FORM NIS 1 OWNER'S DATA REPORT FOR INSERVICE INSPEdTIONS As required by the Provisions of the ASME Code Rules -

1. Owner Floridh Power Corporationf St. Petersburg, Florida (Nasne and Address of Owner)
2. Plant Crystal River; Crystal River, Florida

. (Naane and Addsens of Mant)

3. Mant Unit 3
4. Owner Certificate of Authoritaties (If sequbed) 50-302
5. Conunercial Service Date 3"l3"77 6. National Board Number for Unis N/A
7. Componentslaspected M audasemer Component or Manufacturer erlasmAer State or National I

APPursenenes or lastallee assid Me, Province No.

Somed No.

Reg,ctor Vessel B&W 620-0007-51 N/A N-117 Steam Generator A Bsw 620-0007-55 N/A 25'N_af EY.

Steam Generator B B&W 620-0007-55 N/A

.25'S of RV RCP-A BYROR_JACESON NOT AVAIiABLE N/71 N/A RCP-B BYRON JACKSON 671N0530 N/A N/A i

RCP-C BYRON JACKSON 741E2410 N/A N/A RCP-D BYRM 3acrMON 533 N/A

__N/A.

Various Piping, N/A N/A N/A-

. Valves and Supports Note: SupW sikes le fann of lists, sketches, or drawings may be used prended (1) size is 8% in. x 11 in.,

(2) information la items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the auseber of sheets is recorded at the top of this form.'

i 9009240130 900914 PDR

~~

ADOCK 05000302 O

PDC m

,,-,,-w.---

y vw

am,

.t s

FORM NIS 1 (back) 1111/07 L8. Enamination Dates March '90to ' June '90 1, inspection Interval from _ t/11/A7 to

_l 80, Abstract of Enaminations. Include a list of esaminatia s and a statement concerning sterws of work requited for cunent interval.

  • See attached-f
81. Abstract of Conditions Noted
  • See attached
12. Abstract of Conective Measures Recommended and Taken
  • See: Attached
  • 1990. Inservice Inspection Report for Florida Power Corporation Refueling f7, Outage #8.

We certify that the statements made in this report are correct and the eman.* nations and corrective mes-1 sures taken conform to the rules of the ASME Code,Section XI.

A a

Date SGDtAP 4.

19 1 $igned FPC gy Q

Owner

/

Certificate of Authorisation No,(if applicable)

N/A Empiration Date N/A CERTIFICATE OF INSERYlCE INSPECTION I, the undersigned, holding a valid enmmission leased by the National Board of Boiler and Pressure Vessel Ina wetors and/or the State or Province of North Carolina and employed by _ Arkwriaht facurance of BoridDod. HA have inspected the components described in this Owners' Data Report during the period Dec. 'R7

- and state that to the best of my knowledge and belief, the Owner

('

Sant.

'8' to has performed esaminations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate pelther the inspector not his employer makes any warranty,empressed oe implN, concerning the esaminations and _ conective measures described in this Owners' Data Report. Furth.fmore, neither the inspector nor his employer shall be liab'e in any manner for any personalinjury or property damage or a loss of any kind arising from or connected with this inspection.

Date, Sent er 5.

Ip,J)(L Factory Mutual System j

/^'/

j, commissions NS-4175 NC-474 q

National Board, State. Province and No.

Inspectori Signaivre l

e 6

4

_]

b t

y

~,

Rsvision 0

]

l 1

1.0 INTRODUCTION

This report documents the results of the Outage #8 (Refueling-#7)-

Inservice Inspection-of Florida Power Corpolation's Crystal River-Unit 3 nuclear-power plant.

This outage is the first outage in the second 10 year interval.

1 The nondestructive examinations were performed by the B&W Nuclear Service Company (BWNS) personnel from March 19'90 through June 1990, in compliance with the requirements of the 1983 Edition of the ASME Boiler & Pressure Vessel Code with Addenda through the Summer of 1983, and applies.ble NRC Requlatory Guides, and technical specifications for this unit.

Included in this report is a summary of examination results, examination data, evaluation' reports, calibration data,' personnel, material and quipment certifications, and reference document-affecting this outage.

All nondestructive examinations were performed in accordance with t

the' procedures contained in the 1990 Inservice Inspection Manual for Crystal River Unit 3.-

The examination. procedures were approved.

by BWNS-personnel qualified to SNT-TC-1A Level III.

These procedures.

conform to the requirements of the 1983 Edition of the ASME Code, Section XI-with Addenda through Summer 1983, NRC-Regulatory Guides, and owner Technical Specification.

The examinations-were performed'by BWNS technicians qualified to-SNT-TC-1A as required.

The NDE equipment =used was calibrated in accordance with the requirements of ISI-80, " Administrative 1-1 L

l.

1 1

Rsvision 0-4

1.0 INTRODUCTION

Procedure for Preventive Maintenance of NDE Equipment", which is contained-in the 1990 Inservice Inspection Manual for Crystal-River:

Unit 3.

The materials used for the examinations were certified by-the-l'.

manufactures.

In addition to the examination data prepared by BWNS, examination data generated by !'10rida Power Corporation during this outage is '

also included herein.

This data was inserted by FPC after receipt of the report from BWN3.

This report was prepared for Florida Power Corporation by the B&W-

~

Nuclear Service Company-under reference number 583-7472' Task 736.

.The information contained in this report is furnished to the H

~

Florida' Power Corporation solely for its use in conjunction with i

f the workscope performed.

This document has been reviewed for legibility and reproducibility and these are the best copies available as submitted by.the originating organization.

O b

1-2 t

~

Rsvision.0 2.0 EXAMlNATION

SUMMARY

[

The results of the examinations conducted during the 1990 Crystal River Unit 3 Outage #8 are described in detail in the following

(

sections.

The examinations were performed by B&W Nuclear Service Company between March and June 1990.

The examinations performed were as listed in the Crystal River Inservice Inspection Plan prepared by Florida Power Corporation and contained in Section 3 of this report.

The examination data generated by BWNS during this outage for Class 1, 2 and.3 components are' included in Sections 4 through 6 respectively.

Summary tables located in the front of each'section summarizes the examination data.

i The first two columns on the tables identify 1

the component and the identifying figure number for the examination.

'l Component identification uses: specific names in conjunction with the.

following acronyms:

RV Reactor Vessel PZR Pressurizer SG Steam Generator F-W Feed Water E-FW Emergence Feed Water C-F Core Flood D-H Decay Heat M-S Main Steam SFC Spent Fuel Cooling S-W i

Service Water Placement of an "X" in one of the two columns following the examination.l number indicates whether the examination revealed recordable indications.

(Refer to Table 1 for definitions).

2-1 l

i RLvicion 0, l

2.0 EXAMINATION EMMMARY l

4

' The following two columns identify whether an Evaluation Report (ER) was prepared to_ evaluate the indication.

The next two columns indicate if a limited examination was performed.

If an-Evaluation Report was written the ER number will be listed in the next column on the table.

Evaluation reports are included in Section 8 of this report.

The. examine *s who performed the examinations are listed by data base ID numbers.

Certifications for these examiners are included in Section 10.

The examination technique, finel' status of the examinations and miscellaneous notes are included in the last column of the summary table.

The examination data and summary of examinations performed by Florida Power Corporation is included in this report.

I a

I 2-2 1

l

t

-Revision 0 t

2.0 EXAMINATION

SUMMARY

(CONT'DF TABLE 1 EXAMINATION

SUMMARY

DEFINITIONS Listed below are definitions of the terms used by.BWNSLpersonnel in recording and evaluating nondestructive examinations.-

1 1.

INDICATION:

The response or evidence from the application-of a nondestructive examination.

2.

NO RECORDABLE INDICATIONt Lack of response or evidence from the application of a nondestructive examination by comparison to applicable procedure recording criteria.

I 3.

RECORDABLE. INDICATION:

An' indication which.is required to.

4 be sized at the recording level as specified in the applicable' examination procedure.

4.

REPORTABLE = INDICATION:

An indication which. meets or exceeds the reporting criteria of_the' applicable m

examination procedure.

ReportableLindications must-be i

evaluated.using an Evaluation Report by a' Level III certified in the applicable nondestructive-examination technique.

5.

LIMITED EXAMINATION:

An' examination where the total area j/

of interest. required by the applicable examination procedure is not accessible.

q 6.

GEOMETRIC INDICATION:

Response from ultrasonic examination which.is determined to be due to variations in the component's configuration.

2-3 e

iI

Rovision 0 4.0 CLASS 1 EXAMINATION DATA

?

This section contains the class 1 examination data generated by

-B&W Nuclear Service Company during Outage 98 (Refueling #7).

All:

+

examination data is filed in sequential order by Figure number.

A sumnary table is also included in the front of this section.

t e

e 4-1 v

2-.

. ~ -.

o S

s s

E u

u T

i i

O A

d O

I

=

a R

d R

d

/

a a

r e

r e

S e

H e

H 8y U

n e

n e

9y T

n lo n

lo

.E.

A I

bt I

bt T

a a

GA S

e te e

te l

pl l

pl T

L z

ez z

ez U

A z

cz z

cz O

N o

co o

co I

N AN N

AN F

T T

T T

T T~

T T

T U

U U

U U

U U

U U

=

RER 3

ESE NAB T

IBM I

M U

29 1495 95 1495 1495 24 241 24 241 N

AAN 16 4468 68 4468 4468 14 144 14 144 U

XT 25 0755 55 0755 0755 27 270 27 270 z

EAD 67 7373 73 7373 7373 63 637 63 637 DI NT B B.lT A TA BBTA BBTA NB NBB NB NBB RE V

8 7

I TR 3

3

=

R RE 0

0 LOB L.

APM 0

0 A

VEU 9 '

9 T

ERN E

S

(.

Y D

B R

E. 0 A

C T

10 X

X X

X T

IN

=

MAS T

IKE X

X X

L LEY X

X M

N EB D

N C

EO U

I

.TDN X

X X

X X'

X X

S T LRU A AOL 6

R VPCS 0C O EENE I

P RIY X

X T

R A

O S

N C

EN a

I LO R

BI fJP E

ATO X

W DAN X

X X

X X

X X

E O

RC P

OI CDS A

ENE D

RIY X

X IROL A.

A F

.ERR A

0 1

UE 2

1 1

2 1

4 1

1 4

GB IN 3

1 1

1 2

2 2

2 1

FU N

l 2

2 2

2 2

2 2

2 B

B B

B B

B B

B B

DA 1

E P

H R

R R

R R

R R

R

,M V

Z E

Z Z

Z Z

Z Z

OC R

P P

P P

P P

P P

{

r

(

o EXAMINATION SUIGEARY TABLE FLORIDA POWER CORPORATION CRYSTAL EIVER UNIT 3 OUTAGE 98 REFUEL 67 EVAL.

RECORDABLE REPORT

' LIMITED ' EVAL EXAMINER

-FIGURE INDICATIONS INCLUDED EXAM REPORT DATA BASE FINAL STATUS / NOTES COMP.

NUMBER YES NO YES NO.

YES NO NUMBER ID NUMBER PZR B2.5.2 X

X X

T7569 VT A3585 PER B2.8.3 X

X X

90-032 M7115 UT Acceptable S7447 PZR B2.8.4 X

X X

B7041 UT B3744 T7569 A3585 B2.8.5 K

X X

90-033 M7145 UT Acceptable PZR S7447 PZR B2.8.6 X

X X

B7041 UT B3744 PZR B2.8.7 X

X X

90-042 M6212 UT Acceptable i'

S7447 B3744 B2.8.9 x

x X

90-043 M6212 UT Acceptable PZR S7447 3

53794-PZR B2.8.11 X

X X

M6212 UT B3744 t

PZR B2.8.15 X.

X X

90-034 M7145 UT Acceptable S7447 l

PZR B2.11.1 X

X X.

M6212 VT SG B3.1.2.A X

X X

M7145 UT-A3585 PAGE 2.

OF _t t

. ~

M_

fJ

,I i

1 J

l'

,f1 ll j

.r SEP O

t M

t E

/

e e

P S

l 87 l

o U

b b

59 T

a a

A t

t EL T

p p

3 GE AU S

e e

c c

TF L

c c

UE A

A A

E OR N

G I

A

.F P

T r

T T

T T

T T

T T

T T

T r

U V

V V

P P

U P

U P

U U

t RER 3

ESE NAB T

IBM I

M U

24 57 55 5

5 5

24 83 57 97 54 57 54 N

AAN 14 44 48 4

4 4

14 93 44 64 44 44 44 U

XT 27 14 15 1

1 1

27 68 14 54 17 14 17 EA s 63 77 73 7

7 7

63 41 77 77 73 77 73 D1 MB MS MA M

M M

MB SB MS TS MB MS MB REV 8

7 I

TR 2

1 R

RE 0

0 LOB.

L API 0

0 B

A VEU 9

9 T

ERN

&S Y

D J,

R E

O X

X X

X X

X X

X BB C T

N E

IBE EBAS X

X X

Y IXE X

X R

LEY A

'D E

t S

B N

C EO I

I

. TDN X

X X

X X

X X

X X

X X

S T LRU A AOL t

R VPCS tO O EENE X

X I

P RIY T

R A

O S

N C

EN I

. LO M

R BI A

E ATC X

W DAN X

X X

X X

X X

X X

X X

E O

RC P

OI CDS A

ENE X

X D

RIY I

RD IF E

A.

RR 2

5 8

1 2

1 2

3 4

UE 2

5 1

1 1

4. '

4 -

4 1

4 GB 0

0 0

IM 2

2 7

1 1

1 1

1 1

1 1

1 1

FU N

3 3

3 3

3 3

4 4

4 4

4 4

4 B

B B

B B

B B

B B

B B

B B

G G

G G

N N

N N

P I

I I

I M

R R

R P

P P

P O

G G

G G

G G

Z Z

E I

I I

I C

S S

S S

S S

P P

P P

P P

P

EXAMINATION SUBSEUtY TABLE

n FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE.#8 RFFUEL 87.-

EVAL.

RECORDABLE REPORT

' LIMITED EVAL EXAMINER FIGURE INDICATIONS INCLUDED EXAM REPORT DATA BASE FINAL STATUS / NOTES l

COMP.

NUMBER YES NO YES NO YES NO NUMBER ID NUMBER PIPING B4.1.49 X

X X

T7569 PT PIPING B4.1.50 X

X X

T7569 UT ~

A3585 PIPING B4.1.61 X

X

-X T7569 PT S7447 PIPING B4.1.62 X

X X

M7145 UT B3744 PIPING B4.1.63 X

X X

T7569 PT S7447 PIPING B4.1.64 X

X X

M7145 UT A3585 i

PIPINGi B4.1.65 X

X X

T7569 PT S7447

-l PIPING B4.1.66 X

X-X M6212 UT B3744 PIPING B4.1.69 X

X X

T7569 PT S7447 PIPING B4.1.70 X

X

~ X M7145 UT S7447 PIPING B4.1.77 X

X X

T7569 PT S7447 PIPING B4.1.78 X

X X

M7145 UT l~

A3385-PAGE 4

OF. ' t I 2.

.=

.?

3 t

EXAMINATION-SINSEARY TABLE.

.y

~

i

. FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE 98 REFUEL 47

'~

RECORDABLE REPORT

' LIMITED' EVAL EXAMINER

.[

FIGURE-INDICATIONS INCLUDED EXAM REPORT DATA BASE FINAL STATUS / NOTES COMP.

NUMBER YES NO YES NO YES NO NUMBER ID NUMBER PIPING B4.1.79 X

X X

T7569 PT S7447 PIPING B4.1.85 X

X X

M6212 PT B3744

..g PIPING B4.1.86 X

X X

T7569 UT A3585 PIPING B4.5.40 X

X X

M6212 MT B3744 i

PIPING-B4.5.41 X

X X

M6212 MT B3744 PIPING B4.5.132 X

X X

90-035 T7569 UT Acceptable A3585 PIPING B4.5.132 X

X X

T7569 PT S7447 PIPING B4.5.133 X

X

.. X 90-036 T7569 UT Acceptable A3585 PIPING B4.5.133 X

X X

T7569 UT S7447 PIPING B4.5.137 X

X X

90-019 M7145 UT Acceptable S7447 PIPING B4.5.137 X

X X

M7145 PT S7447 PIPING B4.5.138 X-X X

90-021 M7145 UT Acceptable A3585 s

PACR S

OP.

tI-

..-. u.-

o' J

.S -

G~-

I C

l N

/

F S

87 O

U~

95 TA EL T

6 GE S

AU TF L

UE A

E OR N

G I

A F

P T

T T

T T

T T

T T

T T

P P

P P

P P

P P

U P

U RER 3

ESE NAB T

IBM I

M U

57 97 97 97 97 24 24 55 55 24 9 5' N

AAN 44 64 64 64 64 14 14 48 48 14 68 U

KT 14 54 54 54 54 27 27 15 15 27 55 EAD 77 77 77 77 77 63 63 73 73 63 73_

DI TS TS TS TS TS MB MB MA MA MB TA REV I

TR R

RE LOB.

