Forwards Safety Evaluation Accepting First 10-yr Interval ISI Program,Through Rev 5,except Where Relief Denied
ML20059J160
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/08/1993
From: Beckner W
Office of Nuclear Reactor Regulation
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20059J163 List:
References
TAC-M84584, NUDOCS 9311120063
Download: ML20059J160 (4)


Text

g A U g t

UNITED STATES 4

9 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20lililM001

\\

/

Novest>er 8, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.

Post Office Box B K111ona, Louisiana 70066

Dear Mr. Barkhurst:

SUBJECT:

FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM, THROUGH i

REVISION 5 - WATERFORD STEAM ELECTRIC STATION, UNIT 3 (TAC NO. M84584)

By letter dated September 17, 1992, Entergy Operations, Inc. (the licensee),

submitted Waterford 3 Steam Electric Station First Ten-Year Interval Inservice Inspection (ISI) Program Plan, Revision 5.

Additional Information was provided by the licensee in.a letter dated June 4, 1993, and a conference call on June 30, 1993. The NRC, with the assistance of its contractor, Idaho National ' Engineering Laboratory (INEL), reviewed and evaluated the licensee's submittal dated September 17, 1992, and additional information, and concluded that the Waterford 3 First 10-Year Interval ISI Program Plan, through Revision 5, provides an acceptable level of quality and safety and is authorized pursuant to 10 CFR 50.55(a)(3)(i) and is in compliance with 10 CFR 50.55a(g), except where relief was denied. Our safety evaluation (SE) is enclosed.

Based on our review, we conclude that the requirements of-the Code are impractical and relief is granted or remains granted for Requests for Relief 151-001 Parts A, B, E, F, G, H, I, and J, 151-002,'151-003, ISI-006, 151-007, 151-010, 151-011, and ISI-013. for Request for Relief 151-001, Part C, relief is granted for steam generator welds04-011 and 04-012.

For reactor pressure vessel inside radius sections01-027 and 01-030, it is concluded that relief is not required at this time and that the subject volumetric examinations should be completed when the core barrel is removed.

For pressurizer nozzles05-011 and 05-012, relief is denied based on inadequate technical justification.

For Request for Relief 151-001 Part D, partial relief is granted as specified i

in Section 2.E of our SE. For certain welds contained in Part D, it was determined that relief could not be granted until an approximation of the.

l percentage of the Code-required examinations that could be performed was provided. Therefore, relief was denied'for these welds.

For Request for Relief 151-012, relief is granted for Groups 2 and 3, but i

denied for Group 1.

The impracticality of examining Group I was not evident.

RE p WY r{G 9311120063 931108 PDR ADOCK 05000382 1

G PDR pol tlg

-a -

Mr. Ross P. Barkhurst Requests for Relief 151-004, 151-005, 151-008, and 151-009 were deleted from the program in Revision 4.

The concepts or components were incorporated into the program or into other relief requests..

.The staff has determined that the granting of relief is. authorized by law,.

will not endanger life or property or the common defense and security, and =is.

otherwise in the public interest.

In making this determination, we.have given.

due consideration to the burden that could result if the applicable ASME Code-requirements were imposed on your facility. This letter grants the relief-identified above.

Sincerely, WhaOhA William D. Beckner, Director Project Directorate IV-I Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page

Mr-. Ross P. Barkhurst t

Requests for Relief ISI-004, ISI-005, ISI-008, and 151-009 were deleted from the program in Revision 4.

The concepts or components were incorporated into the program or into other relief requests.

The staff has determined that the granting of relief is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest.

In making this determination, we have given due consideration to the burden that could result if the applicable ASME Code requirements were imposed on your facility. This letter grants the relief identified above.

Sincerely, ORIGINAL SlGNED BY:

William D. Beckner, Director i

Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

i Safety Evaluation cc w/ enclosure:

i See next page DISTRIBUTION (Docket; file".

NRC & Local PDRs PD4-1 Reading J. Partlow E. Rossi T. Murley/F. Miraglia JLieberman E. Jordan G. Hill'(2)

D. Wigginton E. Adensam W. Beckner P. Noonan ACRS (10) (P-315)

OGC (15B18)

J. Roe A. B. Beach, RIV T. McLellan OC/LFDCB J. Mitchell, EDO 0FC LA: PD4-L, i PM:fh4-)

OGC y, D:PD4-1.4 -

^

' D$hnton:pk WBecknYr

~

NAME PNoonan O//3[N

@/O/93 li/d/93 O/f/93 DATE COPY M NO

[Eh/NO YES/t)0 -

YES[fiO) 0FFICIAL RECORD CDPY Document Name: WAT84584.rel 1

h 100052 1

)h5 t\\ l i

a

j Mr. Ross F: Barkhurst Entergy Operations, Inc.

Waterford 3 cc:

1 Mr. Hall Bohlinger, Administrator Regional Administrator, Region IV Radiation Protection Division U.S. Nuclear Regulatory Commission Office of Air Quality and Nuclear Energy 611 Ryan Plaza Drive, Suite 1000 Post Office Box 82135 Arlington, Texas 76011 Baton Rouge, Louisiana 70884-2135 Resident Inspector /Waterford NPS Mr. Jerrold G. Dewease Post Office Box B22 Vice President, Operations Killona, Louisiana 70066 Support Entergy Operations, Inc.

Parish President Council P. O. Box 31995 St. Charles Parish Jackson, Mississ1ppi 39286 P. O. Box 302 Hahnville, Louisiana 70057 William A. Cross Bethesda Licensing Office Mr. Harry W. Keiser, Executive Vice-3 Metro Center President and Chief Operating Officer Suite 610 Entergy Operations, Inc.

Bethesda, Maryland 20814 P. O. Box 31995 Jackson, Mississippi 39286-1995 Mr. Robert B. McGehee Wise, Carter, Child & Caraway Chairman P.O. Box 651 Louisiana Public Service Commission Jackson, Mississippi 39205 One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. D. F. Packer General Manager Plant Operations Mr. R. F. Burski, Director Entergy Operations, Inc.

Nuclear Safety P. O. Box B Entergy Operations, Inc.

Killona, Louisiana 70066 P. O. Box B Killona, Louisiana 70066 Mr. L. W. Laughlin, Licensing Manager Entergy Operations, Inc.

P. O. Box B Killona, Louisiana 70066 Winston & Strawn Attn:

N. S. Reynolds 1400 L Street, N.W.

Washington, DC 20005-3502 f

.