Monthly Operating Repts for Dec 1993 for Jm Farley Nuclear Plant
ML20059G384
Person / Time
Site: Farley  
Issue date: 12/31/1993
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9401240133
Download: ML20059G384 (10)


Text

_

f/;utrem Nuclear Operadng Company J M. Farley Nuclear Piant P O Draner 470 Ashfcxd. Alabama 36312 Telephone 205 839 51f4 L

Southern Nudear Operating Company the southern cleClitC Sysicm January 13, 1994 Docket Nos. 50-348 50-364 U.

S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.

C.

20555 Joseph M.

Farley Nuclear Plant Monthly Operating Data Report Gentlemen:

Attached are the December 1993 Monthly Operating Reports for Joseph M.

Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

}

Respectfully submitted, l

1 ON N/24rk y

Dave Morey '

RWC: jgp (mor)

Attachments cc:

Mr.

S.

D.

Ebneter Mr.

B.

L.

Siegel Mr.

T. M.

Ross 1

21 DD~io 9401240133 931231 I~

f l

PDR ADDCK 05000348 L

R PDR f

i 3

n.-, s. n i m, j

OPERATING DATA REPORT DOCKET NO.

50-348 4

DATE January 6,1994 COMPl.ETED BY R. D. Hill TELEPilONE (205) 899-5156 i

OfIM115G 51A105 1.

Unit Name:

Joseph M. Farley - Unit 1 Notes 2.

Reporting 8'eriod:

December 1993

1) Cumulative data since 12-01-77, date 3.

Licensed Thermal Power (Mwt):

2,652 of commercial operation.

- 4, Nameplate Rating (Gross MWe):

860 5.

Design ELctrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

If Changes occur in Capacity Ratings (items Number 3 Through 7) Since Last Repod, Give Reason N/A 9.

Power Level To Which Restricted, If Any (Net MWe_ N/A

~i 10.

Reasons For Restrictions, If Any:

N/A

\\

This Month Yr to Date Cumulatis e 1

11.

Ifours in Reporting Period 744.0 8,760.0 141,000.0 -

12.

Number OfIlours Reactor Was Critical 744.0 8,542M 111,663.9 -

- 13.

Reactor Reserse Shutdown llours 0.0 0.0 3,650.0

~

14.

Ileurs Generator On-line 744.0 8,522.9 109,906.6.

15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

~

- 16.

Gross Thermal Energy Generated (MWH) 1,972.228.8

_ '2,491,329.4 282,492,405.2 17.

Gross Electrical Energy Generated (MWH) 641,410.0 148,244.0 91,015,046.0-18.-

Net Electrical Energy Generated (MWH) 609,286.0 6,873,904.0 85,940,154.0 19 Unit Service Factor 100.0 97.3 77.9 20.

Unit Availabilty Factor 100.0 97.3 77.9

' 21.

Unit Capacity Factor (Using MDC Net) 100.9 96.6 74.8 22.

Unit Capacity Factor (Using DER Net) 98.8_

94.7 73.5 23.

Unit Forced Outage Rate -

0.0 2.7 6.4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):.

Refueling / Maintenance Outage March 4,19?4., Approximately f 5 days.

j 25.

If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A 26.

. Units in Test Status (Prior To Commercial Operation):

Forceast Achieved -

Initial Criticality 0 & O6!22

~03/09122 Initial Electricity 03/2022 08/18 27 Commercial Operation

.1220]R2

.12/01/22 i

3 1

l DOCKET NO.

50-348 t

UNIT 1

DATE January 6,1994 l

COMPLETED By R. D. Hill TELEPilONE (205) 899-5156 t

MONTH - DECEMBER l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-l (MWe-Net)

(MWe-Net) -

I_

818 17 821 2

817 18 821 3

815 19 821

=3 t

20 819 t

4 812 5

807 21 820 6

817 22 823

.i 7

819 23 822 t

817 24 822 i

8 9

817 25 821 10 815 26 823 11 819 27 820 12 821.

28 819-

.{

l

.13 820 29 817 14 818 30 822 15

'820 31' 823 1

16 820 INSTRUCHQNS I

. On this fornA hst the average dely unit pmer lesel m MWe-Net for cath day in the -

tcporung penat Cornpute to the neares: u hate nwgawatt

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations -

December 1993 There were no unit shutdowns or major power reductions during the month of December.

