PROPOSED CONFIRMATORY AND RADIOLOGICAL SURVEY PLAN FOR TIIE NUCLEAR LAKE SITE PAWLING, NEW YORK INTRODUCTION AND SITE HISTORY Nuclear fuels processing and research tegan in 1958 at a site near Pawling, New York, known as Nuclear Lake. Initial operations were performed by Nuclear Development Corporation; subsequently, the site was owned and operated by United Nuclear Corporation and Gulf United i
Corporation. Uranium oxide fuels of various U-235 enrichments were fabricated and tested at the site. Fuels utilizing thorium and plutonium were also fabricated and tested. The testing facilities at the site included several small experimental reactors. In 1972, activities at the site were discontinued and the site was decontaminated and surveyed. A report, indicating that the facilities satisfied the criteria for de.~.nmissioning, was prepared by ATCOR-.' The Nuclear Regulatory Commission license for the site was then terminated in 1975. The property was acquired in 1979 by the National Park Service (NPS) for the purpose of relocation of the.
Appalachian National Scenic Trail (ANST).
The NPS contracted Nuclear Energy Services (NES) to conduct additional surveys of portions of the property. Results of that survey, presented it i July 1984 report, identified a small area of resiNal contamination in the former Waste Disposal Building.: No other evidence of conto a in excess of the limits for unrestricted use was noted.
However, studies and reviews by the Nuclear Lake Management Committee, a local citizens group, raised concerns regarding residual contamination in building drains, septic tank and drain field systems, sediment in Nuclear Lake, and building interior paint.' The possibility that containers of radioactive or other hazardous wastes were discarded into Nuclear Lake was also N
indicated by the Management Committee.3 As a result of these concerns, the. PS requested tha't Prepared by the Environmental Smvey and Site Assessment Program, Energy / Environment Systemt. Division, Oak Ridge Institute for Science and Education, under interagency agreement (NRC Firt. No. A-9093) between the U.S. Nucicar Regulatory Commission and the U.S..
Department of Energy.
Natleer lake 5dr. A,embe, 16 1993 htasapWlanninuclear.lakyswling.001 9311120D44 930916 U
PDR ADOCK 07000903 h.
C PDR 8
a a
m
~ i-~ -
-w.-
t a
l the Environmental Survey and Site and Assessment (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE), then known as the Radiological Site Assessment Program of.
j Oak Ridge Associated Universities, conduct investigations and radiological surveys of the site l
that would address these concerns. The survey was conducted during September 1986 and the-
--i results provided in a July 1988 report.'
The survey identified alpha and/or beta surface activity levels in buildings which exceeded the -
NRC surface contamination guidelines. In addition, several soil samples. contained elevated-.
levels of plutonium and Cs-137. Electremagnetrometry and ground penetrating radar studies, which were conducted concurrently with the 1986 survey, identified a number of anomahes a'
within Nuclear Lake itself. Radiation Technical Services performed an underwater investigation of these anomalies, during November 1992. The investigation was unable to substantiate that any of the animals were the result of metal drums being present in the Lake as originally I
1 suspected.5 i
l The site has remained. in caretaker status pending decontamination and demolition of site l
buildings and excavation of contaminated soils. Chevron USA, Inc., under a con'sent agreement j
with the NRC, contracted NES to characterize and perform remediation of contaminated building j
surfaces and soils at' the Nuclear Lake Site. Structural decon> amination was limited to the I
Plutonium Facility and the Multiple Failure Building. Remediation of site soils was performed within the vicinities of the Plutonium Facility, Waste Disposal Building, and Shield Mock-up.
I Building. NES then performed final status surveys of the remediated building and soil areas.
l The NRC's Division of Low Level Waste Management has requested that the Environmental l
Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and l
Education (ORISE) perform a confirmatory sutvey of the remediated portions of the Nucicar j
P Lake Site. In addition, ESSAP has been requested to perform radiological surveys'of those j
unaffected buildings and open land areas where previous surveys did not any identify significant contamination.
l i
t l
ww.m. s= - www n im 2
h w.cw w w.o e..u= =
c
~
r n
0 i
SITE DESCRIPTION The Nuclear Lake Site is located off of Old State Route 55 between the towns of Pawling and -
Beckman in the eastern portion of New York State. The 460 ha (1136 acre) site is heavily wooded with the exception of the 20 ha lake; clearings in the-vicinity of the recently '
1 reconstructed dam, which impounds the lake at its southern end; the central portion of the site,.
f where eight of the nine original site buildings are located; and near the entrance to the site, t
where the ninth building is located.
