1 r

, a DPERATING DATA REPORT f

DDCLET NG 50-413 i DATE Juuary 14. 1994 OPEN TIN 5 STATUS COMPLETED BY R.A. Williaes 1 TELEPHONE 704-332-5346

1. Unit Naee: Catanta 1 -;

E. Rentting Feriod: December 1, 1993-December 31,1593 *

3. Licensed Thersal Pcuer (MWth 3411 .
9. Wateplate Rating (Gross FWeh 1305* Notes *Naseplate Rating j
5. Deiign Electr nal Rating (Net MWeh 1145 (6ross MWel calculated as- i
6. Maxisus Dependable Capacity (Srcss MWeh 1192 1450.000 MVA x .90 power ,
7. Maxia;;s Dependable Capcity (Net MWeh 11ES factor per Page lii, ,

B. If Changes Occur m Capacity Ratings (Itess Nusber 3 Through 71 Since Last- NURES-0020.

Repert. Give Reasons

  • i
9. Peer Leiel Tc Dich Pestricted, If Any (Net MWeh 'q
10. Reascn Fti Restrict ens, If any:

q Inis M: nth ir .-to-Da t e Cueulative

11. Hars in Eeporting ferled 744.0 2760.0 74593.0 12, Naber Of Houis Reactor Was Critical 46.9 6991.5 55773.1  ;
13. Reacter' Reserve Shutdown Heers --0-- - -  !
14. neurs Benerator On-Line 9.4 6918.6 54653.5- '
15. Urat Reserve 5twtdewt Hours - --0--

16, $ross inereal Energy Benerated (M.!H) 9102 2270572B 177242536

17. Bress Electrical Energy Gererated (MWH1 968 B032916 62364135
19. Net Electrical Energy Generated (MiM1 -12604 7579380 58544629 l
19. init Sen ice F u ter 1.3 79.0- 73.3  ;
20. Unit Availah111ty Fa tor 1.3 79.0 73.3~ ,

'21. Unit Cap nity factcr (Using N C Net) 0.0 76.6. 69.2  :

22. drit Captity f acter (Using DER Net! 0.0 75.6 68.6

- 23. Unit Ferced Cutage Rate 0.0 4.6

'l i 10.3

24. Shuthen Scheduled Over Nest 6 nrths (Type, Date, and Duration of Eachh >

None

25. If Shut Denn At End Of Re;; ort Period. Estimated Date of Startup: January 01, 1994  !

26.' Units'In Test Status (Pricr to Cen ercial Operation h Forecast Achieved INIIIAL CRITICAL 11Y INITIAL ELECTRICITY f

COMERCI At. OPERAi!0N

.t 9401240162 940114 I l PDR ADOCK 05000413 % --

R PDR -k >

n ,a4 -

. . , . . . - . . ~ . . . . -. . . . . . -. . _. . , , .. . -

)

. l.

0?ERATING EATA REPORT I

DOCKET N3 50-413 UNIT Catamba 1 DATE January 14,1993' .

COMPLETED BY R. A.' Williars - ,

TELEPHONE 704-382-5346 ,

, . KATH Dneeber,1993 .!

M- AVERABE DAILY POWER LEVEL E . AVERAGE DAILY PDWER LEVEL (MWe-het) (MWe-Net) 1 0 17 0 ,

2 0 10 0 r

3 0 19 0 4 0 20 0 I 5 0 21 -0 1

6- 0 22 0 -

E 7 0 23 0 8 0 24 0 - i 9 0 25 0 10 0 26 0 ,

11 0 27 0 12 0 29 0 i

13 0 29 0 is 0 30 0 ,

!! 0 51 0 16 0

-i s i

i

UNIT SHUTDOWNS AND POWER' REDUCTIONS DOCKET NO. 50-413 UNIT NAME UATAWBA 1-DATE "ol/14/94 REPORT MONTH December 1993 COMPLETED BY H. A. Williams TELEPHONE (/v41-J62-3346 m