The following major safety related maintenance was perfonned during the month:

1.

Performed miscellaneous corrective and preventive maintenance on the diesel generators.

2.

Modified the 1B charging pump gear box to prevent an oil mist problem.

3.

Rebuilt the IC service water pump (A Train) Breaker due to tripping.

4.

Performed maintenance on two main feed regulating valves due to flow oscillations.

l t

s I

I b

t

j t'[!

p(i10!!

M!YliP

{hO]3 e

1 c

t r

i 4

6 u

n 4

5 o

U 9

l 5

e S

1 l

1 8

i E

E m

H 9

V C

a 4

v-6 3

e 9

I O N S

yD 8

GT

-0 l

E r

r R

I 5

a a

5

)

E N t

F u R R O b

R i

n 0

R J

a 2

T C M

O I

t i

h J

(

x C C E E

A R w

J D

5 v

T N

N n

m

. E E YE O1 A

E T BN N3 A D O S

E E

V w

A T N D U

R l

E I

A P

E TP C

KT EE 1) 6 I

C N LL 1

0 OU P E G

T D

1 r

y E

t 3

o r

n R f

tn e O

n E v U w

s E N w

C it a e le o et e

(

e 1_

It 1f

II u D c

s r

n i S

T F

t f

e N

N

)

ns o c

)

U R E

5 s

O N

(

I n

E o

r I

E

a T

O G i f

(

o L D

t r

s t

P C

M O bi p

te o

i a r

C U

O h

e p

e x

r h

e C

E P S R D

I!!

il!iI' 4

E

)

R M

4 R

E

(

E E

T c

S D W

Y O m)

S C a

O m

r n

c i P

a a S lp D

=

!i:!.

r j

7 j

c c E

S i

x S

l ta E N

=

E T T a m (r

N R l

u A

a N E O d

u n o e E V P o n a t

h u

t S

C h

a M A O W

I E E te N

M.

L R

M 1

2 3 4

)

r i1l I

_. 3 5

O 0

e D

R F

R b

T E

O G O m

U H

N G ec a

D I

e l

1 iS 3

O T A D

E H T E T U R f

T C

E i N l

o I

N E

t S

h h

W tn on U

D O

it D

o a

m ifl d

m y

m

)

2 e

a l

i

(

h x

T N

E t

N O

g

)

e O

S i

m s

)

n n

n A

r a

e ia M

E u

lp i

lp c

R d x

n L x

T E

o R

N n

(

t i &

E r

s s

t e e c

r T

n g

r o

u t

n o

O O S i

l o

e ia n

l lp

)

r P

R t

i r

s i e m

T c

a n

r I

E m

A U u

F e

R a

E m

c r

t

)

R R K n n y

a a d

t U

e a g

r T

ts i

E(

r n x e

o e i t

r o

D I

r n n m

o in a

r

[

e i

t l

la t

i r

e t

_ r p

e a

u m u r

t f

g e n e h u

Q w

q a e e p d p

t J

o o E M R R O A O O n

E p

s a

P r

e A B C D E F G H Y

o

. R s

I3 i!

2 m

i T

n w

o d

=

E tu lA hs D

on e

d r

k e

d u

._,l-w e d r e r

h e

o c

O r

F S N

e

S h
F i jhltI;f T

i!i

ly!n4lh3gbE 1

)

i l

7 j

.i' j'

4 1

i OPERATING DATA REl' ORT j

DOCKET NO.

50-364 DATE January 6,1994 COMPl.ETED llY R. D. Ilill TELEPIIONE (205) 899-5156

-i

~ OPERATINGSTA'lLS s

1.

Unit Name:

Joseph M. Farley - Unit 2 Notes i

2.

Reporting Period:

December 1993 I) Cumulative data since 07-30-81, date 3.

Licensed Thermal Power (MWt):

2.652 of commercial operation.

l 4.

Nameplate Rating (Gross MWe):

860 S.

Design Electrical Rating (Net MWe):

_l 829

' 6.

Maximum Dependable Capacity (Gross MWe):

863.6 7.

Maximum Dependable Capacity (Net MWe):

822 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason _N/A 9.

Power I.evel To Which Restricted, if Any (Net MWe_N/A 10.

Reasons For Restrictions, if Any:

N/A 1

i.l This Month Yr.to Date Cumulatis c I1.

Ilours in Reportirg Period 744.0_

8,760.0 108,913.0-

' 2.