I i
The site history indicates that of the nine buildings, only four may have been potentially used -
2 2
i for the processing or storage of radioactive materials. These buildings are the 700 m (7500 ft ),
2 2
Plutonium Facility, the Waste Disposal Building (39 m ), the Shield Mock-up Building (60 m ),
and the Critical Facility (510 m ).
The 1986 radiological survey identified residual 2
contamination above the NRC guidelines in the Plutonium Facility, a small area in the Multiple l
Failure Building, and one measurement location, remediated at the time of the' survey, in the Critical Faci}ity. The other buildings located on.the site include the Engineering Building (410 m ), the Lodge, and a house currently occupied by the site caretaker that was previously 2
2 known as the Remote Assembly Building (106 m ),
3 OBJECTIVES The objectives of the confirmatory survey are to validate the results of the NES final surveys by providing independent document reviews and sufficient data to evaluate the radiological status of the buildings and surrounding soil areas. The radiological survey will be performed to supplement previous survey results and gather additional data, for use by the NRC in.
determining the radiological status of the remainder of the property.
RESPONSIBILITY Work described in this survey plan will be performed under the direction of Michele Landis, Project Manager and Tim Vitkus, Project leader with ESSAP. The cognizant site supervisor has i
Nancef Imke Nic Acptember 16,1993 3-Ase. rvi s==ie r.i ur -tins.coi
.i
- i the authority to make appropriate changes to the survey procedures as deemed necessary.'_ After ~
f
- i consultation with the NRC site representative, the scope of the survey plan may be altered as-l the survey progresses. Deviations to the survey procedures or this plan will be documented in
[
the site log book.
]
DOCUMENT REVIEW r
ESSAl' has reviewed the NES work plan for soil remediation, the decommissioning plan for the.
Plutonium Facility and Multiple Failure Building, final release survey plan, and final survey-l report and supporting documentation concerning site characterization and remediation activities.6W Information was evaluated for accuracy, completeness, and compliance with j
guidelines. Comments for each document were provided to the NRC..it.12 SURVEY PROCEDURES A survey team from ESSAP'will visit the Nuclear Lake Site and perform. visual inspections,.
~.
measurements, and sampling.. Survey activities will be conducted in accordance with the ORISE i ESSAP Survey Procedures. The procedures applicable to this survey are listed on pages 11 and 12 of this survey plan. The scope of the surveys performed for various portions of the site will be objective dependent. Confirmatory survey procedures will be implemented for remediated portions of the site and radiologi. # surveys procedures, designed to meet draft NUREG/CR-5849 requirements, for the remaining portions.
CONFIRMATORY SURVEY PROCEDURES: INTERIOR q
The following procedures will be used for interior surveys of the Plutonium Facility, the Waste
~
Disposal Building, and the Multiple Failure Building.
J
- hieu 14e site. squemer 16,1993 4
i+.arvimuweks.1styswiingm01 '
0 l
9
- Reference Grid
~
ESSAP will use the im x 1m termination survey grid system established by NES for referencing measurement and sampling locations. This grid system has been installed on the floor and lower walls (up to 2 m) of each room. Upper walls and ceilings, with the exception of 2 rooms in the -
Plutonium Facility, were not gridded.
Measurements and samples collected from ungridded surfaces will be referenced to the Door-and/or lower grid or to prominent building features.
3 SurfitCLStan_s q
Surface scans for alpha, beta, and gamma activity will be performed over 100% of floor and
{
lower wall surfaces located in the Waste Disposal Building, eastern portion of the Plutonium Facility (Rooms 2-5,14, and 15), and southern portion of the Multiple Failure Building,1where remedial actions were concentrated.- Surface scans of non-remediated portions of the Plutonium Facility (Rooms 1, 6-13,16-18), and the northern portion of the Multiple Failure Building, will.
range in -coverage from 50 10 100% dependent upon findings as the. survey _ progresses.