(1) 2) _

(4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE-4 93 1 S 734.02 C --

RC- FUELXX END OF CYCLE 7 REFUELING OUTAGE 12-P 93-12-31 F --

A --

HA INSTRU TURBINE CONTROL SYSTEM PROBLEM 13-P 93-12-31 S --

B --

HA TURBIN HOLD FOR TURBINE WARMING / SOAK

-5 93-12-31 S 0.62 B --

HA TURBIN TURBINE OVERSPEED TRIP TEST (1)F Forced (2)

Reason:

(3)

Method:

(4)

Exhibit G - Instructions-

-S Scheduled 1-Manual for Preparation of Data A-Eq\lipment FailureB-Maintenance or test (Explain) 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulatory Restriction . 4-Other-(Explain) Event File Report (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

(

DOCKET: 50-413 UNIT:. Catawba.1 Date: 01/14/94 NARRATIVE

SUMMARY

MONTH: December 1993 Catawba Unit 1 began the month of December with end-of-cycle 7 refueling outage. The refueling outage ended on 12/31/93 at 1401. The unit was held at 12% power on 12/31/93 at 1720 to 1805 due to turbine control system problems, and at 19% power on 12/31/93 at 1835 to 2130 for main turbine warming. The turbine was tripped to perform _the overspeed trip test on 12/31/93 at 2323. The unit remained in the outage?

for the remainder of the month.

i l.

}

3j 1

i l

Prepared by: R. A. Williams Telephone: (704)-382 5346 '

-l

)i

l f,

t I

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba. Unit 1 j
2. Scheduled next refueling shutdown: February 1995

.3. Scheduled restart following refueling: April 1995 }

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF' f ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4  ;

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. ,

4. Will refueling or resumption of operation thereafter require a. -

technical specification change or other licence amendment? <

i If yes, what will these be?

{

If no, has reload design and core configuration been reviewed by j Safety Review Committee regarding unreviewed' safety. questions?'

I

5. Scheduled date(s) for submitting proposed licensing action and ,

supporting information. I i

6. Important. licensing considerations (now or different design or  !

supplier, unreviewed design or performance analysis. methods, ,

significant changes.in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core: 121

, (b) in the spent fuel pool: 484 [

8. Present licensed fuel pool capacity: 1418 f Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 i DUKE POWER COMPANY DATE: January 14, 1994 Name of

Contact:

B2 A. Williams Phone: (7041-382-5346

]

h

'I I

I l

-1 k

. , - . . . , , , -- ,- . - - ~ - .. - ., , -.

q 1

. . l}

. R p' ,

i OfERATIPS DATA REPORT .; .

D0CKET ND 50-414 l DATE January 16. 1994  :'

OPEFATING STATUS COMPLETED BY R.A. Williams TELEPHDNE -704-382-5346

1. Unit Name: Catauba 2 ,
2. Reprtiry Period: Deceaber 1,1993-Decester 31,1993  ?
3. Licensed Thersal Power d'Wt): 3411
4. N aeplate Rating (Srcss N e u 1305e Notes
  • Nameplate Rating [
5. Iesign Electrical Rating (Net MWe): 1145 -(Brcss MWe) calculated as. -l 64 Maxisse Dependable Caputy (Grcss Mwe): -1192 1450,000 MVA x .90 power
7. fiarleus Dependable Captity (Net MWeh 1129 factor per Page lii, B. If Charges Dc:gr in Capacity Ratings (itess Nutter 3 Through 7) Since Last NUREB-0020.- ,

. Pegtt. S ne Reascr.s: l t

'I

9. Power Level To Which Restricted, If Any (Net MWe): ,
10. Reason for Restrictions, if any: .

i This Month Yr.-to--Date Cusulative-  ;

l

11. Hcurs In Reprting Period 744.0 '8760.0 64609.0 ,]
12. Nutber Of Heurs Reacter Was Critirai 744.0 7294.5 49940.9  ;
13. Reatter Reserve Shutdown Hours --0-- -- 0 ~ --0--
14. knts Benerator On-Line 744.0 7233.9 '49079.5  ;
15. Uttit F:esene Shutdown Hours --0-- - - '