L APM A

VEU T

ERN E

S L

Y D

B R

E O

X A

C T

N X

X X

X X

X X

X X

i T

IM MAS Y

IXE R

LEY A

D N

E D

I O

EO U

I

.TDN X'

X.

X X

X X

X X

X X~

X S

T LRU A AOL N

R VPCS O

O EENE I

P RIY T

R A

O S

N C

EN I

LO M

R BI A

E ATO X

W DAN X

X X

X K

X X

X X

X X

E O

RC P

OI CDS A

ENE D

RIY IRO LF E

8 4

5 6

7 6

7 2

3 0

6 RR 3

4 4

4 4

6 6

7 9

0 UE 1

1 1

1 1

1 1

1 2

1 1

dB IM 5

5 5

5 5

5 5

5 5

5 5

FUN 4

4 4

4 4

4 4

4 4

4 4

B B

B B

B B

B B

B B

B

}

1 G

G G

G G

G G

G G

G G

N N

N N

N N

N N

N N

N P

I I

I I

I I

I I

I I

I M

P P

P P

P P

P P

P P

P O

I I

I I

I I

I I

I I

I C

P P

P P

P P

P P

P P

P

i' p

s EXAMINATION'SUISEARY TABLE FLORIDA POWER CORPORATION.

CRYSTAL RIVER UNIT 3 OUTAGE 88 REFUEL 87 EVAL.

RECORDABLE REPORT

' LIMITED EVAL EXAMINER i

.i FIGURE INDICATIONS INCLUDED EXAM REPORT DATA BASE FINAL STATUS / NOTES i

COMP.

NUMBER YES

!NO YES NO YES NO NUMBER ID NUMBER l

i PIPING B4.5.206 X

X X

M7145 PT S7447 t

PIPING B4.5.216 X

X X

T7569 UT

'l A3585 i

PIPING B4.5.216 X

X X

M7145 MT S7447 PIPING B4.5.228 X

X X

M6212 UT 33744 i

PIPING B4.5.228 X

s.

X T7569 NT S7447 PIPING B4.5.229 X

X X

M6212 UT I

B3744 PIPING B4.5.229 X

X X

T7569 NT i

S7447 PIPING B4.5.233 X

X X

90-045 T7569 UT Accentable A3585 i

PIPING B4.5.233 X

X X

M6212 PT l

B3744 PIPING B4.5.238 X

X X

M7145 UT A3585 PIPING B4.5.238 K

X.

X T7569 NT S7447 i

PIPING B4.5.247 X

X X

M6212 UT.-

l B3744 I

i i

~

PAGE 7

OF' il l

i

. ~. _

'h.

6 SE fD I

N i

~

/

~

r S

O 87 U

98 TA ML T

"U S

S TF L

UE A

OR E

N G

I A

F P

T T

T T

r T

T T

T T

T P

U N

U M

U N

U N

U N

RER 3

ESE NABE T

IBB I

N U

57 55 97 55 97 24 97 24 F7 24 97 N

AAM 44 48 64 48 64 14 64 14 64 14 64 U

ET 14 15 54 15 54 27 54 27 54 27 54 EAD 77 73 77 73 77 63 77 63 77 63 77 DI M5 NA T5 MA TS 88 T5 gB T5 9B TE 8

R 9

p EVI TR R

RE LO B

L AP E*

A VE ER T

ERB MC S

Y D

R E

O T

N K

2 K

K K

K K

K K

K E

I B

MAS 1

IXE 7

LEY S

I t

D e

D N

c EO I

I

.TDN K

K K

K K

K K

K K

K S

T LRU A AOL N

R VPCS O

O EENE I

P RIY T

R A

C S

N C

ESE H

LO R

BI tA m

ATO E

DAN K

K K

K K

K K

K K

K K

t E

O RC P

OI CDS A

ENE D

RIY I

i R

OL F

E 7

5 5

6 6

9 9

0 0

1 1

RR 4

5 5

5 5

5 5

6 6

6 6

UE 2

2 i

3 3

3 3

3 3

3 3

3 GB IM 5

5 5

5 5

5 5

5 5

5 5

FUN 4

4 4

4 4

4 4

4 4

4 4

B B

B B

B B

B B

B B

B 1'

G G

G G

G G

G G

G G

G W

N N

N N

N N

N N

N N

P I

I I

I' I

I I

I I

I I

E P

P P

P P

P P

P P

P P

BO I

I I

I I

I I

I I

I I

s-(

C P

P P

P P

P P

P P

P P

I

ll

Itl, II lJl{;jJLl l

l ll' SETON n

/

r S

87 J

o 98 TA EL T

GE S

s AU TF L

UE A

OR N

as IF ae T

T T

T T

T T

T T

T T

T U

N P

P P

P r

N i

V V

V t

RER 3

ESE NAB T

IBM I

M U

24 97 97 2

24 24 57 83 73 73 77 77 N

AAN 14 64 64 1

14 14 44 93 53 53 95 95 U

XT 27 54 54 2

27 27 14 68 98 98 29 29 EAL 63 77 77 6

63 63 77 41 91 91 49 49 DI MB TS TS M

MB MB NS SB TB TB DT DT REV I

TR R

RE LOB.

L API B A

VEU T

ERN MR SY D

E O

C T

N X

X X

X X

X X

X X

X X

I I D MAS T

IEE X

M

'LEY U

I B

O' D

B C

EO U

I

.TDN X

X X.

X X

X X

X X

X X

X S

T LRU A AOL II R vPCS C

O EENE I

P RIY T

R

,y A

O S

N C

EIB I

LC N

R BI A

E ATO K

W DAF n

X X

X X

X X

K X

X X

X E

O R C lg P

OI CDS A

ENE D

RIY IRO L

9 5

8 0

F E

2 2

1 8

1 2

0 1

4 8

RR 6

6 7

7 9

9 1

1 1

1 UE 3

3 3

3 3

3 3

3 GD 0

0 0

0 IN 5

5 5

5 5

5 6

6 1

1 1

1 FUN 4

4 4

4 4

4 4

4 4

4 4

4 B

B B

B B

B B

B B

B B

B d

G G

G G

G G

G G

i d

T rc N

N N

N N

N N

N i

i R

s u

G O

U P

I I

I I

I I

I I

F F

P ir E

P P

P P

P P

P P

F r

P r

B I

I I

I I

I I

I U

U U

u O

,s C

P P

P P

P P

P P

S S

S s

j

EKANINATION SUJEBRY TABLE FLORIDA POWER CORPORATIOV.

CRYSTAL RIVER UNIT 3 OUTAGE G8

~

REFUEL G7 EVAL.

' LIMITED EVAL EXAMINER IEDICATIONS[ REPORT RECORDABLE INCLUDED EXAN REPORT fC\\TABASE FINAL STATUS / N(FFES f

FIGURE COMP.

NUMBER

'IES NO YES NO YES NO NUISER ID NUBBER SUPPCRT B4.10.188 X

X X

D4297 VT 4

T9957 i

SUPPORT B4.10.191 X

X X

T9957 VT D4297 SUPPORT B4.10.195 X

X X

D4297 VT T9957 j

i Surr0RT B4.10.208 X

X X

T9957 VT R8756 l

l i

SUPPORT B4.10.210 X

X X

T9957 VT i

D4297 6

SUPPORT M4.10.213 X

X i X

D4297 VT T995.

s

)

W I X

D4297 VT l

SUPPO3tr B4.10.220 X

T9957 i

i

~

SUPPORT B4.10.222 X

X X

T9957 VT l

D4297 SUPPORT B4.10.225 X

X X

B1833 VT T9957 SUPPORT B4.10.226 K

X X

T$957 T

D4297 f

BOLTING B6.9.11 X

X X

T7569 VT BOLTING B6.9.12 X

X X

T7569 VT ~

j BOLTING B6.9.13 X

X X

M6212 i VT B3744 l

PMBE 10 Or at

- - _ _ _ _ _ _... = _ _ _ _ _ _ - - _ - - _ _, _. -. _ _ _..

_....--......-... -_. -, ~..-..

S E

Tu 1

o 8

I

/

F S

O 87 U

96 T

EL A

GE T

I AU S

I TF L

UE A

E OR N

G I

A F

P T

T T

r T

V V

V v

V RER 3

ESE NABS T

IBI I

M U

24 2

2 24 24 t2 AAN 14 1

1 14 14 XT 27 2

2 27 27 1

EAD 63 6

6 63 63 8B eB DI 9B N

9 e

s 8

s R

i EVI TR R

RE LOB L

AP E B

A vet T

ERN E

S L

Y D

B R

E O

A C

T N

X X

X X

X T

IN I

MAS Y

IKE W

LEY k

E

~

0 O

D R

C EO L

I

.TLN X

X X

X X

S T LRU 41j A AOL

+

N E VPCS t

O O EENE I

P RIY T

ti A

O S

N C

E8l I

LC M

R BI A

E ATO X

W DAN X

X X

X X

E O

RC P

OI CDS A

ENE D

RIY I,

l tEOLF ERR 4

3 4

3 6

UE 1

2 2

2 2

O GB 9

4 IM 9

9 9

9 9

FUN 6

6 6

e 6

B B

B m

8 i

G G'

G o

G.

N N

Nr n N

I I

I I

P T

T T

u T,

R L

L L

L O

O O

O O

O C

B B

B B

B

/

R';visicn 0 s

i

+

5.0 EL&,L1 1 EXAMINATION QbfA

[

i This section contains the class 2 examination data generated by l

f B&W Nuclear Service Company during Outage 68 (Refueling 67).

All 1

examination data is filed in sequential order by Figure number.

A summary table is also included in the front of this section.

b e

f J

a l

i 5-1

\\.,

,,,-..r-

l' l

if;!

'if

l l!t!i iI
!;}

r' l

S E

TO 0

SI 1

/

e r

S e

l o

87 U

l b

93 T

b a

A a

t EL GE T

t p

I AU S

p e

e c

TF L

c c

UE A

c A

E OR N

A G

I A

F P

T T

T T

T T

T r

T T

T T

U U

U P

U P

U M

U P

U P

RER 3

ESE NAS T

IBI I

N U

97 24 24 57 24 24 55 95 55 95 95 83 N

AAN 64 14 14 44 14 14 48 68 48 68 68 93 U

KT 54 27 27 14 27 27 15 55 15 55 55 68 EAD 77 63 63 77 63 63 73 73 73 73 73 41 DI TS MB MB MS MB MB MA TA MA TA TA SB REV I

TR 9

7 R

RE 2

0

- LOB 0

0 L

APM A

VEU 0

0 T

ERN 9

9 E

S L

Y D

B R

E O

A C

T N

K K

K K

K X

T IN MAS Y

IKE X

K~

K K

K K

R LEY A

S N

D I

B O

EO TDN K

K K

K K

K K

X U

I S

T LRU A AOL f

R VPCS OC O EENE X

K K

K I

P RIY T

R A

O S

N C

EN I

LO N

R BI A

E ATO K

X K

W DAN K

K K

K K

K E

O RC P

OI CDS A

ENE X

K K

K D

RIY I

R O

L 7

E 4

4 8

8 0

0 2

2 RR A

A A

0 0

0 0

1 1

1 1

7 8

3 1

1 1

1 1

1 1

1 UE 3

GB IM 1

1 1

1 1

1 1

1 2

1 1

1 FUN 1

1 1

1 2

2 2

2 2

2 2

2 C

C C

C C

C C

C C

C C

C R

R R

G G

G G

G G

G G

E E

E N

N N

N N

N N

N P

L L

L I

I I

I I

I I

I M

HO HO HO HP HP SP SP SP SP SP SP O

G O

O O

I I

I

- I I

I I

I C

S DC DC DC DP DP MP MP MP MI MP MP c

~

l

,!2

.j!

i

)

j l;i i

EXAMINATICII SUf9EARY TABLE FIDRIDA POWER CORPORATION CRYSTAL RIVER ' UNIT 3 OUTAGE 98 REFUEL 67 RECORDABLE REPORT LIMITED' EVAL ^

EXAMIL'ER FIGURE INDICATIOttS INCLUDED EXAM REPORT LATA BASE FINAL STATUS / IgGTES i

l NUMBER YES NO YES NO YES NO NUMBER ID NUI3ER COMP.

K l 90-010 M6212 UT Acceptable j

M-S C2.1.115 K

K PIPING B3744 i

I i

M-S C2.1.115 K

K K

'90-008 M6212 NT Acceptable l

l PIPING 90-011 B3744 j

i l

M-S C2.1.116 K

K X

90-014 M6212 UT Acceptable PIPING B3744 1

i M-S C2.1.116 K

x X

M6212 MT B3744 i

PIPING M-S C2.1.121 K

K K

90-006 T7145 UT Acceptable A3585 l

PIPING T7569 i

I K2915 M-S C2.1.121 K

K K

T7569 NT i

A3585

[

PIPING i

F-W C2.1.123 K

K K

M6212 Nr i

B3744 l

PIPING

'g i

F-W C2.1.127 K

K K

M6212 MT B3744 PIPING I

F-W C2.1.132 K

K K

M6212 NT l

S7447 PIPING F-W C2.1.133 K

K K

M6212 NT S7447 i

,1 PIPING F-W C2.1.138 K

K K

90-009 MC212 MT Acceptable B3744 PIPING I

f PAGE 2.

Or 10 v

og

.g A--

~--.

4

iaAy,

-g.m

+n m

+y,

.g

-e.

~

mea

,--a g.---.g-.

wr.

.me,,

w gg.

pe.ws-,-W r

i i(Itf!ll t!.!

li l

,l i

l SE T

O o

t N

/

F e

e O

S l

87 U

b lb 99 T

a a

A t

t 3

E. L T

p p

GE S

e e

AU c

c TF L

c c

E UE A

A A

G OR N

A I

P F

r T

r r

T r

r T

T T

T M

M N

N N

N N

P P

P P

RER 3

ESE T

NAS I3I I

N U

578 27 24 24 24 57 97 94 57 975 97 N

AAN 449 14 14 14 14 44 64 64 44 648 64 U

KT 146 24 27 27 27 14 54 57 14 545 54 EAD 774 67 63 63 63 77 77 73 77 773 77 DI MSS M5 MB MB MB MS TS TB MS TSA "5

REV 5

I TR 6

0 R

RE 1

0

. LOB.

0 L

APM 0

A VEU 0

9 T

ERN 9

E S

L Y

D B

R E

O C

X X

X X

X X

X X

X A

C T

N X

1 7

IN MAS m

IKE LEY N

D O

EO U

I

.TDN X

X X

X X

X X

X X

e T

T LRU A AOL t

R VPCS I

Q O EENE X

I P

RIY T

R A

O S

N C

EN I

LO M

R BI A

E ATO K

W DAN X

X X

K X

X X

X X

E O

RC P

OI CDS X

A ENE X

D RIY IR O

LF E

0 2

8 9

5 9

0 4

5 7

1 RR 4

4 4

4 5

5 6

6 6

6 7

1 1

1 1

1 1

UE 1

1 1

1 1

GB 1

1 1

1 1

1 1

1 1

1 IM 1

FU N

2 2

2 2

2 2

2 2

2 2

2 C

C C

C C

C C

C C'

C C

G G

G G

G G

G G

G G

G N

N N

N N

N N

N N

N N

P I

I I

I I

I I

I I

I I

M WP WP WP WP WP WP WP HP HP HP HP

.O I

I I

I I

- I I

- I

- I I

I C

FP FP FP FP FP FP FP DP DP DP DP

,lf ji j4 l

!i-i'

?

EIANINATIOtt SUISEARY TABLE i

i FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUT.WE GS REFLEL 97 EVAL.

RECORDABLE REP &tT

' LIMITED EVAL EIANINER 3

't FIGURE INDICATIONS INCLUDED EEAIE REPORT DATA BASE FINAL STATUS / IstyRES COMP.

