ML20092H889

From kanterella
Jump to navigation Jump to search

Informs of Implementation Dates for License Amends 92,99, 101,103 Through 109,App J Exemption Type a Test,Gl 89-10 MOV Testing & First 10-yr Interval ISI Throuh Rev 5,as Requested by NRR
ML20092H889
Person / Time
Site: Waterford 
Issue date: 09/20/1995
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, TAC-M75735, TAC-M80416, TAC-M84584, TAC-M85969, TAC-M87219, TAC-M87799, TAC-M88327, TAC-M88434, TAC-M90172, TAC-M90192, TAC-M91332, TAC-M91460, TAC-M91924, W3F1-95-0158, W3F1-95-158, NUDOCS 9509210231
Download: ML20092H889 (2)


Text

~t I, &

= ENTERGY l":T"s """*' '"*-

KJ!ona, LA. 70066 b

Toi 504 739 6774 R. F. Burski Dwen bkonr Safety V2steetto 3 W3F1-S5-0158 A4.05 PR September 20, 1995 4

U.S. Nuclear Regulatory Commission ATTH:

Document Control Desk Washington, D.C.

20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Waterford 3 Implementation Dates Gentlemen:

I This letter serves to inform you of the implementation dates for several license amendments and oth'r issues as requested verbally by NRR.

1 Task I.D.

Description Implementation Date M80416 Amendment 92 3/4.8.1 A.C. Sources 02/15/95 M85969 Amendment 99 TS 3.0.3, 3.0.4, 4.0.4 11/22/94 M91332 Amendment 101 LC0 3.0.5 03/08/95 M90192 Amendment 103 3/4.3.4 Turbine Overspeed 03/13/95 i

M87210 Amendment 104 Loose-Part Detection System 09/12/95 M91924 Amendment 105 One Time Deviation MTC Test 04/28/95 M88434 Amendment 106 RCS P-T Curves 05/11/95

.M87799 Amendment 107 Incore Detection System 07/28/95 a"5 a cosa I

}

9509210231 950920

.G' o y"

" BR'.. _

4,

2,

,Waterford 3 Implementation Dates W3F1-95-0158 Page 23:

September 20, 1995 Task'I.D.

Descriotion~

Imolementation Date M91460 Amendment 108 Increase Fuel Enrichment

-07/06/95 M90172 Amendment 109 Relocates Review and Audits-08/02/95 d

Other Issues.

Implementation Date M88327 Waterford 3 App. J Exemption Type A Test 09/20/95 75735 Generic Letter 89-10 M.0.V. Testing 07/28/94 M84584 First 10-Year Interval ISI Through Rev. 5 11/08/93 Questions or comments on any of this information may be directed to Paul Caropino at (504) 739-6692.

L Very truly yours, f

R.F. Burski l

-Director i

Nuclear Safety RFB/PLC/dc cc.

L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR t

R.B. McGehee N.S. Reynolds i

NRC Resident Inspectors Office Administrator Radiation Protection Division

.(State of Louisiana)

'American Nuclear Insurers I