RO E
OF YC MC NO.
DATE TYPE AU A
SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S
DOWN EVENT TD OD TO PREVENT RECURRENCE IS O
THE REPORT EE NE O
N REACTOR M
E N
N T
10 931024 S
207.5 B
1 N/A N/A N/A Shutdown for Scheduled Maintenance Outage.
1 2
3 4
F: FORCED REASON:
NETHOD:
EXHIBIT G -INSTRUCTIONS S SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)
- 1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST
- 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C.
REFUELING
- 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-0161)
D.
REGULATORY RESTRICTION
- 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION
- 5. REDUCED LOAD F. ADMINISTRATIVE
- 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)
H. OTHER (EXPLAIN)
NEW YORK POWER AUTHORITY JAMES A. FITEPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i
REPORT MONTH OCTOBER 1993 DOCKET NO.s 50-333 UNIT NAMES EITEPATRICK DATES NDYearare 1993 COMPLETED BYs RUSSELL ELAGG TELEPHONES (315)349-6590 The FitzPatrick Plant operated at full power during the reporting period except as noteds The unit was removed from service on 10/24/93 0 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> (generator off line) for a scheduled maintenance outage.
The unit is scheduled to return to service on 11/19/93 0 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> (generator on line).