NUMBER YES NO YES NO. YES NO NUMBER ID NUISER f

D-H C2.1.173 K

K K

M7145 PT l

A3585 PIPING l

PT D-H C2.1.179 K

I K

M6212 1

B3744 PIPING i

TwH C2.1.180 K

K K

M7145 PT 1

A3585 PIPING D-H C2.1.184 K

K K

M6212 PT l

B3744 PIPING i

D-H C2.1.188 K

K K

T7569 PT S7447 1

PIPING D-H C2.1.193 K

K K

M6212 PT F3744 PIPING l

D-H C2.1.195 K

X X

M6212 PT B3744 l

PIPING f

~

M-U C2.1.199 K

K K

T7569 PT PIPING B3744 l

i M-U C2.1.200 K

K K

T7569 PT M3744 PIPING M-U C2.1.205 K

K K

M7145 PT I

S7447 I

PIPING i

M-U C2.1.207 K

K K

M7145 PT A3585 PIPING l

M-U C2.1.208

,K K

K T7569 PT j

S7447 i

PIPING l

i PAGE

+

Or 10

\\

1,!

[

f 1

' i i

!ll j

!l! > j

,{t

,u i

S E

r a

o e

t l

/

r.

S e

o 87 l

U b

86 T

a A

EL T

p t

5 GE AU S

e TF L

c UE c

E A

OR A

G N

I A

F P

T T

r T

T T

T T

T T

T T

P U

N U

P P

F P

P

_P P

P I

RER 3

ESE NAB T

IBM I

M U

57 24 24 55 52 52 52 52 2

2 5

5 AAN 44 14 14 48 41 41 41 41 1

1 4

4 t

l U

XT 14 27 27 15 12 12 12 12 2

2 1

1 EAD 77 63 63 73 76 76 76 76 6

6 7

7 DI MS MB MB MA MM MM MM MM M

M M

M REV I

TR 3

R RE 1

L LOB.

0 APM A

VEU 0

T ERN 9

E S

L Y

D B

R E

O A

C T

N X

X K

X X

X X

X X

X X

T IM EBAS Y

IXE K

R LEY A

E t

G I

D D

C EO U

I

.TDN X

K K

X X

X X

X X

K X

S T LRU A AOL t

R VPCS t

O O EENE X

I P

RIY T

R A

O S

N C

Et I

I LC M

R BI X

X K

K A

E ATO K

W DAN K

K K

X K

X X

E O

RC l

P OI CDS A

ENE X

D RIY I

RD I

F E

1 1

1 3

RR 1

8 8

3 6

7 2

3 4

5 6

7 UE 2

2 2

7 3

3 4

5 5

6 6

4 GB 1

2 2

2 2

2 2

2 IM 1

1 1

2 FUN 2

2 2

2 2

2 2

2 2

2 2

2 C

C C

C C

C C

C C

C C

C G

G G

G G

G G

G G

G G

G N

N N

N N

N N

N N

N N

N P

I I

I I

I I

I I

I I

I I

M HP SP SP FP HP HP HP HP HP HP HP HP I

I I

I I

- I I

I I

I I

- I C

DP MP MP CP DP DP DP DP DP DP DP DP O

f l

i l

l!

l d

(

EIANINATICIt St2WEMtY MLE 1

FLORIDA poler CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE 98 REFUEL G7

~

EVAL.

l RECORDABLE REPORT

' LIMITED EVAL EEANINER

{

FIGYJRE INDICATIcetS INCLUDED EIAN REPORT DATA BASE FINAL STATUS / IOUTES i

l COMP.

NUMBER YES

'NO YES NO YES NO NUMBER ID NUISER

(

l D-H C2.2.77 K

K K

M6212 PT i

l PIPING B3744 l

l M-S C2.3.8 K

K K

T7569 Mr

[

i PIPING A3585 i

M-S C2.3.9 K

K K

M6212 MT f

I PIPING M-S C2.5.1 K

K K

T9957 VT t

f HANGER D4297 M-S C2.6.1 K

K K

T9957 VT HANGER D4297 I

1 i

M-S C2.6.10 K

K K

S4698 VT HANGER B1833 l

4 i

M-S C2.6.12 x

X X

90-01~

T9957 VT

, Acceptable HANGER D4297 l

74-S C2.6.93 K

K K

T9957 VT HANGER D4297 1

D-H C2.6.121 K

K K

T9957 VT l

HANGER D4297 I

t L

j D-H C2.6.123 K

K K

T7569 VT l

l HANGER 57447

}

D-H C2 6.134 K

K K

S4698 VT HANGER B1833 4

i D-H C2.0.l';7 K

K K

S4698 VT i.

HANGER B1833 i

t i

PAGE 4

OF eo

l i!

i[

J!

tl i

ll i[

f.

i l

S E

T O

0 1

N

/

F O

S e

87 U

l G9 T

b A

a EL T

t

~7 GE S

p AU e

TF L

c E

UE A

c G

OR N

A I

A F

P T

T T

T T

T T

T T

T T

T V

V V

V V

V V

V V

V V

V RER 3

ESE NAB T

IBM I

N U

77 77 77 77 77 73 77 73 77 95 77 83 N

AAN 59 59

i. 9 59 95 53 59 53 59 68 59 93 U

KT 92 92 92 92 29 98 92 98 92 55 92 68 EAD 94 94 94 94 49 91 94 91 94 73 94 41 DI TD TD TD TD DT TB TD TB TD TA 1D SB R

~

E VI TR 0

R RE 3

log 0

l L

AP I

A VEU 0

T ERM 9

E S

L Y

D B

R E

O A

C T

N X

X X

X K

K K

X X

K X

X T

IN MAS T

IKE RL LEY US N

D N

O EO I

I

.TDN X

K X

K K

K K

K K

X X

S T LRU A AOL J,

R VPCS

~

O O EENE X

I P

RIY T

R A

O S

N C

EN I

LO N

R BI A

E ATO K

W DAN X

K K

K K

K K

K K

X X

E O

RC

,J~

P OI CDS A

ENE K

D RIY IR O

LF E

9 0

0 4

7 1

4 1

3 7

4 5

RR 7

9 0

0 3

4 4

6 6

8 9

9 2

2 2

2 2

2 2

2 2

2 UE 1

1 GB IM 6

6 6

6 6

6 6

6 6

6 6

6 FU N

2 2

2 2

2 2

2 2

2 2

2 2

C C

C C

C C

C C

C C

C C

R R

R R

R R

R R

R R

R R

E E

E E

E E

E E

E E

E E

P G

G G

G G

G G

WG WG WG G

G M

SN SN SN SN SN SN SN EN FN FN HN HN O

A A

A A

A A

- A A

A A

A

- A C

MH MH MH MH MH MH MH EH EH EH DH DH

?

i ll 4

i

i jd

j

.i:!

.;i

!I t

.l

[

,I!

i!

!t j!;llll,.

!jii irI

~

5 s

0 g

47 r

y 6

t 2

0 N

0 1

/

o e

e Ns e

F S

l l

s l O

87 U

b b

t e b 98 T

a a

sr a

A t

t eg uo t

EL T

p p

qr p

S GE AU S

e ep e

c R

c M;

TF L

c n

ki c

UE A

r A

E A

OR N

os G

Wi I

A F

P T

T r

T T

T T

T T

T T

V V

v V

V V

V V

V V

V RER 3

ESE NAS T

IBI B

U 77 83 77 83 83 837 83 772 77 77 77 I

E N

AAN 59 93 59 93 93 939 93 591 59 59 59 U

ET 92 69 92 68 68 682 68 922 92 92 92 EAD 94 41 94 41 41 414 41 946 94 94 94 DI TD SB 1D SB SB 5BD SB 1DN 1D TD 1D REV I

TR 6

5 6

7 R

RE 4

2 2

4

.LOS.

0 0

0 0

L AP I

A VEU 0

0 0

0 T

ERN 9

9 9

9 A

S Y

KR D

E O

h C

T N

K K

K K

K K

K K

K K

K T

I t B

NAS T

JEE E

IEY N

G N

E D

N O

EO I

.TD K

K K

K K

K K

T L R U.N IS A A MR VR GS cEE sE K

K K

K s

I e

RiY T s A

o S

N c

EN I

LO l

R BI l

A E

ATO E

w DAN K

K K

K K

K 1

E o

RC P

OI CDS n

ENE K

K K

K D

RIY IR O

LF E

8 2

5 7

1 5

5 7

9 0

1 RR 9

0 0

0 1

1 2

2 2

3 3

UE 2

3 3

3 3

3 3

3 3

3 3

GB IM 6

6 6

6 6

6 6

6 6

6 6

FUN 2

2 2

2 2

2 2

2 2

2 2

C C

C C

C C

C C

C C

C R

R R

R R

R R

R R

R R

E E

E E

E E

E E

E E

E P

G G

G G

G G

G G

G G

G M

HN RN HN HN HN HN HN HN HN HN HN A

A A

- A A

A A

A A

A A

O DH DH DH DH DH DH DH DH DH DH DH C

~

r l:

lI

!i

l1 l

4[l' li

,l

.li.

i' l[!

,i.;!

l-.

lfljjl ll\\

!1'\\1il E

T O

O N

/

e e

e F

S l

l l

0 U

b b

b 87 T

a a

a G#

A t

t t

EL T

p p

p i

GE S

e e

e AU c

c c

TF L

c c

c UE A

A A

A E

OR N

G I

A F

P i

T T

T T

T T

T T

T T

T V

V V

V V

V V

V V

V V

RER 3

ESE NAB T

IBM I

N U

95 77 83 83 77 7729 97 77 77 77 97 N

AAN 68 59 93 93 59 5916 64 59 59 59 64 U

ET 55 92 68 68 92 9225 54 92 92 92 54 EAD 73 94 41 41 94 9467 77 94 94 94 77 DI TA TD SB SB 1D 1DMT TS TD 1D TD TS R

E 1

V 1

I TR 6

9 R

RE 2

3 4

LOB 0

0 0

L APM A

VEU 0

0 0

T ERN 9

9 9

E S

L Y

D B

R E

O A

C T

N K

K X

K K

K X

K K

K X

T IN MAS Y

IXE W

LEY E

I D

S I

I I

.TDN K

K X

K K

K K

K N

C EO S

TLRU A AOL W

R VPCS O EENE K

K K

I P

RIY t

T I

A O

S N

C EN I

LO N

R BI K

W DAN K

K K

K K

K K

K A

E ATO E

O RC P

OI A

ENE K

K K

CDS D

RIY IR O

6 LF E

5 7

8 0

2 4

6 8

0

(

RR 3

3 3

4 4

4 4

4 5

5 6

IM 6

6.

3 3

3 3

3 3

3 3

3 UE 3

3 6

6 6

6 6

6 6

6 6

GB N

2 2

2 2

2 2

2 2

2 2

2 FU C

C C

C C

C C

C C

C C

l R

R R

R R

R R

R R

R l

E E

E E

E E

E E

E E

E P

G G

G G

G G

G G

G G

G M

HN HN HN HN UN UN UN UN UN UN UN

.O A

A A

A A

A A

- A A

A A

C DH DH DH DH MH MH MH MH M:

MH MH 4

l l14,~1' d

,l!I

!l' ll I,!llllllll lllll

!(

ltl

i',

li

[

,: f

  • i e

t[i t[,!

?lL!i.

i!

l SE T

o O

t N

/

F e

e O

S l

S7 U

l G8 b

b T

a a

0 A

t EL T

p p

t 1

GE AU S

e e

c c

TF L

c c

E UE A

A OR N

A G

I A

F P

T T

T T

T T

T T

V V

V V

V V

V V

RER 3

ESE NAS T

IBI I

N U

77 97 7723 83 57 57 57 77 N

AAN 59 64 5916 93 44 44 44 59 U

KT 92 54 9225 68 14 14 14 92 EAD 94 77 9467 41 77 77 77 94 DI TD T5 TDMT SB MS MS MS TD REV I

TR 0

5 R

RE 4

1 LOB 0

0 L

APM*

A VEU 0

0 T

ERN 9

9 E

S L

Y D

B R E

O B C T

N K

K K

K K

X K

X T

IN l

MAS Y

IXE E

LEY SS N

D I

O EO U

I

.TDN K

K K

X K

X S

T LRU A AOL N

R VPCS O

O EENE K

K I

P RIY T

R A

O S

N C

EN I

LO N

R BI A

E ATO K

W DAN K

K K

X K

X E

O RC P

OI CDS A

ENE K

K D

RIY I

RO L

F E

3 4

7 0

5 1

7 2

RR 7

7 7

8 8

9 0

3 4

UE 3

3 3

3 3

3 4

GB IM 6

6 6

6 6

6 6

6 FUN 2

2 2

2 2

2 2

2 C

C C

C C

C C

C R

R R

R R

R R

R E

E E

E E

E E

E P

G G

G G

G G

G G

M UN UN UN UN WN WN WN UN O

A A

- A A

A A

A A

C MH MH MH MH FH FH FH MH

,!4 l

!ili ii

l4lil

t 6

R3visien 0 6.0 class 1 F.XAMINATION DMA t

This section contains the class 3 examination data generated by B&W Nuclear Service company during Outage 48 (Refueling #7).

All examination data is fi2*d in sequential order by Tigure number.

A summary table is also included in the front of this section.

6 e

i i

b e

6-1

~

1

\\

l

1 i

i t

~

EXAMINATION SUpWEARY TABLE j

i FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE #8 REFUEL 67 EVAL.

RECORDABLE REPORT

' LIMITED EVAL EIANINER FIGURE INDICATIONS INCLUDED EXAN REPORT DATA BASE FINAL STATUS / NOTCS l

COMP.

NUMBER YES NO YES NO YES NO NUBBER ID NUBSER i

/

S M98 VT D-H D1.1.2 X

X X

B1833 l

HANGER 1

S-W l D1.1.12 X

X X

S4698 VT B1833 HANGER S-W D1.1.25 X

X X

S4698 VT i

B1833 1

HANGER S-W D1.1.46 K

X X

S4698 VT B1833 HANGER D-H D1.1.2 X

X X

S4698 VT B1833 l

HANGER 1

S-W D1.1.12 X

X X

S4698 VT D1833 l

i HANGER 4

S-w D1.1.25 K

X X

S4698 VT B1833 HANGER

~

5-W D1.1.46 X

X X

S4698 VT HANGER B1833 i

S-W D1.1.61 X

X X

S4698 VT HANGER B1833

}

f l

S-W D1.1.65 K

X X

S4698 VT HANGER B1833 S-W D1.1.82 X

3 -

X T9957 VT i

j EIANGER D4297 j

S-W D1.1.89 K

X X

90-002 T7569 VT Acceptable HANGER S4698 PAGE I

OF i

kn, EXAMINATZON SUNNARY TABLE FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE G8 l

REFUEL G7

'l EVAL.

RECORDABLE REPORT

' LIMITED EVAL EKANINER l

FIGURE INDICATIONS INCLUDED EXAN REPORT DATA BASE FINAL STATUS / NOTES COMP.

NUMBER YES NO YES NO YES NO NUBBER TD NUISER S-W D1.1.103 K

K X

D4297 VT i

HANGER T7569 i

S-W D1.1.121 X

X X

T7569 VT

.l

~'

l HANGER A3585 l

S-W D1.1.128 K

K K

S4698

-VT HANGER B1833 I.

