l.
t VinGINIA E1.tcTalC AND POWER COMPANY
[
Rici:MONU, VincrNIA 23261 September 14,1990 l
U. S. Nuclear Regulatory Commission Serial No.
90 566 Attention: Document Control Desk NL&P/JMJ:Jmj Washington, D.C. 20555 Docket Nos.
50 338 r
l 50 339 License Nos. NPF 4 NPF-7 i
Gentlemen:
YlRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Repor1 for North Anna Power Station Units 1 and 2 for the month of August 1990.
l Very truly yours,
\\k W. L. Stewart Senior Vice President Nuclear Enclosures cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser i
NRC Senior Resident inspector North Anna Power Station 164+
. !L
~
p. =,.-.
.. +
VIRGINIA POWER COMPANY.
WORTM ABOIA POWER STATION NONTELY OPERATING REPORT NONTMs _Auoust YEARt 1990 j
i Approved:
O,
/
tation Manager S
t
m-q4
' e i
3'j
'i i I
OPERATING DATA REPORT i
DOCKET NO.:
5C:338
.I DATE:
September 4, 90 f
COMPLETED BY LT. Phillips PHONE:. (703) 894 2537 i
l' I
i H
OPERATING STATUS 1.
Uni t Name s................................N or t h Anna 1 2.
Reporting Periods......................... August 1990 3.
L i censed Thermal Power (Wt ):.............
-2,893 4.
Namepl ate Rat ing (Gross We).............
947 5.
Design Electrical Rating (Net W e).......
.907
' t
-6. - Maxinun Dependable Capacity (Gross We):,.
959 7.
Maximum Dependable Capacity (Net MWe)....
911' 8.
If changes occur te, Capacity Ratings (items No. 3 thru 7) since last report, give reasonst:
N/A
- 9. - Power level to which restricted, if any (Net We):
,,,,,,N /A
- 10. Reasons for restrictions, if any:
N/A This Month.
YtD ~
. Canulative
- 11. Hours in Reporting Period......,.........................
.744,0 5,831.0 106,883.0-
- 12. Ntaber of Hours Reactor was Cri t ical.....................
744.0'
=5,819.4 77,061.9 L
- 13. Reactor Reserve Shutdown Hours...........................
0.0 0.0 6,603.6 g
- 14. Hours Generator 0n-Line..................................
744.0 5,797.0 -
74,291.0
- 15. Unit Reserve Shutdown Hours..............................
0.0 '
' O.0 '
O.0 -
- 16. Gross Thermal Energy Generated (MWH).....................
2,148,642.4-16,706,471.9 198,597,249.9
- 17. Gross Electrical Energy Generated (MWH)..................
707,195.0 5,542.966.0_
65,249,788.0
- 18. Net Electrical Energy Generated (MWH)....................
672,026.0 5,271,222.0.
61.766,635.0
- 19. Unit Service Factor......................................
100.0%
z99.4%
69.5%
4i 20; Unit Availability Factor.................................
100.0%
- 99.' %
69.5%'
"^
4
- 21. Unit Capacity Factor (using MDC Net).....................
99.2% -
'99.1%
64.6%
- 22. Unit capacity Factor (using DER Net).....................
99.6%-
99.7%
63.7%-
- 23. Forced Outage Rate.......................................
0.0 0.6%
13.0%:
r
- 24. Shutdowns Scheduled Over Ntat 6 Months (Type, Date, and Duration of Each):
,,f60 day Refueling Outage scheduled 1/4/91
- 25. It Shutdown at end of Report Period, esticated time of Startups _ N/A
- 26. Units in Test Status (Prior to Costnercial Operation):
Forecast Achieved
!NITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.~.
r
_7
...q.
r.
A j
r l AVERAGE DAILY UNIT POWER LEVEL' l
Docket No.si 50-338'
~ Units NA-1--
- Date:-
Seotember 4.
' 90-
[
Completed byt.
T.
Phillins' "l
' Phene -
(703) 894-2537:
y 4
I i
MONTH:-
Auaust~1990 y
4 DAY AVERAGE DAILY POWER DAY 1 AVERAGE' DAILY' LEVEL-LEVEL (MWe-Net).
' LEVEL (MWe-Net)'-
l 1
905 16
'904-2' 911 17.
904 3
913
,1 81 903 r
4 904
>19E 903 5
905 20L
- 904 t
6 906
- 21' 906 7
905' l 221 905 3
8 906
'23 904 9
906 24 906 10 906 25 1907 E
11 887
-26' 907 f
12 906 27 906 f!
13 905
'28 906' 14 904-
- 29 904 ll 15 904 130 905-31 855
.i
'f o
Instructions:
.i on this format, list the. average daily. unit power level in.MWe--
' Net for each uy in the' reporting-month, compute'to the nearest.
[
whole megawatt.
t e
t h
1
-l Q
l Page-1 o f __2.'
l UNIT SRUTDOWN AND. POWER REDUCTIONS Explanation Sheet i
t Docket No. :
50-338 j
t Report Month Auaust' Unit Name -
NA-1 Yeart: 1990-
' Dates. -Sentember 4.
