Text
November 9, 1993 Docket Nos. 50-295 DISTRIBUTION and 50-304 sDocketJile A NRC & Local PDRs PDIII-2 r/f JRoe Mr. D. L. Farrar JZwolinski OGC Manager, Nuclear Regulatory Services ACRS(10)
CMoore Commonwealth Edison Company JWermiel JDyer Executive Towers West III, Suite 500 CShiraki BClayton, RIII 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Farrar:
SUBJECT:
ZION NUCLEAR POWER STATION, UNITS 1 AND 2, REGULATORY GUIDE 1.97 COMPLIANCE (TAC NOS. M86112 AND M86113)
By letter dated April 15, 1991, Commonwealth Edison Company (Ceco) described commitmente to re-evaluate the current Reactor Coolant System pressure recorder design and provide an update to the Zion Regulatory Guide (RG) 1.97 Parameter Summary Table. The update to the table also addresses a staff concern with instrument ranges identified in a previous special. inspection and proposed modifications to instruments to ensure compliance with the requirements of RG 1.97.
The previous Safety Evaluation on this subject was sent to the licensee on April 14, 1989.
The staff has reviewed Ceco's submittal and finds the six deviations, the three completed and one proposed modification, and the Technical Specifications amendment to be acceptable methods of complying with the requirements of RG 1.97.
A copy of the Safety Evaluation is enclosed.
Sincerely, OriginalSigned By:
Clyde Y. Shiraki, Senior Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page IUAt PhII-2 PM:PDIII-2, HICBsf,-
D:PDIII-2 0FC kM0' orb CSHIRAKI N JWERh,IE[
JDYER N' NAME Y/ \\ /93 to/rA/93
/// F/93
// / 4 /93
/ /93
/ /93 DATE COPY 57E'S/NO hN0 (9ES/N0 YES/NO)
YES/NO YES/N0 9311170252 931109 PDR ADOCK 05000295 P
PDR E*E E5 EY $ b b I S Y [G 1200'G 3
l
November 9, 1993 Doc Nos. 50-295 DISTRIBUTION and 50-304 Docket File NRC & Local PDRs PDIII-2 r/f JRoe Mr. D. L. Farrar JZwolinski OGC Manager, Nuclear Regulatory Services ACRS(10)
CMoore Commonwealth Edison Company JWermiel JDyer Executive Towers West III, Suite 500 CShiraki BClayton, RIII 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Farrar:
SUBJECT:
ZION NUCLEAR POWER STATION, UNITS 1 AND 2, REGULATORY GUIDE 1.97 COMPLIANCE (TAC NOS. M86112 AND M86113)
By letter dated April 15, 1991, Commonwealth Edison Company (Ceco) descriked commitments to re-evaluate the current Reactor Coolant System pressure recorder design and provide an update to the Zion Regulatory Guide (RG) 1..
Parameter Summary Table. The update to the table also addresses a staff concern with instrument ranges identified in a previous special inspection and proposed modifications to instruments to ensure compliance with the requirements of RG 1.97.
The previous Safety Evaluation on this subject was sent to the licensee on April 14, 1989.
The staff has reviewed Ceco's submittal and finds the six deviations, the three completed and one proposed modification, and the Technical Specifications amendment to be acceptable methods of complying with the requirements of RG 1.97.
A copy of the Safety Evaluation is enclosed.
Sincerely, OriginalSigned By:
Clyde Y. Shiraki, Senior Project Manager i
Project Directorate III-2 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
j See next page bt Phil-2 PM:PDIII-2, HICth a f,r-D:PDIII-2 0FC NAME kM0]TRb CSHIRAKI N JWERk[EL JDYER 6h'M DATE $/\\/93 to/rj!/93
/// F/93
// /T /93
/ /93
/ /93 COPY YES/NO hMO (fES/N0 YES[0)
YES/NO YES/NO
Mr. D. L. Farrar Zion Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 cc:
Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.
l Zion, Illinois 60099 Regional Administrator, Region III i
U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Publ': Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 l