S-W D1.1.141 K

K K

90-022 S4698 VT Acceptable HANGER B1833 T7569 i

S-W D1.1.159 K

K K

S4698 VT l

HANGER B1833 l

1 S-W D1.1.172 K

K K

90-031 T9957 VT Acceptable i

HANGER B1833 M6212 t

S-W D1.1.174 X

X X

S4698 VT I

HANGER B1833 l

S-W D1.1.177 K

K K

T9957 VT l

l HANGER D4297 i

S-W D1.1.200 K

K K

S4698 VT HANGER B1833 i

l S-W D1.1.204 K

K K

D4297 VT.

l 1

HANGER T7569 S-W D1.1.218 K

K K

D4297 VT HANGER T7569 i

PAGE 2.

or 5

ii

. - - - -, -. = -

r:

l ltl

!!l

,ll

[!:

lf j,

l!

j ii f l,

SE F

7 S

N

/

F S

O -

S7 U

G9 T

A EL T

3 GE S

AU TF L

UE A

E OR N

._ G A

IF P

c T

T T

T T

T T

T T

T T

T V

V V

V V

V V

V V

V V

V I

RER 3

ESE NAB T

IBB I

M U

79 97 83 98 97 98 79 79 79 63 98 5

N AAN 96 69 93 69 69 69 96 96 96 93 69 4

U XT 25 52 68 56 52 56 25 25 25 68 56 1

EAD 47 74 41 74 74 74 47 47 47 41 74 7

DI DT TD SB TS TD TS DT DT DT SB TS M

RE V

I TR R

RE LOB L

APM A

VEU T

ERN E

S L

Y D

B R

E O

A C

T N

X X

K K

K K

K K

K K

K X

T IM MAS Y

IXE R

LEY A

E N

D G

B O

EO TDN K

K K

K K

K K

K K

K K

X U

I S

T LRU A AOL N

R VPCS O

O EENE I

P RIY T

R A

O S

N C

EN I

LO M

R BI A

E AT0 X

W DA4 K

K K

K K

K K

K K

K K

X E

O RC*

P OI A

ENC CD D

RI2 I

R OLF E

1 1

3 5

8 3

5 7

3 6

6 4

RR 3

4 5

6 6

8 9

0 2

3 4

5 2

2 3

3 UE 2

2 2

2 2

3 3

3 IM 1

1 1

1 1

1 1

1 1

1 1

GB 1

FUN 1

1 1

1 1

1 1

1 1

1 1

1 D

D D

D D

D D

D D

D D

D R

R R

R R

R R

R R

R R

R E

E E

E E

E E

E E

E E

E P

G G

G G

G G

G G

G G

G G

M WN WN WN WN WN WN wN wN wN WN NN CN

- A A

- A A

A

- A A

A A

A A

FA C

SH SH SH RH RH RH RH RH RH RH RH SH O

4 l

l i

!I ii'

,\\l' l

?':

j llj

[l

.[ii I

{

< l.:!r i

l

,l.!l;:l!l;

~

5 S

76 E

7 T

6 O

2 s

S 0

I

/

o r

e Ns S

e l

s o

~

87 U

l b

te 9G sr T

b a

eg A

a t

uo 4

EL T

p qr 6

GE S

e ep AU c

R TF L

c c

ki E

n UE A

c A

r OR N

A os o

I Wi A

F e

T.

T T

T T

T T

T T

T T

V V

V V

V V

V V

V V

V RER 3

ESE NAB T

IBB I

E U

2529 83 83 83 987 83 83 83 5

83 83 AAI 1816 93 93 93 695 93 93 93 4

93 93 I

I S

U MT 2525 68 69 68 569 68 68 68 1

68 68 I

EAD 6367 41 41 41 749 41 41 41 7

41 41 DI 8A0T SB SB SB TST SB SB S8 M

SB SB 9

9 RE V

4 1

I TR 3

R RE 0

0 2

LOB- 0 0

0 L

AP N 0

0 0

A VE R T

ERI 9

9 9

E S

L Y

D B

R E

O A

C T

N K

K K

K K

K K

K K

K K

T I8 5

MAS Y

IIE R

LEY A

E t

D S

I B

C EO U

I

.TDN K

K K

K K

K, K

K S

TLRU A AOL t

t t

5 VPCS O

O EENE K

K K

I P

RIY T

R A

O s

N C

Et

~

I I

LC M

R BI A

E AT0 K

K K

K K

K K

K X

W DA03 E

O RC P

OI L

CDS A

ENE K

K K

D RIY I

R O

LF E

0 6

4 7

5 8

5 8

7 6

8 RR 7

9 0

0 2

3 5

5 7

9 9

4 UE 3

3 4

4 4

4 4

4 4

4 GB 1

1 1

1 IM 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 FU D

D D

D D

D D

D D

D D

N

]'

R R

R R

.R R

R

. R R

R R

E E

E E

E E

E E

E E

E P

G G

G G

G G

G G

G G

G M

SN WN WN WN WN WN WN Mc WN HN HN a

- A A

A A

A A

- A A

A

- A A

C NH SH SH SH SH SH SH SH SH DH DH O

li'.Ilj' k

5l4

' j

.,j :',

.i.1 i,i

EXANINATION SUBGEARY TABLE FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OUTAGE 98 REFUEL 97 EVAL.

RECORDABLE

' REPORT

' LIMITED' EVAL EXAMINER t

FIGURE INDICATIONS INCLUDED EXAM REPORT DATA BASE FINAL STATUS / NOTES CONP.

NUMBER YES NO YES NO YES NO NUIBER ID NUISER S-W i D1.1.528 K

X 70

?

S4698 VT HANGER B1833 I

S-W D1.1.531 x

K LK S4698 VT

[

HANGER B1833 l

SFC D1.1.539 x

K K

T7569 VT HANGER A3585 i

+

i S7C D1.1.540 K

K K

T7569 VT HANGER A3585 l

D-H D1.1.564 x

X X

S4698 VT l

HANGER B1833

?

1 S-W D1.1.582 K

K K

90-023 S4698 VT Acceptable j'

HANGER B1833 S-W D1.1.592 K

K K

T7569 VT HANGER D4297 SFC Di.1.598 K

K K

90-01$

S4698 VT Acceptable B1833 j

HANGER SFC D1.1.606.

K K

X S4698 VT l

HANGER 81833 i

I i

j

- i i

i l

i i

(

j PAGE 5

OF _ 5 i

y-as' p,*

y-e+

v

'g g-A g.

-1ere-Mr wmp-

.7 me-W-

+

-W

-e e - de v'

ssum--=

4R9w v

~-v5&

--mrec'==

.*-Tw

--Mwmeu*u-'e~w----F

......_:...)..

......u..

e.

r t-2i 1

..,i N

NIS.2 OWNER'S REPORT OF REPAIR OR REPLACEMENT I

.6S REQUIRED BY THE PROVISIONS OF

]

ASME CODE SECTION XI so *.. <

  • If additional space l' necessary, Use Supplemental NIS 2 f[.[O$[

s oart

. ownsa Florida Power Corporation

  • - P. O. Box 14042

/

/

  • I*

St. Petersburg, FL 33733-4042 9/72/f[

'.I mar

} Crystal River Unit 3 8'

< FC 0. Box 1240 Crystal River, FL 32629 1240 Page / of. 4!

n,on..v g...

ni.

oji.a aarg e.

v..uo...

ec.

new w M se der khts More.sr ~ /0SZ47NASTW 8-

'~

acoasse

g ns.s, vzw

. curu La.n

.szm-izy o scannricanoa or erstuu MDxM 7en?

Amoeu consraucto= caos somon mootmoa, coes casse Saar Snee) 19 appie:asu somon or seenom m uriuzco com asemas on nswewis acosmoa, coot casse

/ 72.5 60/7soAJ Gmewict /99.3 )Dort/CA,

4.

Identification of Components Repaired or Replaced and Replacement Components NAMEOF NAMEOF MANUP ACTUREA'll NAftoNAL oTHER TEAR REPMRED. REPLAct0 Y d **

Comm.M NENT MANUFACTURER SER4AL NUM8tF.

90. No.

IDENTIFICATloN SulLT on REPLACE 0 m } mo SwW f~WV* lyu/

dW )$)-

'/Jtf CeA M

& /7.9* LlC X N/A A>9*-

M/A b/44lc6D f

.;5diC M *C AMad G G - 0 7 - //= 0 f,

  • dE/44 C/* /UA76A/.Alf
  • Ad r tALCintSt/7 A4A75 (ces y Amex /g b )

e M2 4 /.s 7 of l

.n:u,.

..n. - o,.+,- -. i= m

. -o fa.. M 4 - MS B3/. 7, /99 swr /os/, se Jposs/D 4, ijo (ciy ci;gg l

&>'sn - /./SAS 83/. /,i9 4 7rwnos),so drossim M QorGu

1 i

0

=Sa wwe.m 88 WA!.

Nis.2 CONTINUATION Pagc 2.

0 4.

Remove eEsdn ka sw?na ekeek w hic repla ce

&4L Ot9CarfeONOf woma a

a

,o ikb ckul Insfacil M L es e-5 NellCv hw ers l

I*

a e

a passevne esses rsw.

,[Hydrostat6c 0 Pneumat6c 0 Nominal Operating Pressure O Other

/f7f pel ya

  • p L

- es

, _,.m Sec.

cttfxcked " Nl( oS %4ccIal b MAR 68-o 7. ll- 02.

9.

)

CERTIFICATE OF COMPLIANCE l

We certify that the statements made in this report are correct and this O Repair Replacement conforms to Sect 6on XI of the AspE Code.

a {

.. e. hA6L 22 WMw.4usr

&/sr/

,1990

....C..,..

I

/

l l

I 1

CERTIFICATE OF INSPECTION j

l I, the undersigned, holding a vslid commission issued by the National Board of Bolier and Pressufe Vessel North Carolina inspectors and the State of Province of Arkwright In:;urance employed by No W, Mass have inspected the January 10. 1988 to f

components described in this owner's Report during the period f

_, and state that to the best of my knowledge and belief, the Owner has performed examinations and Iaken corrective measures described in this owners Report l

In accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes acy warranty, expressed or i

implied, concoming the examinations and corrective measures described in this owners Report. Fur-thermore, neither the inspector not his employer shall be liable in any manner for any personal injury

/,yop'py damageAs,a loss of any kind arising from or connected with this ins OP NB4175 NC474

// pK2 CCWMtSSCNs NatCN AL 90ARD, $f A1(, Ph0VINC( OR (h0045(W(Ntsi INSPECTOR S 3.sNatumi 06-28-90 9

Datt J

L

..e,..n

... -.. ~.

.,.7 y

.\\

I, <)

9ag a c-r[

y p

+g g

c l

l r8 0,8 g-

.W [ @

sa lel g[

{$

d$

e:

0%

r p i

w.

e r C#

S

,R O

26 eq E,f d

$2 I Il l

l g g 8

L r

r L

i p j

4 4

i;'r Y

E i

I h$

i "8

.g

.g g

8 i

G

.~l 6

,8 k

t i

i 3

g; g;..i.....g.......

1 0

k f

j [

fj i *1ljlgikl

, Ah(4p i

s b g

L l9

?s?)liti i!$blf lP}

89 aM

  • u! I!$!I!.nh ij I

k nc n p189 ri9agpg a6 g

si 1,

sfHis Helagh li h !

oy l [! vs yl>

e o

e o

eb I! '

i N

.t

?

ElE

i

'I g

T y

rd 90 l

rf l

d'g d

ps 8

kh i

?lg A

q'l l ll I

9 # b it 1

.t li i q,!

i'iii n 4 a

o o

a.-

O 4

e l

d i

,~

w

&e $

f d

llill

(

l T!hI.i i

d I

(

d

! i

&J)e i!

1 e
  • l ll T'

a!

/

ll i

J I

  • - 1 i'

1 7

a a

5 i l, a

e W

W s

l=

W I

W l

f

,{

l >P l

N a

j l'

n T

.I,l.

s md 3s af s

L d 2

1e Is g

W

' 3 e l

g f il d{ !d~ j j! j f?

N o

~

s u

}*,), !;fh1

'J. # @.

W

}$

IO ti 2

i O

E 5

j T ii lV, h :

i l$$$$ N@I N N

o i

f d;

f/)

Q c

t QJ d

!li h

l I!,

N r

g}s Ii i

l l

g 3,

n jt o$l ap hh m

(y q

M I

ei g,

O O E 06%

3 2 5 I.

5, ;a !

p ;f F

'h g g a

p g

5 9 m;

Ft

@ w&

M

[.

-t

's y

8 !

b, R l ef 6R

{)E O E" g,e'

-l s

a f

i i

i e

er

[ l n;

o

,d Jj s

i 8l z:

1' 1

.1 r

,.l=6'i l

,a

,4 i

6 a

a

=

2 t

3 s

E a

'e

! ;e 4

i t

i 2

0 i

W

,8 W

al i

4 l-3T

'.g.

4 l

l i

J 4

L 1

d g

1 l

if O

h i

g

.a

d Xg i

d W

4 j.

5 i

4 g

g

(

.A

'i i

Ex 2

l i.

E

' t It

[

,Y

'Q j

h l[gI lI 0

o

,4 7 e!>

s t ai llh0s'k3 l3 il d p o j k!" $[.Psy;rsygs 6 If g

d f

i 38 i!gs%gw#1$$$$ $$ $y $$

i t

r u l?

o $soIdhza27;leag40 1

s os e

1 za 2

i l

(

@ j ili i I

L 3

Ih

/

r i1 1

1 i

j

(

I j

5 1[

/t

' +

uo 9

9 g

k

%N l

6 L

l l

l

?

w I

i 5 < *s 4t

. g 'j i

d i i g

et 4 6

R yg j il m.

leNI

+

i I

+9 A

gi m

'S i l4

.4:

,i J

d 4'!

ib, l

g Ili 1

1 '1 3 is ls I

3

!i e

e f 's a

s 1

is i

1 1

t 2

l.

e j

14,,

W l.

'/-

d 4!

4

'A$

.l'

) ' !

I 3

W i$

i g

i b'

i e

l 13 l

4f

{

0 1

s x e g 9

/

r al lIdY j

@$l3l1Mff

plj, j

e(l!hi

!yt a.n pA Og. Ly %o an u.o da!s!H bliliit H m n 11

! 4 gp2.p u a

gi 9

a y

.s2

~

6 d'.

d 7

O d

lh, l

s

>=

j s

s s J J.) ili

.9 i ll s

_r

....p<. 3..

1.

~~

fi j 4t g

i

  • g.

9' NIS.2 OWNER'S REPORT OF REPAIR OR REPLACEMENT l i

AS REQUIRED BY THE PROVISIONS OF

]

ASME CODE SECTION XI If additlenal space is neccesary, use Supplemental NIS 2 SS-@ad ar 's ownsa s

Floride Power Corporation

'1'

P. O. Box 14042

/

St. Petersburg, FL 33733 4042 ilifd Pi.Amt Cjtel River Unit 3 I'

< P. O. Ses 1240 Crystal River, FL 32828 1240 Page / of [

wona paneomoso e-

.e

' assun iaa e o.auwoan..es wumosa. rec.

S Calk!

eW%t U

LU YOY 'l$hl$$

lh N &

3.

.coass.

f he p ~' 5 &

W W

YY h n anoe, o, sm

$OW/* M appucasu ocasmucto= cons semon nooemaa.caos cases Saw B ee,V is appucaeu samaa or secnom a imuseo sea nera ns on napucauswes amoewon.ooos cases

&movew /913 Aporg/ci4;

/f/3 d*C/*Tsc A/

4. g identl'lcation of Cornoonents Repelred or Replaced and Replacement Components NAmt 0F NAmt 0F MANUPACTUAEAS NAftoNAL ofMER YEAA REPWREB, REMActe 'f.".' '.2' componawf MAwuPACTuman stas 4L wumest so. wo.

soswflPICATIoM BUILT oA REMACSD m l mo

)

SwoV$-

WW VNJ'f l'~esof 4 /73* O'E X N/A RV Y5 Mb9 h/44CfD f

5dRar 7Ac ArMid SS - WP7- //- d/

'A'44 v/" AP472r.E48 '"

  • t M2 4 /S 7 cf AdW4M.f4ltSC/7 /A' FL75 Cah JNes/fh) e e u...,~

.s.,.

-,w

  • s, - m i "Sa W"4 ' MS B3/. 7, /?M Eemo^/, ^0 ADO *O A, //s cces exd 0"#27
  • VSAS 83/. !, /.9 6 7c%'?wA,l'0 WAosWM,, A4 GorOsf

/

I

F ",'

- J e

w y

L, I

f g-E st.

88-o034 i

NIS 2 CONTINUATION Page a. of 5 e

l R w ve exa M o seka cAcck valve a.ud ecolace wWL 1

J 1

olk check,. hsk H

% es. &

Mod $,

%ers F ' '"E ttSts ts.P.

a p,.

a n o min., o p,,gio, p,,,,,,,

a o,3,,

jgf,,, g, 7,,

f7gy0.cf80 e0

- a, mv.s.

.crv=n =1s =,om

==. wucaea c+k&c e! " Bdi oG McA-aJ b M AR. 88-m- n -ci

=

set s.

k V

CERTIFICATD OF COMPLIANCE r

/

O Repair Gf Replacemsnt conforms to We eettify that the statements made in thIt report are correct wi thisSection XI of the ASM Code.

DATE TITLE F

  1. esem a og Et essesAfvet

// Y $A 8C/AL' N

&W 1

L

\\1

/

/

(

l

~

f

{

l CERTIFICATE OF INSPECTION 1, the undersigned, hold 6ng a valid commission lasued by the National Board of Boller and Pres",ure Vessel North Carolina Inspectors and the State of Province of Arkwright Insurance employoo by Nonr+j. Mass have inspected the January 10. 1988 to components described in this Owner's Report during the period June 23. 1990

. m mee the to the beu of my knowleep and ww, the Owner has perf ormed examinations and taken corrective measures described in this Owner's Report -

,ln accordance with the requirements of the ASME Code,0xtion XI.