'90 i
1 completed =by -
Todd'Phillins-
+
..*No entry this month i
-3 4
4 l
ll
- )
dq 4
s
-j t
4
m UNIT SHUTDOWNS AND POWER REDUCTIONS
~
1 DOCKET NO.:
50-338,
' UNIT NAME:
NA-1 DATE:
September 4, 1990-REPORT MONTH: August 1990 COMPLETED BY:
-T.
Phillips PHONE:.
(703).894-2537.
1 2
3 4
5
.No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective-(hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
- No entry this month 4.+
e.
1: Type 2:. Reason 3: Methoo~
4:
F= Forced A= Equipment ~ Failure--(explain) 1= Manual Exhibit Fi-~' Instructions S= Scheduled
-B= Maintenance or Test' 2= Manual Scr '.-
for preparation:of Data' C= Refueling-3= Automatic Scram ' Entry Sheets for~ Licensee
-D= Regulatory. Restriction:
4= Continuations.
. Event Report (LER) File' E= Operator. Training &fLicense Examination:
S= Load Reduction (NUREG-0161).
F= Administrative 9=Other G= Operational Error 5:
'H=Other'(explain)
Exhibit H - Same Source mm,.
w
.em euw_'
g
.ve.b--
m.ir-<.-
e-'
- -w7'"N" C-
^-
h
- --#~' ' ' ^ ^ ^ * - - -
p
Q y
b l4.
4 NORTH ANNA POWER' STATION UNIT No.:
'l I
MONTH:
Auaust' i
J E
i
SUMMARY
OF OPERATING EXPERIENCE L
Listed-'below -in. chronological 1. sequence __is a: summary.of operating experiences for this month which required load _ reductions o
or resulted-in significant non-load'related incidents.-
Date Ting Data August 01,.1990 0000 Began month _with Unit at. 100%, 956MW.
August 11, 1990 0143.
Shutdown 1-SD-P-1B, High Pressure-heater drainLpump.for maintenance;.
Reactor power not reduced..
2238 1-SD-P-1B returned to' service.
August 31, 1990 0815 Commencedoramp-down.to:92% power for i
1-PT-34.3J TVFT.
0922 Unit stablized.atl876MW,i92%; power.
1032 1-PT-34.3. completed' satisfactorily;'
Unit held =at?92% foral-PT-24.1,1NI calibration.-
August 31, 1990 2400 Ended month'with unit at 92%, 876MW, in-Chemistry-holdffollowing TVFT.
l' u
1-l L
L
-< ~
1 4
l OPERATING DATA REPORT e
DOCKET Wo.:-
. SU 339 DATE:
.. September 4, 90 COMPLETED BY ' T. Phillips '
PHONE: (703) 894 2774 f
OPERATING STATUS 1.
Un i t N ame s................................ N o r t h Anna 2 r
~2.
R epor t i ng Peri od s......................... Augus t 1990
-l 3.
Licensed Thermal Power ( W t).............
2893 4.
Nameplate Rating (Gross W e)..............
~947 4
5.
Design Electrical' Rating (Net W e):.......
907y 6.
Maximum Dependable Capacity (Gross We):..
957
~
7.
Maxinun Dependable Capacity (Net MWe):....
909-8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report,'give reasons:
N/A 9.
Pcuer level to which restricted, if any (Net We): _N/A
- 10. Reasons for restrictions, if any:
N/A _
i i
This Month'
- Y.t D
. Cumulative j
.i '
'i
- 11. Hours in Reporting Period................................
744.0,..
5,831.0 85,151.0,
- 12. Number of Hours Reactor was Critical.....................
483.3-
,5,570.3 69,692.4 F
- 13. Reactor Reserve Shutdown Hours...........................
36.9' 36.9 l5,891.8 l
- 14. Hours Generator 0n Line..................................
483.2 '
- 5,570.2. -
68,822.1-
?
- 15. Unit Reserve Shutdown Hours..............................
0.0
'O.0~
' 0. 0 i
- 16. Gross Thermal Energy Generat ed (WH).....................
893,582.8 15,267,117.4' 183,413,464.4-
- 17. Cross Elect rical Energy Generated (WH)..................
289,100.0 5,027,524.0?
60,033,041.0-
- 18. Net E l ec t r i cal Energy Generated (WH ).................... '268,213.0 4,769,708.0
.57,608,540.0
- 19. Unit Service Factor...............'.......................
64.9%.
~ 95.5% ' '
80.8%
- 20. Unit Availability Factor.................................
64.9%-
95.5%
80.8%'
- 21. Unit capacity Factor (using MDC Net).....................
39.7%'
89.6%:
75.3%
- 22. Unit capacity Factor (using DER Net).....................
39.7%
90.2% -
74.6%
- 23. Forced Outage Rate.......................................
4.7%
- 0.4% '
' 6.5% :
- 24. Shutrbwns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 75 day Refueling /10 year ISI outage started 8/22/90
- 25. If Shutdown at end of Report Period, estimated time of Startup:
'11/5/90
- 26. Units in Test Status (Prior to commercial Operation):
/
Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY 4
COMMERCIAL OPERATION
)
^
^^
^
r
,.(
i s
I f
i
{
AVERAGE: DAILY UNIT POWER LEVEL
. Docket No. -
50-339 Unit
'NA-2 i
Dates Seotember 4.