Particular attention will be given to cracks or joints in the floors and walls, ledges, drains, and q
other locations where material may have settled or accumulated. Scans will be performed using gas proportional, ZnS, GM, and/or Nal detectors coupled to ratemeters or ratemeter-scalers with.
audible indicators. Locations of elevated direct radiation, detected by scans, will be marked for-further investigation.
t Surfare Acthity_Mrasurements d
Direct measurements for total and removable alpha and beta activity levels will be performed in a minimum of 10% of randomly selected floor and lower wall grid blocks. Additional direct-2 measurements will be performed every 20 m on upper wall and ceiling surfaces and at locations 1
of elevated direct radiation detected by surface scans. Direct measurements will be made using gas proportional, ZnS, or GM detectors coupled to ratemeter-scalers locations with alpha or Nm3rar taks Sne. Scepw9er 16,1993 5
h:v. r ri a.w-ie rm.-i e ooi -
s e
3
.~
i beta surface activity levels, which exceed the NRC average surface activity guideline, will be investigated in accordance wit Draft NUREG/CR-5849 to determine the average surface -
2 activity levels in the contiguous 1 m area.
A smear sample for determining removable activity levels will be' collected from each direct measurement location.
Exposire Rate Measurements l
1 Exposure rate measurements will be performed within each room of the Plutonium FLity and in the center of the Multiple Failure Building. Exposure rates will be measured at 1 m above
{
the floor using a pressurized ionization chamber (PIC).
Subfloor Soil Sainnling t
i Soil samples will be collected from subfloor areas within each building. Sampling locations will be selected in the field based on potential contaminant migratory pathways such as drains.or expansion joints. Samples will be collected at an approximate frequency ~ of 1 per 25 m of 2
affected floor area and 2 samples in unaffected portions of the Plutonium Ruilding.
I CONFIRMATORY SURVEY: EXTERIOR l
The following procedures will be applicable to the perimeter soil areas associated with the Plutonium Facility, the Waste Disposal Building and the Shield Mock-Up Building.
l B
Reference Grid i
If the reference grid established by NES for characterization and remediation is intact at the time of the confirmatory survey, ESSAP will reference measurement and sampling locations to this.
grid. Otherwise, ESSAP will use prominent building features to reference measurement and sampling locations.
Nuclear the Nte - hertemhe 16,109)
' [)
h:\\easap\\plansinuclear.lak)=wlmg.001.
(
i
a :,.
'l 1
Surface Scans Surface scans for gamma activity will be conducted over the exterior grounds of the affected buildings extending out to a distance of 10 m.
Surface scans will be perform.
aing Nal '
detectors coupled to ratemeters with audible indicators. Locations of elevated direct radiation r
detected by scans will be marked for further investigation.
Soil Snmoline Soil samples will be collected from remediated areas; locations contiguous with the remediated areas; any locations of elevated direct radiation, detected by scans; and from 5 randomly selected 2
grid blocks (locations). Samples will be collected at intervals that are representative of 100 m areas. The sampling intervals will be performed in a manner that will permit approximating the 2
average radionuclide concentration levels over 100 m areas if necessary.
Exposure Rate Measurements J
Exposure rate measurements will be made at each soil sampling location. Measurements will be made at I m above the surface using a PIC.
t RADIOLOGICAL SURVEY PROCEDURES: INTERIOR The procedures described below are applicable to the interior of the following buildings:
Engineering Building, Shield Mock-Up, Critical Facility, the Lodge, and the Remote Assembly Building.
Itercrence Systen)
ESSAP will use prominent building features to reference measurement and sampling locations.
8
.Nwkar 14e Siw + Whr 16, IW3 7
kWgykhwhtMWMW R4 j
_, _. ~
j
.t
.a r'rface Scatn5 l
Surface scans for alpha, beta, and gamma activity will be performed over a minimum of 10% '
t of the floors and lower walls (up to 2 m). Additional scans will be performed in drains, cracks, on ledges, or other locations where material may have settled or accumulated. Scans will be f
performed using gas proportional, ZnS, GM, and/or Nal detectors coupled to ratemeters or
}
ratemeter-scalers with audible indicators. Locations of elevated direct radiation, detected by.
scans, will be marked for further investigation.
j i
Surface Activity Measurements Direct measurements of total alpha and beta surface activity will be performed at 30 measurement locations within each building. Direct measurements will be performed using gas'~
.i proportional, ZnS, and/or GM c'etectors coupled to satemeter-scalers. Smear samples for determining removabic activity levels will be collected from each direct measurement location.-
Should direct measurements identify surface activity levels in excess of 25% of the guidelines,_
j then the scope of the survey may require alteration-a Jhnosure Rate Mensurenltnis t
Exposure rate measurements will be made in each building. NUREG/CR-5849 recommends that i
an exposure rate measurement be performed at each direct measurement location; however, the j
small size of most of the site buildings may not necessitate this measurement frequency.
i Therefore, a minimum of one measurement will be made per building or room, whichever is i
applicable. Additional exposure rate measurements will be made at locations of elevated direct radiation detected by gamma surface scans. Measurements will be made at I m above the surface using a PIC.
