ML20059F480
| ML20059F480 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 12/29/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML20059F483 | List: |
| References | |
| NUDOCS 9401140042 | |
| Download: ML20059F480 (3) | |
See also: IR 05000354/1993023
Text
m -
q
?
,
i
i
o
i
DEC 2 91993
Docket No. 50-354
r
J
Mr. Steven E. Miltenberger
l
Vice President and Chief Nuclear Officer
Public Service Electric & Gas Company
,
Post Office Box 236
Hancocks Bridge, New Jersey 08038
'
Dear Mr. Miltenberger:
SUBJECT: NRC REGION I INSPECTION REPORT NO. 50-354/93-23
-
l
This letter transmits the NRC Region I inspection report for the routine, announced
j
inspection conducted by Mr. Ram Bhatia and others of this office the weeks of October 4-8,
,
'
and . November 1-3, 1993, at Hope Creek Nuclear Generating Station. Mr. Bhatia discussed
the results of this inspection with your Mr. R. Hovey and other members of your staff on
November 3,1993.
7
The inspection was directed towards areas important to public health _ and safety. Areas
_
l
examined in this inspection included the resolution and actions taken for open items identified
!
previously during the Electrical Distribution System Functional Inspection (EDSFI). Within
this scope. the inspection consisted of selective examination of design records, system
[
evaluations, drawings, procedures, and representative records; interviews with personnel; and
observations by the inspector.
,
Corrective actions for six previously identified issues were found to be adequate and the
items are closed. The inspector noted that your staff evaluation of the fast-transfer design
scheme and the root cause analysis of the load tap changer problems were comprehensive and
,
thorough. Within the scope of this inspection, no violations were identified.
.
!
e
$
.
f
i
/h
'
1300m
7'?
'
\\
9401140042 931229
'
ADOCK 05000354_.
G
_
.__
_
_ - .
,
'
..
DEC 2 9 !993
. .
'
Public Service Electric
2
and Gas Company
i
Your cooperation with us in this matter is appreciated.
Sincerely,
'l
,t zu J1 r
m4
-
..
,
,
Jacque P. Durr, Chief
i
Engineering Branch
.
Division of Reactor Safety
l
Enclosure: NRC Inspection Report No. 50-354/93-23
cc w/ encl:
,
J. J. Hagan, Vice President-Nuclear Operations
P. J. Curham, Manager, Joint Generation Department,
Atlantic Electric Company
R. Hovey, General Manager - Hope Creek Operations
C. Vondra, General Manager - Salem Operations
F. Thomson, Manager - Licensing and Regulation
,
J. T. Robb, Director, Joint Owner Affairs
,
A. C. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. J. Wetterhahn, Esquire
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
.
i
!
.
b
6
!
-
- -
,
..-
DEC ?. 9 1993
.
Public Service Electric
3
and Gas Company
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/ encl: (Via E-Mail)
'W. Dean, OEDO
S. Dembek, NRR
J. Stone, NRR
L. Nicholson, Acting PDI-2, NRR
C^S.
RI:DRS
RI:DRS
RkD
B
a
Rul
Durr
12/Io/93
12/l /93
12(2fl93
OFFICIAL RECORD COPY
A:HC9323. INS