ML20059H627
| ML20059H627 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 01/14/1994 |
| From: | Feigenbaum T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059H630 | List: |
| References | |
| NYN-94003, TAC-M86712, NUDOCS 9401310049 | |
| Download: ML20059H627 (2) | |
Text
-
~
~
17
.( -
6 p
Seab ok NH 03874' Telephone (603)474-9521
=(
Facsimile (603)474-2987 Energy Service Corporation Ted C. Feigenbaum Senior Vice President anct NYN-94003 Chief NuclearOfficer January 14,1994 United States Nuclear Regulatory Commission Washington, D.C. 20555 t
Attention:
Document Control Desk
References:
(a)
Facility Operating License No, NPF-86, Docket No. 50-443
(.b)
North Atlantic letter NYN-94002, dated January 14,1994, " Proposed Change to Appendix B Quality Assurance Program (TAC No. M86712)," T. C. Feigenbaum to USNRC
Subject:
License Amendment Request 93-20: Administrative / Editorial Chan;,es to Technical Specifications (TAC No. M86712)
Gentlemen:
North Atlantic Energy Service Corporation (North Atlantic) encloses herein License Amendment Request 93-20.
This License Amendment Request is submitted pursuant to the requirements of 10CFR50.90 and 10CFR50.4.
The pmpose of License Amendment Request 93-20 is to propose changes to the Seabrook Station Technical Specifications to redefine Station Operation Review Committee composition based on experience and expertise; to allow implementation of a Station Qualified Reviewer Program for the review and approval of designated Station procedures that do not affect nuclear safety; to delete the requirement for periodic procedure reviews; to revise the requirement for issuing Nuclear Safety Audit Review Committee (NSARC) minutes and reports from within fourteen days to within 30 days following l
each meeting or completion of the review; and to make numerous editorial changes. Editorial changes delete items that only applied prior to the plant exceeding 5% power or until completion of the first refueling outage; revise system / equipment names to be consistent with those used elsewhere in the Seabrook Station Technical Specifications;' clarify several minor inconsistencies involving NSARC function, composition, and use of alternates; correct the value used for Reactor Coolant System volume based on removal of the Resistance Temperature Detector manifolds; and delete the Bases for a Technical Specification requirement that was not included in the fmal draft of the Seabrook Station Technical Specifications.
License Amendment Request 93-20 has been reviewed and approved by the Station Operation Review Committee and the Nuclear Safety Audit Review Committee.
' As discussed in Section V of the Licuise Amendment Request, the proposed changes do not involve a significant hazards consideration pursuant to 10CFR50.92. A copy of this letter and the enclosed License Amendment Request have been forwarded to the State of New Hampshire State Liaison
~
Officer pursuant to 10CFR50.91(b). In addition, North Atlantic has determined that License Amendment i
Request 93-20 meets the criteria of 10CFR51.22(c)(a) for a categorical exclusion from the requirements for an Environmental Impact Statement (see Section VII enclosed).
i a member of the Northeast Utilities system sh i-9401310049 940114 D
PDR ADDCK 05000447 yP P.
ppg
(
United States Nuclear Regulatory Commission January 14,1994 Attention:
Document Control Desk Page two North Atlantic requests NRC review of License Amendment Request 93-20 and issuance of a license amendment by July 14,1994 (see Section VI enclosed).
Should you have any questions regarding this letter, please contact Mr. Terry L. Ilarpster, Director of Licensing Services, at (603) 474-9521, extension 2765.
Very truly yours, ff Ted C. Feigen um Enclosure TCF:MJM/
cc:
Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager r
Project Directorate 1-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident inspector j
P.O. Box i149 Seabrook, Nil 03874 Mr. George L Iverson, Director New ilampshire Office of Emergency Management 107 Pleasant Street Concord, Nli 03301 i
l i
l 1
I 1
.