]
I I
i Nuclear Iake Site. Septender 16, 1993 8
h:tenanp\\ plans \\ nuclear.lakipawling.001 i
,i
(
Subfloor Soil Samoline Subfloor soil samples will be collected from 2 locations within each building. Locations will be selected based on the presence of potential migratory pathways such as expansion joints and drains.
RADIOLOGICAL SURVEY PROCEDURES: EXTERIOR The following procedures will be used for unaffected portions of the site associated with buildings, roads, walkways, and the dam area.
Reference System The unaffected outdoor areas will be subdivided into 4 survey units (Figure 1). ESSAP will establish a grid system consisting of-50 x 50 m grid blocks to reference-measurement-and=
sampling locations within each survey-unit. Prominent site features or-structures may also be
- used for reference.
Surface Scans Surface scans for gamma activity will be conducted over approximately 10% of the cleared -
portions of the site. Scans will be concentrated in those areas associated with the buildings, roads, walkways, and clearings. Scans will be performed using Nal detectors coupled to ratemeters with audible indicators. Locations of elevated direct radiation detected by scans will be marked for further investigation.
Soil Sampling Surface (0 to 15 cm in depth) soil samples will be collected from 30 locations within each of the 4 survey units. Subsurface samples,1 meter in depth, will be collected from a total of 30 of the surface sampling locations. Each of these sample boreholes will be logged A. gamma Nuckar lake sne. Sqqcmbre 16.1993.
9 amew.*mw.uw-wm
4 activity using a Nal detector coupled to a ratemeter, and additional soil samples collected from depth intervals where elevated gamma radiation is identified. An additional 30 surface soil -
samples will be collected from land areas outside of the buildings' perimeter. Soil sample.
locations will be systematically selected throughout the site or will be located at suspect locations 1
that were identified during surface scans. The sampling intervals will be performed in a manner e
that will permit approximating the average radionuclide concentration levels over 100 nf areas.
{
Exposure Rnte Measurements i
Exposure rates will be measured at I m above each soil sampling locations using a PIC or Nal detectors cross-calibrated with a PIC.
SAMPLE ANALYSIS AND DATA INTERPRETATION Samples and data will be returned to ESSAP's Oak Ridge, Tennessee facility for analysis and-interpretation. Smears will be analyzed for gross alpha and gross beta activity with a low.
y background proportional counter.
Soil samples will be individually analyzed by gamma-
[
t spectrometry. The spectra will be reviewed for uranium, thorium, americium, cesium and any i
other identifiable photopeaks. Individual samples and/or composite samples, representing groups I
of up to 10 samples, may also be analyzed for isotopic plutonium by alpha spectrometry.
Individual samples selected for alpha spectrometry will be based on the gamma spectrometry j
results.
i The smear analytical results and direct measurement data will be converted to units of
-l dpm/100 cm and exposure rates in pR/h. Soil results will be reported in pCi/g. This data will
]
2 be compared to the final survey results provided 1.y NES and the NRC generic and site specific l
guidelines ' The site exposure rates and radionuclide concentrations in soil will also be compared with the background data previously collected.' The radiological survey data will be -
statistically evaluated and formatted in accordance with NUREG/CR-5849. The results will be provided in a draft report and submitted to the NRC for review and comment.
1 i
Nucket 14e &w 6epwmter 16, !W3 10 hhpWWawkarMpsw!q.MI
]
q l
i
,a l
GUIDELINFS t
The applicable contaminants identified at the site are plutonium and Cs-137. The guidelines for plutonium are as follows:
Total Activity 2
2 100 dpm/100 cm, averaged over a 1 m area 2
2 300 dpm/100 cm, maximum in a 100 cm area Removable Activity i
2 20 dpm/100 cm The surface contamination guidelines for Cs-137 are those for beta-gamma emitters (radionuclides with decay modes other than alpha emission or spontaneous fission) except Sr-90.
These guidelines are:
Total Activity 2
2 5000 dpm #-y/100 cm, averaged over a I m area :
2 2
15000 dpm S-y/100 cm, maxir..um in a 100 cm area Removable Activity j
2 1000 dpm S-y/100 cm The site specific soil concentration guidelines are 25 pCi/g and 15 pCi/g for plutonium and Cs-137, respectively.
The exposure rate guideline currently being used by the NRC is 5 R/h above background.7 l
2 TENTATIVE SCIIEDULE l
Measurement and Sampling September 20'-25,1993 Sample Analysis September 27-October 8,:1993.