By signing this certificate, neither the inspector not his employer makes acy s aty, expressed of y

H t,lled, concerning the examinations and corrective measures described in this owner's Report. Fur.

$t3 teermors, neither the inspector not his employer shall be liable in any manner for any personal injury Y

ss of any arising from or con e w h inspechn.

/

g y

y ComutssOes (N AtioNAt acano. St Att, Peovnect om speconstutNTsi I

toess ECfoe s seoseAtuat-

_ _ & lB-90 navi

=

h.

PA04 3

.es A31 h

h W

hs2a.an surY A,3h

,~

.7-..:,

I e

i ga Qa.

M A7 N e,_J n, g

-8 o-e a

c o-38 WM n RS 1,

'=.

<(0

$ in5

  • I :.

S w F-by a

g w.

i s 2 r u vi d

N gp 2,Oh 8

t T

R$

26 26 Ei nl'

  • e Biilil 1 i i l

ic

+

+

r t,

t Igi e

e' 4

I f b

T T

1 7

7 I

4 4

4 4

4 vi l e

2 4

e j' i !

1 1

1 3

Y v,

h I

h 6

il 8

g 4

4

.p O

L%

1 3

I r

a gf

t..i i

.4

....g........ )

o O !

( fi

[ji L

$i xl2 illh3 ft!e)jH j ')s i

g L

ii el,g 4

t cuu m e

j p g.; p j o,n. n n r

g ha g

eje fcjefgig{W!@er

{

g-I g

i f vl ADg)qpi ej c]

t a a o lis *g p gm s % 1 nl3 $$R($ls'$85h!$51 3 !

e E

'[

h-d O

O d

S j

t a

Ew Q,h *,E b

w

~

. =

.~

ANS'2 MM SENS$ k YAS 1

Q

{e n,o

\\o a

~e

.p) c l ht VN E

T G-0%

QC 4

'k b

I d

I eli! !! l*i.f.$1 )s ly JtE d

i l i

e6 e6

< ?,

l 8

g g il i f,=q:

3 4

5 I

r g

l a i

e i

r g

r sc s

.a

=

w

l igl.

1 J

iis a

j a

' T; t o.;: 1 r

1 s

e l>

s-s a

a

..h U

U.

O N

f

,g" 6

'N l1 N

d I

i IJ W

h h

1 !$

(

lq A

9; j

iij2 3

L 1

S x s 3 p;e L

s eg l

re t

3 a,

i.

6 3 e li 7

l Y'

f o

i

,1 f f 6

(

l l

L Iq

3 '@ Ng gt j

O

,i i

w-s ha a

vo OI k!

2 E% g 4 N

-l4 #

_j f W,d il t

1 5 l

fe E

l; d.,i.JJ$-

f N f5 1gofac#

p 1

uA a

g s e v

'i l h E di g

Le lilH

a c <

9 L 3 q

lii

_a I

(,

[

a)

I-li su i

p

, ~,

a t.'

ch Nl,!-

Pk

'83 i

a e

i jm o s

-6 v u-m y

m

[

e I

'f G

[

j i

gl l

$II g g sll{

.j

<l e

&.Y, u

a jN' 4

2 I d i

W l

i ld F

0 i

W T

j

(

i-A W g g

w ii I

a K I

o'e gY -y a a

i 9

i~

8e o

J

1ll, o

yg j De i

iq I

i

,l s'

l s

1

$ $ M@m oa 1

J f.;

i-I

'i1 1

  1. 5 g

i w jP l

y

(!

s 12 6# 'En M l

2 i ii oHl/

i' si f1; o

I' i

lE l -i x

' J,...

NIS.2 OWNER'S REPORT OF REPAIR OR REPLACEMENT AS REQUIRED BY THE PROVISIONS OF-g ASME CODE SECTION XI If additional space is necessary, use Supplemental NIS 2 88,- 6 oare onnen Florida Poact Corporation

/c/f4 I'

P. O. Box 1404-4 St. Petersburg, FL 33733-4042 i

P(ANT Crystal River Unit 3

. 2.

P, O. Box 1240 Crystal River, FL 32629 1240 Page f of 2 ameam omannuaten. P.o. nuussa, m nuween, ric.

wong pearonueo av Inaue Flockb Pocev-

&rp Work. Request 106 c6'7 V

3.

aooness P.O. Box.

12Ao dess4c.l River. 3 FL 37 6z9 -124o lo NTIPlcAftoM oF SYSTEM Ma4~ Sh imicaea ca 1=crou coo.

somon coo. cans 88-as As - 831. t 3 19F7 Ed.

1967 annue eu somon or secrea xi uriureo con amaans on annuesusan aooenoa. caos cans 1983 Ed h S% 19 63 Addedeg t

6.

Identification of Components Repaired or Repla-ad and Replacement Components NAME oF NAME oF MANUFACTUF NAfloNAL C ' v+ +

YEAR REPAIRED. REPLAct0 T h'**

I r'

f

-/src

  • QIcbe P.O.
  • component MANUFACTURER SERIAL NUW

_ j B0. No.

10ENT'rKAOoM BUILT OR REPLAC80 m l mo g toe,Msv.%

\\/edh PRS-13 90 replac_c2.

2stx:,* m ~

e.c. =

rep 'cM l

G8c d'Ab c MC h F96Z')b i

t i

i r-l l

('

n.T: use of Piant asse. Nuo.er oos. Seeineenas eco m see L

1 L.

4

.m 28-cc4to NIS.2 CONTINUATION Psee z-of 2_

esecanaten or woam

& cAe6 MG\\l~I(&

Lu W a-A&u3 v'A< A d PGQ I*

IdfM T ?- f C>- 06nO l tests comouctio

[ Nominal Operatine Pressvre passeuss vests toise.

I' O Hydrostotle O Pneumatic O Other fff. 79 poi,fJg-

  • p 1

Masaals pesoLWoe asAfeWPac?WsER1 ontA AspoRT N IP AppWeAeWe P.O. F 9o6o A29 D S.

1 CERTIFICATE OF COMPLIANCE

- We certify that the statements made in this report are correct and this O Repali (a=='r:-.e.t conforms to -

Section XI of the ASME Code.

i

/

sa= __ _ _ essmavtAs Tvr6a enig 5 Y h d C /a4 4.4 f r

// /

,1990

/

/

-)

r a

CERTIFICATE OF INSPECTION t, the undersigned, holding a valid commission issued try the National Board of Soller and Pressure Veeeel inspectors and the State or Province of North Carolina ornployed by

_ Arkwricht Insurance

, Norwood, flass.

have inspected the components described in this Owner's Report during the period c iuary 10, 1988 g

June 23, 1990

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report -

' In oc tm with the requirements of the ASME Code,Section XI.

Sy sl(.Ing this certificate, neither the inspector nor his employer makes acy warranty, expressed or

' implied concoming the examlutions and corrective measures desc ib d i thi Owner's Report. Fur.

re n s

thermore, neither the laspector not his employer shall be liable la any manner for any personal injury r prty a oss of any kind arising fromg nectgi this inspection.

mespectons senatuas comensesens esatenat ooamo stats, p=ovacs on smoosesiesutse 07-11-90 ears

=

  • w

,a.e s - e, p

w g-e

,-w

--e, e

r e

nn

-ene

1 x

t 9

NIS 2 OWNER'S REPORT OF REPAIR OR REPLACEMENT AS REQUIRED.BY THE PROVISIONS OU '

ASME CODE SECTION Xi' 9,r/-60/g3 if additional speos le noosesary, use Supplemental NIS 2 onts ownsa Florida Power Corporation 27's],/gf P. O. Box 14042 St. Petersburg, FL.33733 4042

)

PLANT CrystiiJ. River Unit 3 2.

P. O. Box 1240 Crystal River, FL 32629 1240-PeGe / of 2 wona pennonuso sv smame nepam onoameAtu:m. P o. muusen m numeen, etc.

/~/edade t%w 6sprws%

cW" /97749 3.

f}yobl$wfr$r//? PG$es /240 &sd/$w S 324A9'/MO Aconses eswimcanon or systuu

^

Y&

4 4v&

appucast. constnuctom caos somon aconnon, oaos cases

,39 g,7 Sa.

g,7fj y

appucasta somon or sectum a vnusso con noruns on nem m a-a cootcases S m w /ffts s/.:JA m A

/983

- s. -

Identification of Componente Repeired or Replaced and Replacement Components M

0000PoNWIT 88A400PAoTUeER SEM AL NUIsest

  • So No.

loEBmPICAftoN SUILT On ApuCIIWif vos no

/??

A

']/o$ w AJ't~/h

$bn W'Y

  • Sf6 llS-/SM

~~

~

/

/

PoArww

/

Ashonv/

/

mmh"MFoAY-tb81/%t /R Y bn wo 74tvM 227" A

/

ANf3&/28A' 9

$s exerr L

'/Wdn dwerr///$vr

~~~

~

i

-/i e

i-h)krtuenk 4fND e d E 2f\\(-

/ Sb'fl$n

$mienA//nf

~~

~'

/-

/

/

/

1 nen um of ment nesPt Numeer sngneenne Amewones WO @

taas t

p

=

y 9e

=

w

,m-w-

e, n-a-

u

a nu in SV* l'W/.L.

NIS 2 CONTINUATION Page 4 of 2 -

pescairnoa op woan

$r$<'.

> -~ bs. FW4/-t/3 a v,'r6I a,uus.e bae. on/rellv

-w.S lm. r, nksd-

//

I

/

\\

&n exp, As r/ A,% l h

a.

m.,rin fwih a / /l,+-~e-s e-lbk 7 L l R aid O, 4 lA ~ / 4 s a'4 " Kiroeuz!sv to-Pasasuna TesTsTsup.

.ais cowoucTao j

O Hydrostatic O Pneumatic E Nominal Operating Pressure ther pel

'F I'

neuAnns onctuon P. o. NuMSGS

/df/'%$MWrl kbn o - A')/9/' YOA'29 - 'k'

  1. w'

.* m /s

/ se., +*

/

$,, v f mW ns, ew A

\\

-/

h Y SS/ $ $b f W h sW/ JN AA/R / Wff W v

/

l CERTIFICATE OF COMPLIANCE WO certify that the statements made in this report are correct and this O Repair

[ Replacement conforms to Section XI of the ASME Code.

J ownsa seseo=ATuns Tnts oats Y'

Mf'jdl. Ad*Y h

WO a'

2

(

f CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission istued by the National Board of Soiler and Pressure Vessel Inspectors and the State or Province of Mh Carolina Arkwright Insurance e,

employed by Nonsood. Mass have inspected the January 10. 10Asi to components described in this Owners Report during the period

.une 23, M and state that to the tmst of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Secticn XI.

By signing this cordlicate, neither the inspector nor his employer makes any warranty, expressed or impiled, concoming the examinations and corrective measures described in this Owners Report. Fur.

. thermore, neither the inspector not his eenployer shall be liable in any manner for any personal injury p[

op of any kind arising from on ggedgpls inspection, l'MSPECTO8rs ss0 NATURE CotetNsSeoMS (NAT1oMAL 90Amo, STATE, PRovlNet OR EM0oAStuGMTS) 06-28-90 Daft te n9

t e

NiS 2' OWNER'S REPORT:O'F REPAIR OR REPLACEMENT AS REQUIRED BY THE PROVISIONS OF

. ASME CODE SECTION XI

g..........
  1. f-40/5' If additional space is necessary, use Supplemental NIS 2 oats owasa Florida Power Corporation 2y.2qkly l

P. O. Box 14042 St. Petersburg, FL 33733 4042 PLANT Crystal River Unit 3 2.-.-

P. O. Box 1240 Crystal River, FL ~ 32629 1240 Paca~

of 2.'

neram osaamaanon p.o. wuussa, as nuusen. ac.

wenn pennonpso av peaue f4nWs Avve-dosp-m b st W/# ///653 3-aconses Ndet H042.sVA$/ssshew /4~ 33ff 3' - 4642.

mewimcanon or systuu L

FAises&# (YW)

Appucasts coasmuc;om caos son w e accanoa, caos cases

~

0*'

6S/./

19 (,*7 acomma, enor. cases

~

appucasos somon op escnom a vnuam pon napans on napucosens Leac;w /183.4d$~c$u

/98 5

- 4. '

identification of Components Repaired or Replaced.and Replacement Components NAast oF NArtoF RAANUPACTURER'S NATlo6%

oTHER YEAA REPMAID RWWCED "$"p'

CotAPoNEfff 14A84UPACTURER SEMAL NURSSWI 30, leo.

100mFICAftoN BUILT OR REPUCIMff vesl o bfst*l W

M 3-/3')O th/Is /I$$!*/43 Ymeow)

9.f*D W.

~

  • ~

g,/_ }

g pcp9p3'zt26 4/n. AvV /O 6/sn.

4 06-2648-0273 Ashw e

wmium x susctik #d so.

gr2299o2 n

h ug

(

i I

nen use oe ewn asse: n sa, e 4 w.r-.

om ei is.a L

l-I.

{.

.i n

.= auMaa 89*$0/b NIS 2 CONTINUATION Page 2 of 2 o ca.cnoa o, wo=

/wv-MS Asdam-,r/m A&d' 89 -of-09-o/

/

7.

PRESeuRE TESTS TEMP.

O Hydrostatic O ' Pneumatic O Nominal Operating Pressure Q Other pel

'F T8878 con 0uCTRO 8'

neMi=s onctuos P. o. muMsan>

A /x v s E d ' F 9t26* 2/ 2 i" / h, y/$om ab adAC/*SIOf/fWPD A

-ud-wh.

System was returned to service following this The test was satisfactor' ly replaed$ent without c'nfucting the required pressure test.

o nrananva test performed on 1/16/90. NCOR 90-97 was written fnr not enneinn* 4 n e,

  • h.

.q,4

.A CERTIFICATE OF COMPLIANCE W3 certify that the statements made in this report are correct aM this O Repair Replacement conforms to Section XI of the ASME Code.

ownsm soonATune im.

OAT

.1"$.2' fNeC&4.s47" do Y

199 0

/

/

/

R r

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of linrth camlina Arkwright Insurance og employed by Norwood. Mass have inspected the components described in this Owners Report dudng the period laauar_v in; tonn to A8 2b

- and state that tc the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or Irr. plied, concoming the examinations and correctiv6 measures described in this owners Report. Fur.

thermore, neither the inspector nor his employer st.all be liable in any manner for any personal injurf j

se of any kind arising from or gged gtgtple inspection.

COedMISSloNG (NATIONAL BOAMO STATE PROVWeCE OR EMOOASEMENTSI INSPECTOR's $4GNATURE

_ 06-28-90 oATE 19 1

PAGE 2 900 431 1

_.~.

1 0-NIS 2 OWNER'S REPORT OF REPAIR OR REPLACEMENT.

AS REQlllRED BY THE PROVISIONS OF-ASME CODE SECTION XI l

g

-it.editiones

e. is noe ry, sappiament : NIS 2 89-00\\9 care J

Florida Power CorporSilon -

1*

P. O. Box 14042 3l9/89 St. Petersburg, FL 33733 4042 puw7 j

. Crystal River Unit 3 I-P. O. Box 1240

. Crystal River, FL 32629 1240 P.ge I of 3 1

wony. cionmeo ev peane nepam onsaantanon, p.o. nuiseen. sos nunseen, arc.

Floc id c Pow er Q)co.

VJ. R. #

lilO31

)

S.-

aconsee P.O Box.

l24o io.macano w evmm Ma.ke - u p

(.Mu3 somou c.er aconnoa.caos cases a,Pucamscouernuero.caos sa.

(A.5 A S G 31.7 to 6th ERRATw crWE i%e ; -

a,.ucama seman w seenan a uman con nepans on asiucean, somoa,cooecase -

L g 9g,3 l

3 gy

)963, sa.

4.~

identification,of Components Repaired or Replaced and Replacement Components l

NAast oF maasE OP alA800PACTURWPB 14ATIo06AL ofMER YEAR REPAMER. ApuCED E *"en*.

m l.

ootspo00GNT IAAfeUPACTURER EWilAL 0000005l BO.100.

' 40EgmPICATloM SUILT OR AWuCIIEN, was no ma,"= t tav -w,7 A, e w m u/3 wAtwog.m g/A S!E-vT

  • g91l Rispuwzt V

C4

  • VELhd hS"1 M}A. p$.$9.5 1978 ROLAC&M l d5lW 2M G ^W ""I Scited Bonne+

i hP4 FIN Q/4 9 fg g /p geplgccj

/

L se.2-w.a NA Pers i Fo*4s see ske 3 AJ/A Repku-ed f ur.3 L

u L

f t

1 I

nETI Ul0 Of MWit asEP" NesElmW 'M AGElsrWice 9fe 431 iM

. m aumeen 69-C06 9 NIS 2 CONTINUATION Page F_. of 3 R e olacc mdve Mav-3s i;cladq A

s e c.; A o4 oesca anon op wons 22 O # f)e.

c6 d 90' O f>crt J.

\\A/0v-k inete-M4(t R9 c> 7-DI ensasuna tests tsue.

rests comouctuo 8-

/ Hydrostatic O Pneumatic O Ne ilnal Operating Pressure O Other 9/f.f psi 70

'F l

nemanus onctuos P.O. NUuSEng

&c> lw ne ~+ Mae - P.O." P 74008(ub - Reo facem4 P?oe -

P of F 90Z.9919 - Replace a~f 90' 6f bu.a - P.O.* Oo 1402.12 ;

Repic cemed 4" ftc k. - P.o# f: 903so87

)

J CERTIFICATE OF COMF LIANCE W certify that the statements made in this report are correct and this O Repair

[ Replacement conforms to -

'Section XI of the ASME

.A,s

$ fa~[ f

. WC on s

A,-

Y2 f5 NC/A/ /W

/f

_4

/

r f

~

3 f

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel florth Carolina Inspectors and the State or Province of Arkwright Insurance employed by llotwood, MASS have inspected the January 10. 1988 to components descrited in this owners Report during the period June 21 1990

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requimts of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner's Report. Fur.

thermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury loss, of any kind arising from o t

th this inspection.

rty d or manecton s soonAnine couwessoas tuAno=AL soAno, atArt., enovmca on smoonssuante 06/28/90

i oArt is b

PAGE 2 900 431 i

w

- - =..

l.

^

l.

3 A

o 3(,,

s I l 4 2 k,a t) 2 1

j$

S i[l Ig:}Ju 4

e s - t'

@ 0 wD7s 3;

9 s Q vj u Pn s

u g

a s a

c

.l j

e vau 9

a, q h e u.

( g e

s S

g

' A s

s

\\

g wy ( tg s,au

..m g

9,

s b

1 Iaas ag 7

A 4

/ gE e

t 22 I-N-

o-N g

o III 3

]

j

~

l l i i l

,4 lg.I>n 1 )3 w

J 1

1

.e W

k k

-(

D l-s q

s

.g iN

-;. l k?

u.

9 4

(a gy A

o y

2 ab

.1

-j ef L

g g

i % g ),;

i a

5 r

I L is.

8 g

, d' a sE I s ')aE g; 3

1 shw?

1 Ili ::

a

[

a g

a t

g ;

o s

l Il s T &fi t

{

o s s!

a R :t tla t

s

,4 s

t q

p 4

n

)

%(& k 2

.t '. 1 OI b

/

6 lI 01 1t w

w I

lj l

ss 4

s s-p 9

x

o. =

.s

-(-

N 't l

k N

N

/

u v

(

3 j

-l 6

. (

\\

M M

h h

l, h

p/

Y

.?

s

~

t :

1

(.'

j,-

i p

7 NIS 2 OWNER'S REPORT OF REPAIR OR REPLACEMENT-b AS REQUIRED BY THE PROVISIONS OF!

ASME CODE SECTION XI noaNUWsER 89coS7 If additional space le necessary, use Supplemental NIS4

~

oats owasm Florida Power Corporation I'

P. O. Box 14042 (y-7-f39

-)

St. Petersburg, FL 33733 4042 Pt. ANT Crystal River Unit 3

. 2...

P. O. Box 1240 Crystal River, FL 32629 1280 Page /

of Z WonK PEAPonMEo sY (NAWS ntPAm onGANIZADoN, P.0, NVWs4A. Joe NUWsEM. ETC.

}~PC -

&/* } / Tl 7G 3.

Aooness Po S:>X 2/ 9 C/'vc. -rs t. %df c FL A b2 <. 2. 9 1

topniew; Anon or system TE C V - 4 7 ApeucAsu coastnucion coot somon AoosuoA. coos cAssa p,v :,,, 33/.7 1969 AppucAsu somou or secnon a unuano con naeums on aspucsMants Aoxmoa.cooecAssa -

L ~r e N3

/98 3 n-4.

Ident.ution of Componients Repaired or Replaced and Replacement Components NAME oF NAME oF

, MANUFACTUREA's NATIONAL oTHER YEAR REPARRED, REPLActO ^!,u'.# *a*

CoMPoNDif MANUFACTURER saRIAL NUMSER' 30.No.

10ENTIP1 CATION BUILT OR REPLAcalENT ves! me-r ~ a r J T.5-13ma VALa r.

l.'6 L p al A>/A A!/A RCVS7 NA hxt.s X

Fos. FM s'6* <M 4

'l/ Al L t) 2

<4$6WSY

.' W '4 7 N

Wu MS&M sk 4

l

- + ~ - +*"

H ne.us..m.,nem

,e, w.

.iooei j

u.s

)

i

,I

4 Mu NU..ta eq-o w?

NIS 2 CONTINUATION Page *2_

of 2.

OtSCRIPTION QP WOAM "R *r }><- so el' ' RC J =-W)'

1.

g k4 PR 18 TEMP.

ftSJCON00CTto T

g F Hydrostatic O Pneumatic

_O Nominal Operating Pressure O Other a

pal @ *F j

m REMARES tiMCLUO4 P o. NUMSEM f f (,8f ?$ 0

~

  • p gM-9.

i CERTIFICATE OF COMPLIANCE NVe certify that the stat.ements made in this report are correct and tv,is' O Repair deplacement conforms to Section Xi'of the ASM Code.

QWN OW 1 DES S40MATVnt TITLE Daft

.1.fC bd@4c.fr

[/A//,1990

./

F

-7 CERTIFICATE OF INSPECTION i

1, the undersigned, holding a valid commission lasued by the National Board of Boiler and Pressure Vessel North Carolina Inspectors and the State or Province of

=

Arkwright Insurance og employed by N

' M 88*'

have inspected the components described in this Ow7er's Floport during the period January 10, 1988 to June 23, 1990 and state that to the best of my knowledge and belief, the Owner has perforTned examinations fund taken correctiva measures described in this owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his err.;loyer makes any warranty, exprassed or Impiled, concoming the examinations and corrective measures described in this Owner's Rept. t. Fur.

thermore, neither the inspector nor hits employer shall be liable in any manner for any personal 9]ury am any kind arising from or ed w th this inspection.

IMPectQa s SIGNATU48 COMMtSSIONS (NADONAL SOAMO, ST ATE, PACVINCE QM (NQOR3tWENT$)

09-04 -

e 1

OAft 19 PAGE 2 900 431 K

Ef b

.m m

I ;;

A

.- (/,fj NIS 2 OWNER'S REPORT OF REPAIR OR REPLACEMENT AS REQUIRED BY THE PROVISIONS OF i

ASME CODE SECTION XI-g v.

" ~ " " -

$0- ggy If additional space is 'necessefy, use Supplemental NIS 2 oATE owner

)

- 1*-

Florida Power Corporation P. O. Box 14042 E-/2 c)0 St. Petersburg, FL 33733 4042 PLANT Crystal River Unit 3 I

2.

P. O. Box 1240 Page

/ of 2.

Crystal River, FL 32629 1240 aseAm onoAmeAtion. e.o. nousen. m wuusen, etc.

wona panno==so et p ame WA eSB7&I fi-c P

Acomess E/R f6 MD Po.' Ee,x - /2</()

c'*2 rs7tx ioentiPication or ersttu

/?ff somon AccewoA. Coot cases ApeucAsLa constauctom coca

'19 67