Number OfIlours Reactor Was Critical 559.5 6,931.8 92,953.7 13.

Reactor Ruerse Shutdown llours 0.0 0.0 138.0 H

14.

Ilours Generator On-line 493.1

' 6,645.1.

91,561.8 15.

Unit Reserve Shutdown llours 00 0.0 0.0 16.

Gross Thermal Energy Generated (MWil) 1,104,196.3 17,004,405.0 233,535,352.8 1

17.

Gross Electrical Energy Generated (MWil) 356,342.0 5.537,283.0 76,549,461.0 18.

. Net Electrical Energy Generated (MWil) 329,578.0 5,235,891.0 72,575,089.0

.19. - Unit Service factor 66.3 75.9 84.1 20.

Unit Availabilty Factor 66.3 75.9-84.1 21.

Unit Capacity Factor (Using MDC Net) 53.9 72.7__

81.3 22.

Unit Capacity Factor (Using DER Net) 53.4 72.1 80.4_

23.

Unit Forced Outage Rate 30.l_

6.6 4.2 24; Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

25.

-If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A 26, Units in Test Status (Prior To Commercial Operation):

Forecast Achieved initial Criticality 05LOMBL 051083 1 Initial Electricity 05/2M1 05/25!31 Commercial Operation O&Dilhl 07!30111

DOCKET No.

50-364 t! NIT 2

DATE January 1,1994 COMPLETED BY R. D.11i11 1 E1.EPIIONE (205) 899-5156 MONTil DECEMilER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 832 2

11 18 832 3

0 19 832 4

228 20 690 326 21 355 5

6 355 22 0

7 572 23 0

790 24 0

8 9

829 25 0

10 828 26 0

l 11 832 27 0

j 12 833-28 0

i 1

13 830 29 21 14 829 30 634 1

15 832 31 827 l

16 831 I

th51RUCTl0S5 On this fornet, hst the average dady umt Fmet lesel m \\1We-Net for each day in the reputmg gerud Coripec to the nearest whide iregawatt.

.j

.l

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations December 1993 The cycle 9-10 refueling outage continued through the month of December. Power operation began at 1232 on 12-02-93.

At 2233 on 12-02-93, with the unit in mode 1 operating at approximately.5 percent reactor power, the reactor tripped due to a low-low water level in the 2C steam generator (S/G) following a turbine trip and feedwater isolation. The unit returned to power operation at 1944 on 12-03-93.

The generator was taken offline for a generator overspeed trip test. The reactor remained critical during the test. The unit returned to power operation at 2359 on 12-03-93.

At 1912 on 12-21-93, the unit was shut down for a maintenance outage due to excessive vibration in the main turbine. It was discovered that the inner diaphragm gasket on the flange on the inlet to the low pressure turbine #2 had failed. The failed gasket allowed an incorrect steam flowpath, which induced high vibrations in the turbine.

j The gasket was repaired and a visual inspection of the turbine was completed satisfactorily.

The unit returned to power operation at 1831 on 12-29-93.

The following major safety related maintenance was performed during the month:

1.

Performed miscellaneous corrective and preventive maintenance on the diesel generators.

2.

Replaced spent fuel pool radiation monitor RE25B due to it spiking high.

3.

Modified the 2A and 2B charging pump gear boxes to prevent an oil mist -

problem.

4.

Replaced the letdown orifice outlet relief valve Q2E21V0255 due to seat leakage.

t 5.

Replaced controller card on main steam atmospheric relief valve 3371 A.

UNIT SIIUTDOWNS AND POWER REDUCIIONS DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 DATE January 6,1994 COMPLETED BY R. D. Hill REPORT MONTH DECEMBER TELEPilONE (205) 899-5156 p.== =g _

.H t

{

METilOD OF LICENSEE CAUSE AND CORRECTIVE d

I r.l DURATION f SilUTTING EVENT SYSTEM COMPONENT ACTION TO NO.

DATE _

TYPE (tji ilOURS lREASONG) DOWN REACTOR 13)_ REPORT #

CODE (4)

_ CODE (5)

PREVENT RECURRENCE 005 931201 S

36.5 C

1 N/A N/A N/A The cycle 9-10 refueling continued from 930925. Power

(

[ ywy wympmmmm mmemm7pmws m m9 q ;;pnwTpar m a m mpgy;ggewy m e gs m m m mg3m operation began at 1232 on 931202.
p geng y p w e m;7t y -* 7 m -c

%ukm audEdideNge.