I Nuc kor Lake Nic. Septcmier 16, 1993 11 h %emp' plans'muckar.lak \\pewimg.001 l
l i
Draft Report.
October 13, 1993 Final Report October 29,1993 i
LIST OF CURRENT PROCEDURES TO BE USED IN TIIE SURVEY Applicable procedures from ORISE ESSAP Survey Procedures Manual (Revision 7; May 31, 1
1992) include:
Section 5.0 Instrument Calibration and Operational Check-Out 5.1 General Information 5.2 Electronic Calibration of Ratemeters 5.3 Gamma Scintillation Detector Check-Out and Cross Calibration 5.4 Alpha Scintillation Detector Calibration and Check-Out 5.5 GM Detector Calibration and Check Out 5.6 Proportional Detector Calibration and Check-Out 5.7 Pressurized Ionization Chamber Calibration and Check-Out 5.9 Floor Monitor Check-Out 5.13 Field Measuring Tape Calibration Section 6.0 Site Preparation 6.1 Clearing to Provide Access 6.2 Reference Grid System Sem _n 7.0 Scanning and Measurement Techniques 7.1 Surface Scanning 7.2 Gamma Logging of Boreholes 7.3 Alpha Radiation Measurement 7.4 Beta Radiation Measurement 7.5 Gamma Radiation (Exposure Rate) Measurement Section 8.0 Sampling Procedures 4
Nu:kar take $c Lytember 16,1943 12 N@nsW4wMrswHng21
o
,4
, ; f.'
j i
-i
- 8. I'-'
Surface Soil Sampling.
8.2
. Subsurface Soil Sampling -
q i
8.7 Determination of Transferable Contamination i
8.9.
Sample Identification and Labeling l
1 Section 9,0 Integrated Survey Procedures 9.2 General Survey Approaches and Strategies 1
i i
-t Section 10.0 Health and Safety and Control of Cross Contamination l
i Section 11.0 Quality Assurance and Quality Control 5
9 l
B I
o i
t
.i
'I
~
l r
F
.; r ii
'f
-i i
?
?
I
-1 I
t
.i t'
n;se. r ci.n.w.cie r.uiv i.ns.txit
,j Nmicar Lake Sne - September 16, 1993 13 s
'l
-h i
- w..
i-
- 'GUP22.
i 5
.' -Q'.;,
-w M
NJt1rPti
/5
- =
,.g,
[l
.. ~.......
1,.i "MM MC,LAR Ly[
D4.,
egg-l.
,h
.,'.; y :
,.....y y
.f.,
5 n:5%}d S n.g p,a
- TJ ij
[gg
>, p;:8, * #.g.t.ls,
.nyn e
avstate
. m.
%:: ' > t:T ;
~
74.
- t
'o
.u\\%. %y!2Xb ftWS MA$
Wu
'MWp &y;;
f
%;g:2:g.. 9. >...
s J'
' y,sxigyrf k'h,h
.$::4 &): '..^m. tt:%
h2ka nfM sew'4th.44.,.nu s. a bW!Cf%% gi.yt.;.
f*.'_
g,,
'1e j:j.-M%>enG%L w
$;&AC
,4>.K @$$ ?r.y g;s;;.
se r)
"::$tL4%b;,:#fL R 2r49%;g.
. yggt H_
(f ikXa njes%,v.fiQg F
n't.
%&.d.%'t;wi;f;'@y.:
[
f*EN M
EiV4.i:.i bi%# W:&:9 ':4 4
/
% %7::M f;&it,<, * ;
ww%s
'. iOlt;.' r 4,.w
%::f:gs) y,4 g:-)
'y:pi:;t M,
_.y 22?L n.v}f oamorm g-Poupet1 Pat N
n I
8 SURVEY Ut#T h
NOT TO SCALE s
1 FIGURE 1: Map of the Nuclear Lake Site - Plot Plan and Proposed Unaffected Outdoor Survey Units sur tee se - sq.nau i6. im I4 w...r,w. war.i.u, w.mu r
i i
REFERENCES (Continued)
REFERENCES 1.
ATCOR, Inc., " Final Survey R.esults After Decontamination, Gulf United Nuclear Fuels Corporation Plutonium Facility, Pawling, New York", January 1974.
2.
Nuclear Energy Services, "UNC Facility Survey and Radiological Analysis", July 1984.
-l 3.