~~~~

t/Cfs B3 /. /

APPUCASLE toffiON or SECTiON XI UtitutD PoA REPAIAS on REPLAC8uGNis AcoGNoA.cOct CASES

/M3 S m - rry'?3

~

Identification of Components Repaired or Replaced and Replacement Components 4.

REPANIED, REPLACED Ek NAasE OF NA808 oF MANUFACTURER's NAflo'4J.L OTHER YEAR coedpoNENT IRANUFACTURER SERIAL NUtBSER 30.No.

IDENTIFICATioM SUILT OR REPLAcWIENT vus me 34R4H:D &

FK iYN

/~ f

.De Sosf

^llA NA 653 808/95 WA htACfD V

f

?)pr N/A plA M/N - h0020 N/A

/$atAcf0.

V N

?

n 1

l=

l o

l.

ast: ue. e a-w asse:==i tso a aae A.

.ac.

suo os l-

'n iamo i.

'\\

(

-, - + - - -. - -.. -,

ix'I i

=.n u...

Jo ct:trz. -

NIS 2 CONTINUATION Page A of 7 -

29

[bf'l I

I

90 v

P Passavat tests temp.

Tssycowovetto W Hydroststic-O Pneumatic-0 Nomi.'al Operating Pressure O Other

((. $ pel [0, i' ' F t

I' 4 " '

msMAlms poeCLuot MANVFActumsts DATA 20Polti M5:R.If APPLCA5Lal M Gns 9.

i E

CERTIFICATE OF COMPLIANCE WO certify that the statements maos in this report are correct and this

'O Repair

[ Replacement conforms to Section XI of the ASME Code.

/

oatt owne s

=ssse=Atuna tetts s/1 5 2 2 f M C.utciJ 7' 7

e 199C

/

/

/

1 r

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel North Carolina i

inspectors and the State of Province of Arkwright Insurance g

p, No W, kss have inspected the

.1m ema ry 10, 1QAA to components described in this Owner's Report during the period Ju_ne23,1990

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

f

. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or L

Impiled, concoming the examinations and corrective measures described in this Owners Report. Fur-l4 thermore, neither the inspector nor his employer shall be liable in any manner for any personal injury aloss of any kind arising from oggtggthis inspection, y

l inspectows se=atuat N commissons <=Ato=AL soAno. statt. Paovi=cs on ENooRSEMENis) 28-90 ie oAtt PAos2 M 431 j

m

,g':

RIvicion '

?

3 '. 0 - LISTING OJ_ EXAMINATIONS FOR OUTAGE 18 contained-Lin v.his Section is the Florida Power Corporation prepared Inservice Inspection Plan for the 1990 refueling Outage #7 (Outage #8).

s I

t n

f 4

1

'.I; 1

1 l

3-1 i

I' h

D 1

O-:

l

VL@REDA

'90MER rees.nma

=m 9

')

DATA FORMAT LEGEND & NOTES P

The following fields are used in this ISI program. They are listed alphabetically:

with a description of the respective field.

L Field Description CAL.

Crystal River Unit 3 Calibration Standard used for UT Calibration.

CAT ASME Section XI Code, 1983 Edition, Summer 1983 addenda -

as described in Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 and IWF-2500-1.

CflG Component configuration, eg - P-E = Pipe to Elbow weld.

~

(See the " PIPE AND HANGER ABBREVIATIONS" list in Voluml 11 Section 3 for a complete listing of abbreviations used.)

I CL ASME Section til Class 1, 2 or 3 COMMENTS Remarks or comments that will clarify or further explain ISI Requirements.

CONST.10 ISI component identification number as shown on IS!

l Drawing.

D. PRESS Piping design pressure D. TEMP Piping design temperature DWG The ISI drawing upon which the component is found.

HANGER N0 151 Hanger identification number as shown on 15!

Drawing, HYDR 0 This field contains the computer generated unique identification number assigned for each hydro test.

11 Same as field " INT".

INT

. Ten year inspection interval 1, 2, 3, or 4 L

IP Same as field "PER".

L ITEM.NO The ASME Code item number for a particular component as

(

determined by ASME Section XI Code Summer 1983 Addenda, in Tables IWB-2500-1, IWC-2500-1 and IWD-2500-1.

~.. -

l

...s El GRIDA-POWER emmenarsom H

b DATA FORMAT LEGEND & NOTES (continued)-

I Field Description J

' MAT SPEC-The ASME Material specification for a particular-

). >

material.

Pal 0(S)

The FPC Unit 3 flow diagrams related to the portion of

-J i

the system being ect.a.

PER Inspection eriod-generally 1, 2, 3, or *.

(*When the O

schedule is dependant-on other components or another category than the inspection category (s) listed)..

PROC The examination procedure used for examination.

REMARKS Same as field " COMMENTS".

SIZE Nominal pipe size in inches.

(For hangers the

. nominal pipe size is the size of the pipe to' which.

the hanger is attached.)

l S/T Nominal component thickness in inches ST Component support type.. (See the " PIPE AND HANGER ABBREVI ATIONS" list-in Volume !! Section.3 for a complete listing of abbreviations used.)

4 SURF Surface Test index nt..nber which correlates to -

the specific NDE procedure. to be used.. (See NDE procedure list in Volume Il Section 3.).

SYS Piping / Component System SYSTEM Same as field "SYS".

T. PRESS The hydrostatic test pressure needed to comply with.-

ASME Section XI requirements.

UNIQUE ID The computer generated unique identification numter assigned to a particuiar. component..

UNIQUE NO

'Same as field "UNIQUC 10".

'VT Visual Test index number which correlates to the specific NDE procedure to be used. (See also NDE-procedure list in Volume !! Section 2.)

w.#

i.; _

.__,-.m.,

mm pugnggA,.

POWER-esamennesen lI.

DATA FORMAT LEGEND & NOTES (continued)

Field Description VOL Volumetric Test index number which correlates to t's specific NDE procedure to be ue.ed. (See NDE procedure list in Volume !! Section 3.)

IST 150. POINT Used in the computer' generated HYDRO list (Section 9) to identify the -first. isolation point (s) for the hydro-test.

2ND ISO POINT Same as field "1ST 150.' POINT" except that the second isolation point (s) are identified.

4 When a component is Jto be inspected, a number representing the Procedure numbe'r i

j to be used will be placed in the respective column, for example,,#5 in the data listing equates-to Procedure' NDE-PT-04 Rev. 9, " Liquid Penetrant Examination.

(Color C'ontrast)". See Procedure Index contained in Volume 2 Section 3 for complet'e listing of all procedures used.

4 1

I i

L-,

I I

l li 3-i I

l:

p o

- a 5

s

..t-.

y m

m

- - m

~

LISTIriG 0F EXAlbllIATI0llS REFUEL 7-m

~ -... -..

~

. w..

~

PIPE........ CONST.lD....... CF16.... CAT.. ITER.N0 DN6....... VOL SURF VT. CAL...........

MAT SPEC.... SIZE S/T... PROC. PER INT COMMENTS................................

Bl.3.2A-M 24 TO 22 F-MG B-A

- Bl.40.

SKIAC.2 UT.

~40707 A508-64 CL2 RPV 6.6 9

1 2 0 TO 120 TO SA333 GRB B2.1.1.4 MK5 TD 1 UN TO 5 'B-B B2.11 SKIAC.8 UT.

40707

~ SA516 6R70 N/A 4.80 9 1 2 1/3 EA PERIOD:

B2.1.10.

M 41 TS 40 P CS B-P B2.11 SK1AC.8 UT.

'40756 SA508 CL1 N/A 12.50 9

_1 2

B2.1.11. A - MK6 TO 1 5 TO LH B-P B2.11 SKtAC.8 UT 40707 SA516 GR70 N/AL4.8 9 -

1 2 '1/3 En PERISB-32.1.2

. M1 TO 1 LS' B-B B2.12 SKIAC.8 UT 40707 SA516 GR70 N/A 6.2 9

1 2 EIAM 1 INTENSECTIB M u!TM M 5 ft 1.

92.11.1 RELIEF VIV. M-! ST & NT B-6 B7.20 SKIAC.8 I

CS 1.25 N/A 1

1.-.

2

-AIIS B2.2.1 MK32 N-I AIIS

.N-S NIR B-D 93.120 SKIAC.8 IIT 40709 A508 CLI

'N/A 4.5 11 1 2 82.2.4

' MK9 TO 5 N-S NIR B-D B3.120 - SK1AC.8 UT 40709 A508 Ca.1 TO N/A 4.R 11 1

'2 54516 GRIO B2.5.2 MK75 HTR BOL ST ST B-6-2 B7.20 SK1E.9 i

SA320 L43 2.0 h.'4 1'

1 2 IN-PLA *.

32.8.11

  • M 126/128 TG 3 SUP TO S B-H BB.20 SK1E.8 UT RT SA516 ER70 N/A 3.5 1 2 V-Z At!S B2.8.15 M 126/12E TO 3' SUP TO S B-H E8.20 SK1AI.8 UT Mi 54516 ER7^t N/A 3.5 1

2.