'90 completed'by:
-T.
Phillins
. [
Phones-(703) 894-2537
-f ti MONTH:
Auaust 1990 i
s DAY.
AVERAGE DAILY POWER'
-DAY
-AVERAGE DAILY: LEVEL 1 LEVEL (MWe-Net)
LEVEL (MWe-Met)'.
1 675
'16 416' 2
668 17 416 l
3 664 18 416 1
4 666
' 19.'
'414-5 656
.20.
406' 6
645 2 11
-141
' l 7
644
'22; O
8 642 23.
0-j 9
641 24 0'
10 631 25:
O 11 600
. 2 6 --
0-12 596
'27'
=0
[
13-525
- .28' O
,l i
14 417 c
29-
'O' 15 418 30'.
"O 4
' 31 "
0-
.t Instructions:
On'this format, list the average: daily unit power [ level in MWe--
Net'for each day in the reporting month..
Compute.-to.the. nearest
. i 4
- whole megawatt.'
i
~!y
4 Page 1
of a UNIT SHUTDOWN AND POWER REDUCTIONS-Explanation Sheet Docket No.:
50-339 Report Month' Auaust
-Unit Name NA Years 1990 Dates-Sectember 4, 90 Completed by:
Todd Phillins i
- 90-1 August 13, 1990:
2!
Ramped down from 75.7 to 50% power.~due to Hi-His alarm?
on 2-MS-RM 293, Main Steam header N-16 radiation monitor.
Remained at approximately-50%. power.
Load reduction for Administrative reasons.
- 90-2 August 20, 1990 commenced ramp down to shutdown due-to Hi j
primary-to-secondary leakage detected on.2-MS-RM-291,.
j "B" Steam Generator N-16 radiation monitor,fand Hi-HiL j
alarm cn1 2-MS-RM-293.
Load reduction forcAdministrative reasons.
a
'l August 21, 1990 Main Generator taken off-line at 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />._ Unit entered mode 3 at 0323 hours0.00374 days <br />0.0897 hours <br />5.340608e-4 weeks <br />1.229015e-4 months <br />.
Unitientered mode'4-at 1933 hours0.0224 days <br />0.537 hours <br />0.0032 weeks <br />7.355065e-4 months <br />.
k
9 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: -3 39. l :
UNIT NAME:
NA-2 DATE:
September 4, 1990'
-REPORT MONTH:
August 1990 COMPLETED'BY:
T. Phillips y
PHONE:-.(703) 894-2537 1
2 3
4 5
^No.
Date Type Duration" Reason Method of Licensee System Component Cause &' Corrective (hrs)-
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 90-1 900813 F
175.1 F
5-N/A MS RM S/G Maintenance scheduled--
~
during upcoming outage.:
l90-2 900821 F-242.4 F
5
~N/A
_MS RM
.S/G-Maintenance scheduled
.during upcoming outage t
=.
t..
1: Type 2: Reason..
3: Method.
.4:
~F= Forced A= Equipment Failure'(explain).
'l= Manual..
Exhibit.F
~ Instructions-S= Scheduled
-B= Maintenance or TestL~
2=ManualiScram-for preparation ~of Data-C= Refueling'.
- 3= Automatic Scram Entry
- Sheets for Licensee' D= Regulatory: Restriction-4= Continuations ~
Event ReportE(LER) ~ File E= Operator-Training &. License;ExaminationL 5= Load Reduction' l(NUREG-0161)'
F= Administrative ~
~
9=Other G= Operational Error 5:
H=Other'(explain)-
~
Exhibit.H - Same.-Source-
7.
';- *Il.;
)
a
,i 3
e L' :
~
NORTH ANNA' POWER-STATION:
- )
UNIT.MO.
.2' l
MONTH.
Auaust F
SUMMARY
OF OPERATING EXPERIENCE Listed below in. chronological sequence.is
- a. summary:-of) operating experiences for this month which required load reductions or resulted in significant'non-load related incidents, j
')
Date Time Data l
..t August 01, 1990 0000 BeganLmonth with' Unit at 75L7%,1 fl
- 752MW..
'l August 13, 1990 1432
. Commenced.rampLdown to 50%'due"to'
- Hi-Hi alarm on 2-MS-RM-293, N-161 radiation monitor.-
1532 Unit stabilized atL47.7%,f425MW..
s August 20, 1990 2138 Commenced ramp 1down due to.
a increasing l primary-to-secondary leakage in 2-RC-E-1B.
j
' Main Generator >off-line.
August: 21, 1990 0310 L
.i 0323
' Unit entered ModeA3.
0357 Reactor 1 Trip breakers opened.
A 1
1933 Unit entered Mode 4.-
R August 22, 1990 1612
- Unit: entered: Mode 5.
d August 31, 1990-2400 Ended-month with Unit in Mode 5, 0%.:
.;f 4
3 I
e, 1
2 1,
.