Letter from C. W. Gillert, Acting Chairperson, Nuclear Lake Management Committee f
to D. A. Richie, United States Department of Interior, July 1985.
4.
Oak Ridge Associated Universities, " Radiological Survey of the Nuclear Lake Site, Pawling, New York", July 1988.
5.
Radiation Technical Services, Inc. " Underwater Investigation of Nuclear Lake".
6.
Nuclear Energy Services, " Work Plan for the Soil Remediation of the National Park I
Service Property Located Near Pawling, New York for the Chevron USA, Incorporated",
November 1992.
l 7.
Nuclear Energy Services, " Decommissioning Plan for the Plutonium Facility and i
Multiple Failure Building of the National Park Service Property Located Near Pawling, New York for Chevron USA, Incorporated", February 1993.
5 8.
Nuclear Energy Services, " Final Release Survey Plan of the National Park Service'-
j Property Located Near Pawling, New York for Chevron USA, Incorporated", May 1993.
9.
Letter from T. J. Vitkus, ORISE to M. Nalluswami, U.S. Nuclear Regulatory Commission, " Comments on the Work Flan for Soil Remediation of the National Park Service Property, Imcated Near Pawling, New York for the Chevron USA, incorporated", December 9,1992.
10.
letter from M. R. Landis, ORISE to M. Nalluswami, U.S. Nuclear Regulatory l
Commission, " Comments of the Decommissioning Plan for the Plutonium Facility and Multiple Failure Building of the National Park Service Property Located Near Pawling, New York for Chevron USA, Incorporated", March 18,1993.
j 11.
Ietter from M. R. Landis, ORISE to M. Nalluswami, U.S. Nuclear. Regulatory
[
Commission, " Comments on Final Release Survey Plan, National Park Service Property, Pawling, New York", March 30,1993.
12.
U.S. Nuclear Regulatory Commission, " Guidelines for Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use of Termination of License for Byproduct, Service, or special Nuclear Material", August 1987.
l Nau Lac sae - s ormwr 16, im 15 m-rwmaa -ww n
r
4 REFERENCES (Continued) i 13.
U.S. Nuclear Regulatory Commission, " Guidance and Discussion of Requirement for an
-l Application to Terminate a Non-power Reactor Facility Operating License," Revision 1, j
September 1984.
?
I r
h j
9 t
r l
,f -
a i
i f
f Nudter IMLc Str = Segember 16,199)
}h hbupWdaEMMpm6ng.MI j
., 7..
t I
APPENDIX A
-I NUCLEAR LAKE SITE COST ESTIMATE PAWLING, NEW YORK 2
i i
t 4
?
a.
' l l
+
i Nudear I ake.Mte. kyternter 16.1993 h:ksmap\\plas \\ nuclear.lak\\powling.001 '
e I
x.;...
l t
q APPENDIX A j
NUCLEAR LAKE SITE COST ESTIMATE i
PAWLING, NEW YORK Plan Preparation - $17,400 Plan preparation includes the following activities: document reviews, survey plans, trip planning, and the cost and time estimates.
i On-Site Activitics - $70,000 On-site activities will include 30 man-days at the site performing the following: alpha,
-l beta, and gamma surface scans, mapping, direct measurements and smears, exposure rate i
measurements, and soil sampling.
l The on-site expenses also include trip preparation (equipment calibration and packing),
travel to and from the site (airlines and rental vehicles), hotel expenses, and per diem, unpacking equipment, and logging in samples.
Sample Analysil - $30,600 Based on the information obtained from ESSAP cost estimate sheets, smear analysis will cost approximately $1,500, gamma spectrometry will cost approximately $14,000, and i
alpha spectrometry for 25 samples will cost $15,000.
Report Preparati n - $27,600 2
i The report preparation will include the following activities:
tabulation of data, illustrations, and writing and reviewing the draft and final reports, word processing and reproduction.
Nalrar14e Sde Septenact 16. 1993 A-1 hnessartian u=icar takv=*i=w.coi
i I
Total Cost Estimat_q - $147,600 l
I
- Estimates arefor sunry of all areas lis'ed in the NRC Requestfor Technical Assistance received by ESSAP. Reduction or increase in the number ofareas being sunned would
'l
-I result in changes to the original estimate in the "on-site activities" and " sample analyses" categories. Due to the nature of the sun'ey, this estimate is a best guess site and sun'ey findings may change the scope of the survey and increase or decrease the cost estimate.
l 7he NRC site representative will be nonfied if major changes to the scope of the survey i
need to be taken.