Z-N AIIS 92.8.3 M126/128 TO 3 SUP TO S B-H 88.20 SKIAC.B Ui MT SA516 ER70 N/A 3.5 1 2 W-I AIIS B2.8.4 MK126/128 TO 3 SUP TO 5 B-H BB.20 -.SK1AC.8 UT-MT 54516 ER70 N/A 7.0 1 2 N-I ARIS B2.8.5 M126/128 TO 3 SUP TO S B-H BB.20 SK14C.8 UT MT SA516 6R70 N/A 3.5 1 2 I Atl5 32.8.6 MK126/128 TO 3 SUP TD 5 B-H 88.20 SKIAC.B BT M SA516 ER70 N/A 7.0 1

2.

I AtIS B2.8.7 M126/128 TO 3 SUP TO S B-H 98.20 SKIAC.8 UT NT SA516 ER70 N/A 3.5 1 2 I-Y AtlS B2.8.9 M126/128 TO 3 SUP TO S B-H 88.20 SK1AC.8 UT MTJ SA516 GR70 N/A 3.5 1 2 Y AI!S~

33.1.2.A MK7 TO 50 56 A LH TO TS B-B B2.40 SK14C.6 UT 40704 54533 ERB N/A B.00 9 1 2 1/3 EA PER100 CL1 TO A508 64 CL2 33.10.2 56 A INSP.

LH BLT ~ B-6-2 B7.30 SKIAC.6 1

54-320 1.0 N/A 1

1 2 COVER SR-L43

~

B3.10.5 5 111/199 56 A UN M -

B-6-2 -B7.30 SK!AC.6 1.54-320 2.6 13.5 1

1 2 BLT SR-L43.

. 33.10.8 MK111/109 56-3 LH M B-6-2 B7.30 SKIAC.7 1

54-320 2.0 13.5 1

1-2 BLT -

GR-L43 B3.2.2 M65 TG 7 56 A N-NB MIR B-D B3.140' SK1AC 6 UT 40704 SA508 64 CL1 N/A '8.00 11 1 2 ~

Y-Z AIIS SA533 SRB CLI B3.2.5 MK65 TO 7 56 B N-ND NIR B-D ~B3.!49 SKIAC.7 UT 40704 54508 64 CLI N/A 8.00 11

-l' 2

' Y-Z Atl5 TO SA533 GRB w

~

T'

=

w

  • 2~

.c PIPE........ CONST.II....... CF16.... CAT.. ITER.NO BNG....... VOL SURF VT. CAL...........

MAT SPEC.... SIZE sit... PROC. PER leT COME4TS.'.........................

.BI.7.C.A LM95TD756A.SUP-MD B-N BB.30 SK1AC.6 UT 40704' Sa533 6RB N/A 9.0 9

1 2 1/3 EA PER103 CLI TO SA533 GRB CLI-M.1.1~

M45 TD 9 N-SE B-F B5.40 4.5 '

PI A509 CLI !O' 5.10.00 3

1 2 53166 34.1.11 -

M25 DN MKA33;.N-SE B-F B5.130 SK-15.1 PT. '

A105 GR11 TO 10.9.9

'5 1 2 A376 T316 SURGE LINE '

~

B4.1.12 MK25 ON MA33 N-SE B-F B5.130 SK-15.1 UT 40717 A105 GRII TO 10.9.9 7

1 2 SURSE LINE.

A376 T316 M.I.41 M2 TO mbt R-P B-F B5.130 SK-15.1 PT Blu 63 TO 42.s 2.9 5

1 2

- VENT CO M.

AIM GRC '

N.I.42 M2 TO MRI N-P B-F. 35.130 SK-15.1 IIT 40753 Blu 63 TO 42.3 2.90 7 1 2 VENT CONN.

A!06 SRC _

N.I.43 -

MK-64 TO 63 N-P B-F B5.130 SK-17.1 PT A106 ERC TO 33.5 2.9 5-1 2 DRAl'I.

81M 63 B4.t.44 PK-64 70 63 N-P B-F B5.130 SK-17.1 UT 40733 A106 ERC TO 33.5 2.9 7

1 2 DRAIN.

BIM 63 B4.1.49 M A56 TO 55 P-P B-F

'85.130 SK-17.1

- PT SA376 TP316 33.5 3.0 5

1 2 TO A106 GRC-B4.1.50 MA56 TO 55 P-P B-F B5.130 SK-17.1 UT 40753 SA376 TP316' 33.5 3.0 7

1 2 t

TO Al % SRC 34.1.61

' M-41 TO A-59 : N-P B-F B5.130 SK-17.1 PT -

Bl u 63 TO 33.5 3.0 5

1.

2 PRESS. TAP A106 SRC B4.1.62 M -41 TO A-59 R-P B-F B5.130 SK-17.1 UT 40753 Blu 43 TO

,,3.5 3.3 7

12 PRESS. TAP Al% GRC M.t.63 M A-59 TO 55 P-P B-F B5.130~ SK-17.1 PT A106 6RC TO 33.5 3.0 5~

I 2 5A376 T316 B4.1.64 MK A-59 TO 55 P-P B-F B5.130 ' SK-t?.1 UT '

40734 40753 AIM GRC TO 33.5 3.3 7

1 2 54376 '316 M.t.65 M A49 TO M33 P-E B-F B5.130 SK-12.1 PT SA376 T316 33.5 3.0 5

1 2 TO SA516 SR70 MA49 TO M33 - P-E h, B-F~

85.130 SK-12.1 UT 40753 40734 SA376 T316 33.5 3.3 7

1 2 M.I.M V

TO SA516 GR70 M.I.69 MK41 TO MA40 N-P B-F B5.130 SK-12.1 PT Blu 63 TO 33.5 3.0 5

1 2 PRESSURE A106 ERC M.I.70 MK41 TO M A40 N-P B-F B5.130 SK-12.1 UT

-40753

~ Bl u 63 TO 33.5 3.0 7

.l 2

MIESSURE '

AIM GRC M.I.77 MK 49 70 53~

P-E B-F

'B5.130 SK-13.1 PT SA376 T316 33.5 3.0

.5' 1 2 TO SA516 eevn

-.c

. ~. ~,

,i,..

. ~.,.,.

r-

. ~

r3 r:.,, 7. - > = - - - -

^'

C.,.

. Y ^ o _l

m' s

J (PIPi.......'CDNST.ID.......CF16....CAI.. ITER.N0DNS.......VOLSURFVT. CAL...........MAISPEC....SIIES/T... PROC.PERINTCOMMENTS...........................

e 64.1.75-Mr 49 70 53 P-E

.B-F B5.130' SK-13.1 UT 40734 40753. - SA376 T316 33.5 3.0'

'7~

1 2 TO SA5:6 ER70 84.1.79 M 46 TO 47 HP1 N-SE E-F B5.140-SK-13.1:

PT:

A105 SR11 TO 3.5

.6-5 1 2 A336 CL FBM -

84.1.85 NA61 TO MK55 P-P

-B-F B5.130 SK-16.1 PT '

A106 6EC TO 33.5 3.0 5

1 2 SA376 T316 B4.1.56

- MKr.61 TD ME55 P-?

E-F

' B5.130 SK-16.1 UT 40733 40734 A106 ERC TO 33.5 3.0 7

1 2 SA376 T316 B4.5.132 GH-162 P-E B-J B7.11 SK-1.1 UT PT 40720 A312 T316 12 1.312 5.7 1 2 Bd.5.133 D+1264 E-?

B-J 99.!!

SK-1.2 UT PT 40720 A376 1304 12 1.312.5,7 1

2-B4.5.137 CF-16D P-T B-J

~ 89.11

. SK-3.1 tlT PT 40717 A376 T304 s0 1.000 5.7 1

2-B4.5.138 CF-4A P-E B-J 89.11 SK-3.1 UT-PT 40721 A312 T316 14 1.250 5.7 1 2 B4.5.144 MU-2798 E-P B-J B9.21 SK-4.1 PT A376 T304' 2.5.375 5-1 2 B4.5.145 MU-442 P-E B-J 99.21-SK-4.1 PT A376 T304 2.5.375 5 1 2 B4.5.146 MU-279B P-E B-J B9.21 SK-4.1 PT AI76 T304 2.5.375 5 1 2

' B4.5.147 Mt!-28] A E-P B-J 99.21 SK-4.1 PT A376 T304 2.5.375 5 1 2

' B405.166 MU-247C P-E B-J 59.21 SK-7.2 PT A376 T304 2.5,375 5 1 2 54.5.167 MU-249A P8 B-J B9.21 SK-7.2

.T A376 T304 2.5.375 5 1 2

-84.5.172 MU-253A T-?'

B-J

' B9.21-SK-9.1 PI A312 T316 2.5.375 5 1 2 E*.5 !90 E 36 TG 70 P-M B-J 59.11 SK-15.1 UT MT 40753 A106 SRC SS 42.8 2.7 6.7 1 2 CLAD

.84.5.206 65 TD 67 N-P B-J B9.11 SK-17.1 UT MT 40753 A106 BRC SS 33.5 2.3 6.7 1 2 CLAD B4.5.216 67 TO 45 P-E B-J E9.11 SK-17.1 UT MT 40753 A106 GRC SS 33.5 2.3 6.7 ~ 1 2 CLAD TO SA516 GR70

-SS CLAD B4.5.220 A44 TO 43-P-E B-J 89.11 SK-13.1 UT MT 40753 A10o GRC SS 33.5 2.3 6.7 1 2 CLAD TO SA516 SR70 SS CLAD B4.5.229 53 TO A44 E-P B-J 89.11 SK-13.!'

A106 SRC SS 33.5 2.3 1 2 CLAD TO SA516 GR70-SS CLAD B4.9.233 R 55 TO PU B1 P-PU B-J 99.11 SK-16.1 UT~ PT 40734 SA376 T316 33.5 2.3 5.7

~1 2

64.5.238 A63 TO 62 P-E-B-J B9.11 SK-16.1 UT MT-40753 A106 SRC SS 33.5 2.3

'6.7 1 2 CLAD TO -

SA516 SR70' SS CLAD

-B4.3.247 B0 TO B3

-E-P B-J' B9.11 SK-18.1 UT PT 40717.

A403 T316 TO 10 ~.9 5.7 1 2 A376 T316

~

D,-

s FIFE........ CONST.ID....... CF!S.... CAT.. ITEM.hD D45....... VOL SURF VT. CAL........... MAT SPEC.... SIZE S/T... PROC. PER INT C0 m ENTS.....'.............

4..........

.. d e

54.5.355 53 TG 53 1A IAE-B-1 B9.12 SK-12.1 UT MT-40753' SA516 SR70 33.5 2.3 6.7 1 '2 SS CLAD

24.5.156 53 TO 5! UA GAE.

12-J B9.12 SK-12.1 JT' MT 40753' SA516 SR70 33.5 2.3 6.7 1

2' SS CLAD B4.5.359 M-43 TO 43 IA IAE B-J.

59.12 Sf-13.1 lit MT 40753 SA516 GR70' 33.5 2.3 6.7 1 2 SS CLAD B4.5.I60 -

Mr.-43 TO 43 CA GAE

-B-J B9.12 SK-13.1'uT MT 40753 SA3!& GR70 33.5 2.3 6.7 1 2 SS CLAD 84.5.361 MK-53 TO 53 IA IAE B-J E9.12 SK-13.1 UT MI 40753 SA516 GR70 33.5 2.3 6.7 1 2 SS CLAD B4.5.362 MK-53 TO 53 CA GAE B-J B9.12 SK-13.1 UT MT 40753 SA516 BR70 33.5 2.3 6.7 1 2 SS CLAD B4.5.371 P-E B-J 89.21 SK-19.1 PT AI76 T304 2.5.30 5

1 2 B4.5.378 V-P B-J B9.21 SK-19.1 PT A376 T304 2.5.30 5

1 2 54.5.391 D&B E-P B-J B9.21 SK-19.1 PT 4376 T304 1.5.281 5

1 2 54.5.392 DH-9 P-E B-J-B9.21 SK-19.1 PT

- AI76 T304 1.5.281' 5 1 2 B4.5.40 39 TO 39 IAE B-J B9.12 SK-14.1 UT MT 40753 SA516 ER70- 33.5 2.3 6.7 1 2 SS CLAD B4.5.41 39 TG 39 OAE B-J B?.12 S(-14.1 UT MT 40753 SA516 GR70 33.5 2.3 6.7 1 2 55 CLAD

- 84.6.3.

'23 TO 25 N-P B-J 89.31 SK-15.1 UT MT 40753 A106 GRC TO 42.8 3.0 6.7 1 2 A105 BRIl -

l B6.9.11 MUV-43 MK-18 bit B-6-2 B7.70 SK-4.1 1

N/A N/A N/A 1

1 2 B6.9.12 MUV-43 MK-17 NT

^B-6-2 B7.70 SK-4.1.

I N/A N/A N/A 1

1 2 74.9.13 min-160 MK-18 BLT B-6-2 B7.70 SK-5.2 1

SS 2.5 N/A 1

1 2 h I.it MLN-160 MK-17 NT B-6-2 B7.70 SC-5.2 1

SS 2.5 N/A 1

~1 2

T M 23 MUV-37 MK-18 BLT B-6-2 B7.70 SK-7.1 1

N/A-N/A N/A 1

1 2 B6.9.24 M;N-J7 MK-17 NT -

B-G-2 57.70 Sr 7.1 1

N/A h/A N/A 1

.1 2

B6.9.25 RCV-10 BLT B-6-2 :B7.70 SK-B.1 1

N/A N/A N/A I-1

'2 66.9.26 RCV-10 NT B-6-2 B7.70 SK-B.!

1 N/A N/A N/A 1

-1 2

Cl.l.3.4 56-B MK5 TO 6 S-S C-A C1.10 SK!AC.7 UT 40755 SA516 6R70 N/A 4.2 9

1 2 1/3 EA PERIOD TO SA516 BR70 01.1.7.A D-H COOLER A N-F C-A C1.10 SKIAC.11 UT 40740 SS IB

.70 9

1 2 INLET Ct.l.B.A D-H C00iER B N-F C-A-LC1.10 ~SK!AC.11 UT 40740 SS 19 '. 70 9

1 2 CUTLET C1.2.3.

DH COOLER A N-S C-B C2.ll -SK!AC.ll MT C/S 18.0.40 5

1. 2 IILET -

'C2.1.104 DH-139 V-P C-F

.C5.21 SK-2.1 UT PT 40717 4376 T304 -

10 1.000.5.7'.I 2

C2.1.109 MS-2BB E-P C-F C5.21 SK-101.2 UT MT-40728 A106 6RB-24 '.969-6.7 2 C2.1.110 MS-6J Su-F C-F C5.21 SK-101.2 UT MT 40742:

A106 GRB 6

.800 6,7..

1 2

~

~

. s-

.x

^

-. 4 6.*.

PIPE........ CONST.!E....... CFIS.... CAT..' ITER.N0 DNS....... ' VOL SURF VTi CAL........... MAT SFEC.... SilE 5/T.., fVDC. Pitt INT C9RRENTS...........

l

- C2.1.112 - : MS-12 F-E iC-F-C5.21. SK-102.1 UT MT.

40728.

' A106 GR8 24 969 6.7 1 2

C2.1.115 M5-25C E-P, C-FT C5.21 SK-103.l UT MT 40728 A106 *:B 24

.969-6.7 1

2' C2.1.116 MS-20

'P-E.