16.GrossThersalEnergyGenerated(MW4) 2524163 24197893 156889039

+

IL Bross Electrical Energy Benerated IMWin 906242. 8616264 55577259 10.- Net Electrical Erergy Generated (FWMi 860462 8162731 52290057 j

!?.UnitServiceFactor 100.0 0'e. 6 76 0

20. Unit foali6bility Facter 100.0 82.6 76.0 -!
21. Unit Capacity fatter (Using MDC Aet) 102.4 B2.5 71.5 i
22. Unit Captity f actor .t9sirq DER .Neil 101.0 Bl.4 70.7 l
23. Unit forced 0 tage Eate 0.0 0.6 9.7 .;
24. Shuttewn Scheduled Over Nest 6 Months (Type, Date, ad k ration of Each):

Refueling - April 29, 1994 - 68 days 2L If Shut Dm At End Of Report Period. Estisated hte of Startup_ '

26. Onits in Test Status (Prior to Coenertial Operationh ferecast Achieved q

IN!TIAL CRITICAll1Y -

INITIAL ELECTRICITY  ;

COMMERCIAL OFERATION i

y

~

a

. - , . , e -

,. - , - - .~ -. . ,

t 1

. f

.i OPERAtlNSDATAREFORT i

t 1

00CKET NO ~50-414 UNIT Catanta 2 DATE January 14, 1993 -

COMPLETED BY R.A. Williaes '

TELEPHONE 704-382-5346 5

MONTH Deretter,1993 -l 1

Ll A AVEFAGE DA!LY 90WER LEVEL pal AVERA6E DAILY POWER LEVEL (MWe-Net) (MWe-Net) .. ;

1  !!?3 17 1156 .

2 1160 1B  !!55 3 1159 19 1159  !

4~ l152 20 1158  ;

5 1157 21  !!60 '

i 6  !)57 22 1160 .. i 7 _

tjiB 23 1159 E 1158 24 1160 l 9  !!S7 E5 1159 ,

10 1153 26 -1162 _

11 1156 27 -1161 12 i:57 29 1156 >

13  !!57 29 1161-14 1156 30 -1161 >

' 1* 1155 31 1160 16 1153

'I b

I

(-

T

! ' b' f *l;.; t; .

. ~ ,

- UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.- 50-414 UNIT NAME CATAW13A 2 .-

DATE %/14/v4

. REPORT MONTH December 1993 COMPLETED BY x. A. w1111ams TELEPHONE ( / v41 -J t5 2-3 3 4 6 (1) 2) _

(4) (5)

E HOD T A OF LICENSE

-N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1 (2 (3 (4

. Forced eason* .ethod: xhibit G - Instructions-S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram- EntW Sheets For Licensee C-Refueling 3-Automatic Scram Event Report'(LER)

D-Regulatorv Restriction , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination

' F-Administrative (.5 )

erator Error Exhibit I - Same Source G-Okher H-O (Explain) (Explain) .

- - . - - . - _ - - - - ...__.__--____--_-_.--.__,a-~ _ - - - - - - - _ . - - . _ - - . . _ , - , , - - - . . - - - + - - -- -- < - -

p 1l- ,

i F

t DOCKET: 50-414 UNIT: Catawba 2 -

Date: 01/14/94 {

l NARRATIVE

SUMMARY

j MONTH: December 1993 ,

i Catawba Unit 2 began the month of Decembe: operating at 100% full power. The unit  !

operated at or near 100% full power for the entire month.  :

i I

-l e

L h

I

1 l

l l

i i\

l J

Prepared by: R. A. Williams Telephone: (704)-382-5346 i i

)

i i

G', . . - . , - -

MONTHIN' REFUELING'INFORMATION REOUEST

1. Facility name:-Catawba. Unit 2
2. Scheduled next refueling shutdown: Aoril 1994
3. Schaduled restart following refue.!ing: July 1994 TIC F(OJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANx ..S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4-THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require-a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload. design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

-5. Scheduled date(s) for submitting proposed licensing action and' supporting information.

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 356
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: January 14, 1994 Name of

Contact:

R. A. Williams Phone: (704)-382-5346 s