M bdc1GEMMMI!afdh3hEh&deas% E GEM 4A 4hMME 44RE2mM&n&!sEkWWiBEiinshdRufddGSGAUMMuh 4

l l 006 931202 F

21.7 A

3 93-004-00 1 AB JB At 2233 on December 02,1993, with the Unit in Mode i 1

operating at approximately 5 percent reactor power, the I

j reactor tripped due to a low-low water level in the 2C steam generator (S/G) following a turbine trip and feedwater isolation.

p I'This event was caused by equipment failure in that the steam generator feed pump speed control [JB] was maintaining an U

excessive /crratic pressure difTerential across the feed i

regulating bypass valves as the result of the failure of a speed ~

i controller catd.

1:

2:

3: -

4:

5:

1 F; Forced Reason Method Exhibit G Instructons for Exhibit I-Same Soutre 5; Scheduled A - Egmpment Fadure t Explam) 1-Manu:J Preparations of Date Entry 13 - Mamtenance or Test 2 - Manual Scram Sheets for L;censee Esent C - Refuelmg 3 - Automanc Scram Report (LER) File (NUREG-0161)

- D - Regufcary Restnction 4 - Other (Explain)

E-OperatorTrainmg & License Exammatxm F + Admimstrative G - Operational Error (Explain)

II - Other (Esplam)

~

l l

h s

. m.

.m

.m...

.c m

m,_,_.m...

em

.,,..,,g.

,,.w..-

..y,..,....,,yv r

.,,,,, e g m w v.

-.2%.,,

UNITSilUTDOWNS AND POWER REDUCTIONS

=

DOCK ET NO.

50-364 UNIT NAME J. M. Earle,y - Unit 2-DATE January 6,1904 COMPLETED BY R. D. Ilill J-REPORT MONTil DECE3111ER TELEPilONE (205)899-5156

.7___

t i

[

MElllOD OF

! LICENSEE CAUSE AND CORRECTIVE DURATION. !

SilUTTING EVENT SYSTEM COMPONENT ACTION TO 1j DATE_bTYPE(Q, liOURS dREASONg)

DOWN REACTOR (3)

REPORT #

CODEto CODE (5)

PREVENT RFCURRENCE O

NO.

+

,. -006 l 931202 F

21.7 i

A 3

'93-004-00l AB JB (The unit returned to power operation at 1944 on 931203.

p;!

mwwwwmygmmmh2&SdKftrAnwnsd#Mki JsssW4!GZhudiis&ggMdWsnOSkeOMM mqqmgmywegmmmmpyg ggggm An&d4K5duressow mppmumwmmww -

pmyw vpyqyy y AaMid s3Mdesid4 JJiii an fisM@iaEa1R$02#iii%E 4

AmmA-si4M s

y 007 931203 S

1.5 B

4 N/A N/A N/A The generator was taken offline for a generator overspeed trip

,i test. The reactor remained critical during the test. Theunit j

N l

e returned to ower operation at 2359 on 931203 jtymngymema:wnpv~permqhD}c-e ak6e2KAssk%MLundumsk W anWMA%pmer8mmmmeneengpppge.

m rrnampw~ewy 3 mgggtegpwwwppp pmp lEl&MsGa%mudLnM%Gimk&

AMm aha %& dank %D?tissivdAMmdi%%ks%Ksiy 008 931221-F 191.3 A

I

(

N/A N/A N/A At 1912 on 931221, the unit was shut down for a maintenance

^

I outage due to excessive vibrations in the main turbine. It was t

discovered that the inner diaphragm gasket on the flange on the

[

. inlet to the low pressure turbine #2 had failed. The failed gasket

' allowed for an incorrect steam flowpath, which induced high i

i I

sibrations in_ the. turbine.

1 1

u i

1:

2-3:

4; 5:

F. Forced Resum Method Exhibit G-Instructens for Exhibit I - Same Soutre S. Scheduled A - Equipment Failure (Explam) 1-Manual Preparanons of Date Fmtry 1

B - Mamtenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuehng 3-Automanc Scram Report il ER) File (NUREG-0161)

D - Regulatory Restrictam 4 - Other (Explam)

E - Operator Training & License Examinanon 4

F-Admmistranve G - Operational Ermr (Explam) -

II - Other (Explami k.

e a

.