'C-F C5.21 SK-103.1 DT' MT 40728 A106 CR3 24

.969 6.7 1 2 C2.1.121 MS-277 P-V

'C-F C5.21 SK-104.2(IT MT 40728 A106 SRB

~ 24

.969 6.7 1-2 C2.1.123 Fu MK-123 TD Fu P-CP C-F C3.21 h-105.1 MT A106 SRB 10.500 6 1 2 Ps-127 C2.1.127 FW-333 V-E C4 C5.21 SK-105.2 UT NT EGNE A!06 GRB 18

.937 6,7 1 2 C2.1.132 FW-336 V-P C4 C5.11 SK-105.2 MT A106 GRB 10

.500 6 I 2 C2.1.133 FF-71

' V-P C4 C5.11 SK-105.2 MT A!06 SRB 6

432 6 1 2 C2.t.138 FW-126A EP C-F C5.21 SK-106.1 !!T MT NONE Al% *RP 19

.937 6.7 1 2 C2.1.140 Fli-1B E-P C-F C5.21-SK-106.1 UT Mi NONE AIO6 SRB 19

.937 6.7 1 2 C2.1.142 Fli-352 E-P C4 C5.11 EK-106.2 MT A106 GEB 10.500 6 1 2 l

C2.1.143 Fe-173B EP C4 C5.11 SK-107.2 MT A106 GRB 6

.432 6 1 2 C2.1.149 FN-1719 P-E C-F C3.11 SE-107.2 MT A106 ERB 6

432 6 1 2 l

C2.1.155 FW-143A P-E C4 C5.!!- SK-103.2 MT A106 ERB 6

.432 6 1 2 C2.1.159 FW-44 P-V C-F C5.11 SK-103.2 MT AIO6 SRB 6

432 6 1 2 i

C2.1.160 Fd-615F P-E C-F C5.11 SK-108.2 MT A!06 SRB 432 6 1 2 C2.1.164 DH-26B E-P C4 C5.11 SK-109.2 PT A358 T304 14.375 5 1 2 l

C2.1.165 DH-32 P-E C4 C5.11 -SK-109.2 PT A358 T304 14.375 5 I

2' C2.1.167 DH-61 E-V C-F C5.11 SK-110.1 PT A!58 T304 14.375 5 1 2 C2.1.171 DH-40C E-P C-F C5 *. SK-110.2 PT A358 T304 14.375 5 1 2 C2.1.173 DH-59F P-E C-F C5. 1 SK-111.1 PT A358 T304 8

.322 5 1 2 C2.1.179 DH-64C E-P C4 C5.11 SK-lit.2 PT A358 T304 14

.375 5 1 2 l

C2.1.180 DH-33A P-E C-F C5.11 SK-111.2 PT A358 T304 14

.375 5 1 2 C2.1.184 DH-43 E-V C-F C5.11 SK-111.2 PT A358 T304

- 12 '.375 5 1 2 C2.1.183 DH-100C E-P C-F.

C5.11 SK-112.2 PT A358 T304 10.365 5 1 2 C2.1.193 GH-97 P-V C-F C5.Il SK-il4.1 PT A3!2 T304 6

.322 5 1 2 C2.1.195 EH-69F P.E C-F C5.11 -SK-114.1 PT A312 7304 8

.322 5 1 2 C2.1.199 M3-61 V-P C-F C5.11 5K-115.1 PT A312 T304 6

.200 5 1 2 C2.1.200 MU-60 E-V C-F C5.11 SK-115.1 PT A312 T304 6

.280 5'

1 2 C2.1.205 MU-23B T-P C-F C5.11 SK-l!6.1 PT A312 T304 6

.250 5 1 2 C2.1.207 Md-240 E-P C-F C3.11 SK-116.1 PT A312 T304 6

.2E0 5 1 2 C2.1.208 50-43 E8 C4 C5.!!. SK-116.2 PT A312 T304 6

.280 5 1 2 C2.1.211 DH-1075 E-P C-F C5.11 SK-113.1 PT A312 T304 to.365 5 1 2 C2.1.281 MS-26C E8 C4 C5.21 SK-103.1 A106 SRB 24

.969 1

'2 C2.1.733 P-V C-F C5.21 'SE-Il7.1 UT PT 40721 A376 T304 14 1.250 5.7 1 2 C2.2.36 GAE C-F C5.12 SK-109.2 PT '

A358 T304 14

.375 5 1 2 C2.2.37 IAE C-F' C5.12.5E-109.2 PT A355 7304 14

.375 5-1 2 C2.2.42 IAE C4 C5.12 SK-109.2 PT A350 T304 14.375 5 1 2 C2.2.43 CAE C-F C5.12 SK-109.2 PT A353 T304 14

.275 5 1 2 C2.2.54 IAE C4 C5.12 SE-119.1 PT A359 T304 14

.375 5

1 2 14

.375 5 I 2

.C2.2.55 UAE' C-F 05.12 SK-!!0.1 PT AI58 T304, 14.375 5-1 2 C2.2.66 GAE C-F C5.12 SK-!!0.2

'PT A358 T304 f

C2.2.67 IAE

.C-F C5.12 SK-110.2

'PT A358 T304-14.375 ~ 5 1 I C2.2.77 IAE C4 C5.12 Sk-111.2 PT 5358 T304: 14.375 5 1 2 C2.3.8 MS-6E P-Su

. C-F C3.31.5K-101.2 MT.

A106 SRB 2416.969 6

1 2 C2. 3.9 M5-17D F-5d C-F C5.31 ' SF-102.2.

MT A106 GR9

'2416.969'. 6 1 2

LunisI in.- C1. CAT... HasEn c...... m............ : 5T... not.. vi. PER Ini ama.5...................

~

y.

!B4.10.109 1 F-C

- swi-11:

5G-1.1

' SP 3.4 3.4 1 2

.~

"i-12 StH-1.2 A

3 1 2 B4.10.115 1 F-A F4.1(.14B 2 1 2 54.10.180 t F-B MUH-13 5G-6.2 R

33 1 2 B4.10.159 ! F-B Muti-9

'SG-7.2 R

.'3 12 B4.10.191 1 - F-B - MUH-7 SrH-7.2.

R 33 1 2 B4.10.195' Mi!H-4

~1 2: REMOVED FPC B4.10.20B

1. F-B MOH-55 SKH-9.1

~R 33 1 2 54.10.210 1 F-B MUH-59 StH-9.1" R

33 1 2 54.10.213 1 F-B MiH-52 SKH-9.1 R

33 1 2 B4.10.220 1 F-B MbH-65 5G-9.2 R

33 1 2 B4.10.222 1 F-B MUH-68 SKH-9.2 R

33 1 2 E4.10.225 i F-B DHR-1 SKH-1.1 R

33 1 2 B4.10.226 1 F-B DHR-2 SkH-1.1 R

33 1 2 C2.5.1 2 C-C M5H-158A SrH-101.1' ATT 6

1 2 ATT 1.0*

i C2.6.1 2 F-C MSH-158A SG-101.1 SP 3.4 3.4 1 2 C2.6.10 2 F-B MSH-23 SKH-103.1 R

33 1 2 C2.6.12 2 F-B MSH-247 SG-104.1 R

33 1 2 C2.6.121 2 F-C DHH-560 SKP-112.2 SP 3.4 3,4 1 2 C2.6.123 2 F-B DHH-557 SFH-112.2 R

33 1 2 C2.6.134 2 F-B 5HH-529 SKH-114.1 R

33 1 2 i

C2.6.137 2 F-B DHH-533 StH-114.1 R~

33 1 2 C2.6.179 2 F-5 MSR-16 SEH-101.1 R

3 1 2 C2.6.190 2 F-B MSR-39 SFH-101.1 R

33 1 2 C2.6.200 2 F-B M5H-155 SKH-102.1 R

1 2 INSPECTED DURING R7

1 C2.6.204 2 F-C MSH-153 56 H-102.1 SP 3.4 3.4 1 2

C2.6.237 2 F-B MSH-148 SG-104.1 6

33 1 2 C2.6.241 2 F-B MSR-47 SKH-104.1 R

33 1 2 C2.6.244 2 F-B M5R-20 SF.H-104.1 R

33 1 2 l

C2.6.261 2 F-B EFH-11BA SKH-107.1 R

33 1 2 C2.6.263 2 F-B EFH-120A StH-107.1 R

33 1 2 C2.6.287 2 F-B EFH-26A SKd-108.1 R

33 1 2 C2.6.294 2 F-C DHH-543 SG-109.1 SP 3.4 3.4 1 2 C2.6.295 2 EHR-22 58-109.1 Ii

! 2 INEED DWG C2.6.298 2 F-A DHA-7 SKH-109.1 A

33 1 2 l

C2.6.302 2 F-B DHR-32 SKH-109.2 R

33 1 2 C2.6.305 2 F-B DhH-567 SKH-109.2 R.

33 1 2 C2.6.307 2 F-B DHH-591 SKH-110.1 R

33 1 2 C2.6.311 2 F-B DHR-20 SLH-110.2 R

33 1 2 C2.6.315 2 F-B DHH-579 SKH-110.2 R

-33 1 2 l

l l

I

.~.m

CIGUE ID. EL CAT... HANGER C2...... Bu6............ ST... PROC.. VT. PER INT REMARKS.......................

C2.6.325 2 F-B DHH-537L

.. SG-112.1 A

.3 3 ' 1 2

.C2.6.327 2 F-B DHH-558.

SG-112.2 R

.33 1 2 C2.6.329 2 F-B DHH-556A SKH-112.2

'R-

'! 3 1 2 C2.6.330 2 F-B DHR-45

.SKH-112.2

.R~

33 1 2 C2.6.331 2 F-B DHH-554-SKH-112.2 R

33 12 C2.6.333 2 F-B DHH-594 SG-113.2 R

3'3 1 2 l

C2.6.337 2 F-B DHH-589 SKH-113.1 R-33 1 2 C2.6.338 2 F-B DHR-38 SKH-113.1' R-1 2 litSPECTED buRING R7 l

~C2.6.340 2 F-C DM-592 SKH-113.1 SP 3.4 3,4 1 2 l

C2.6.342 2 F-B MUH-812 SKH-115.1 6

33 1 2 C2.6.344 2 F-B M -530A SKH-115.1

'R

.3 3 1 2 i

C2.6.346 2~F-B M -903 SKH-115.1 R

33 1 2 C2.6.348 2 F-B M -823 SG-115.2 R

33 1 2 j

C2.6.350 2 F-B M -822 SG-115.2 R

33 1 2 C2.6.354 2 F-B MUH-529 SKH-115.2 R

33 1 '2 l

C2.6.366 2 F-B MUH-805 SKH-116.2 R

33 1 2-C2.6.373 2 F-B RUH-810 MH-!!6.2 R

33 1 2 i

l C2.6.374 2 F-B MUH-904

'SKH-116.2 R

33 1 2 C2.6.377 2 F-B M""-834 SKH-!!6.1 R

33 1

~2 C2.6.390 2 F-B Mur.-502 SKH-116.1 R

33 1 2 C2.6.385 2 F-B FWR-19 SKH-105.1 R

33

,1 2

C2.6.391 2 F-B FWR-21 SKH-105.1 R

33 1'

2 C2.6.407 2 F-B

-FWR-16 SKH-106.1 R

33 1

-2 C2.6.432 2 F-B MUH-509 SKH-116.2 R

33 1 2 C2.6.93 2 F-C DHH-549A SKH-109.1 SP 3,4 3,4 1 2 D1.1.103 3 F-B SWR-116 SKH-206.1 R

33 1 2 D1.1.12 3 F-8 SW-184 SKH-202.1

'R 1 2 JtSPECTED DURIN6 R7 Ot.1.121 3 F-B SW-560 SKH-206.1-R 33 1 2 i

D1.1.12C 3 F-B SWR-115 SKH-207.1~

R

I 3 1 2 D1.1.141 3 F-B SWR-111 SKH-207.1 R

33

.1-2 DI.I.159 3 F-B

.SW-163 SKH-208.1 R

33 1 2 D1.1.172 3 F-B SuH-28A SKH-208.1 R

33 1 2 D1.1.174 3 F-B SW-95 SKH-209.1 R

'33 1 2 D1.1.177 3 F-B SWR-35 SKH-209.1 R

33 1 2 D1.1.2 3 F-B DCR-42 SKH-201.1 R

I3 1

-2 D1.1.200 3 F-B Su-10 SKH-209.1-R 33 1 2 D1.1.204 3 F-B SW-70 SKH-210.1 R

33 1 2

. 4 wm

,m

-r

-r g-

.-,r-.m,,

1 m

~&n w r

--we

-mm x

e S'd

- - - ~

v.

~.mo

-m

P tin I GUE I D. EL CAT... hah 5ER C...... DWG............ S T... PE OC.. VT. PER I NT REMAf15.......................

ED1.1.219 3 F-B SuR-4 5 01-210.1 R'

33 :1-2

'DI.1.231 3 F-B

.5 6 -47 5KH-210.1 R

33 1 2 D1.1.241

.3 F-B SWH-3~

StH-211.1 R

33 1 2 51.1.25 3 F-B SWH-210 9"-202.1 33 1 2

D1.1.253 I F-B CHR-3 501-212.1 R

33 1 2 D1.1.265

'3 F-B RWH-13 SKH-213.1 R

33 1 2 D1.1.2e8 3 F-B RNH-7A

- SKH-213.1 R

33 1 2 01.1.283 3 F-B FuH-24B '

SG-213.1 H

33 1 2 51.1.295 3 F-C-RWH-45 SG-214.1 SP 3.4 3.4 1 2 D1.1.307 3 F-B RWH-53 SKH-214.1 R

33 1 2 01.1.323 3 F-B RWH-1, SKH-214.1 SP 3.4 3.4 1 2 D1.1.336 3 F-B RWH-75 SKH-215.1 R

33 1 2 D1.1.346-3 F-B RkH-10 SKH-215.1

~R 33 1 2 D1.1.354 3 F-B SFH-524 SKH-216.1 5

33 1 2 D1.1.370 3 F-C MSH-185 StH-217.1 SP 3.4 3.4 1 2 DI.1.396 3 F-B SbH-43 SKH-218.1 R

1-2 INSPECTED DUR1W6 R7 D1.1.404 3 F-B SWR-40 SKH-219.1 R

33 1 2 D1.1.407 3 F-B SWH-103 SKH-219.1 6

33 1 2 D1.1.425 3 F-8 SWR-127 SKH-220.1 R

33 1 2 01.1.438 3 F-B Shri-99 SKH-221.1 R

1 2 INSPECTED DURING R7 DI.1.455 3 F-8 SWR-142 5KH-221.1 R

33 1 2 D1.1.458 3 F-C SWH-81 SKH-221.1 SP 3.4 3,4 1 2

01.1.46 3 F-B SWR-193 SKH-203.1 R

33 1 2 01.1.477 3 F-B SmH-9 StH-222.1 R

33 1 2 D1.1.496 3 F-B DHH-617 SKH-223.1 R

1 2 INSFECTED DURING R7 D1.1.499 3 F-B DHR-55

- SrP-223.1 R

33 1 2 D1.1.528 3 F-B SWH-185 StH-224.1

.R

.33 l'

2 D1.1.531 3 F-B SWH-106 SFH-224.1 R.

I 2 D1.1.539 3 F-B SFH-559 SKH-2'B.1 5-33 1 2 DI.1.540 3 F-B SFR-5 SVH-228.1 R

33 1 2

D1.1.564 3 F-B DCH-150 SKH-227.1 R

33 1 2 D1.1.582 3 F-B SWR-220 SFH-226.1 R

33 1 2 DI.I.592 3 F-B SWR-223 SKH-226.1' R

33 1 2 Dt.1.598 3 F-B SFR-19

' SKH-225.1-R 33 1 2 D1.1.606 3 F-B SFR-26 5KH-225.1

'R 33 1 2 D1.1.61 3 F-B SWR-198 SKH-203.1 R

33 1'

2 D1.1.65 3 F-C SWH-216 SKH-204.1 SP 1 2 INSPECTED DURING R7 Dt.1.82 3 F-B SWH-67 SFH-205.1 R

33-1 2 D1.1.69 3 F-B SWH-35 SKH-205.1 R

33 1 2 2_

-.~

~

e S M RY OF FPC' INSERVICE TESTING i

REFUEL VII The following is a summary of inservice tests completed during Refuel VII. Details of the testing completed by Florida Power Corporation are contained in plant files and are available upon request.

Relief Valves Set Point Tested 4 Main Steam Reliefs' 20 System Reliefs' 2 Pressurizer Reliefs' Hydrostatic Tests Fifteen (15) Hydrostatic tests were scheduled for completion during the first forty month period of this second interval. Those 15 Hydrostatic tests were completed as scheduled. One (1) additional Hydrostatic test was also completed. All Class 1 piping was also Hydrotested.

Inservice Pressure Tests All Class 2 and 3 systems that were not scheduled to be Hydrostatically tested during this perhd have been subjected to an Inservice Leak Test.

Snubbers Visual examination was completed on 100% (269) of the Safety Related Snubbers.

Fifteen percent (15%) of the snubbers (42) have been functionally tested.

l l=

. NIS-2 Forms Eight (8) NIS-2 Forms for Repairs or Replacements completed since the last refuel L

(Refuel VI) have been included. The associated Code required Pressure tests and Pre-service NDE has been performed.

4 0

1

i c :-

' listing of Section XI Code Cases Used i

Code Case N-416 Alternative rules for Hydrostatic testing of Repair or Replacement of Class 2 piping.

Code Case N-424 Oualification of Visual Examination personnel Code Case N 356 Certification period for Level III NDE personnc'.

i f

Reactor Coolant Pump Examinations e

Volumetric examination was performed on ten (10) newly installed reactor coolant pump studs and visual examination was completed on RCP-1A casing interior during the March 1989 outage.