l 10CFR50.71(G) (4 )
ICCFR50.54 (0) (3)
PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE, PA 19087-5691 (215) 640 4650 GERALD
.R EY November 1, 1993 SMTON SUPPORT
}
Docket Nos. 50-352 i
50-353 Licence Nos. NPF-39 NPF-85 i
U.S. Nuclear Regulatory Coadmission i
Attn:
Document Control Desk Washington, DC 205p5
SUBJECT:
Limerick Generating Station, Units 1 ind 2 Submittal of Revision 3 of the Updated Final Safety Analysis Report
Dear Sirs:
In accordance with 10CFR50.71(e) (4) and 10CFR50.4 (b) (6), this letter submits one original and ten (10) copies of Revision 3 of the Updated Final Safety Analysis Report (UFSAR) for Limerick Generating Station (LGS), Units 1 and 2.
The enclosed copies'of Revision 3 are being provided to the NRC on a replacement page basis with a list of effective pages identifying the latest revision date of all current pacjes in accordance with 10CFR50. 71(e) (1).
In each revision package, we have also provided page replacement instructions for incorporating Revision 3 into the NRC copies of the I4S UFSAR. As required by 10CFR50.71(e) (5), each replacement page includes a bold vertical line in the margin' adjacent to each area changed and the date of change is included on each page.
Revision 3 reflects changes made up to a maximum of six months prior to thic submittal in accordance with the requirements of 10CFR50.71(e) (4).
As a result, the UFSAR Revision 3, has been made to reflect changes made to LGS, Units 1 and 2,
under the provision of 10CFR50.59, at least up to May 1, 1993.
The. enclosed UFSAR Revision 3 also contains an update of the annual revision to the Quality Assurance (QA) P ogram Description in accordance with 10CFR50.54 (a) (3). The annual revision of the QA Program Description was previously. submitted by our letter dated July 1, 1993.
The updated QA Program Description (i.e.,
Section
-17.2 of the UFSAR Revision 3) reflects editorial and organizational changes and those changes described in Attachment I as required by 9 11 0127 931101 E
/f I
.PDR ADOCK 05000352 p l) k' K
PDR y
u-
_---------_------.------------_-----------_--------------_.-_--_J
ISS Sub3ittel of R v.
3 UFSAR November 1, 1993 Page 2
,10CFR50.54 (a) (3)ii since the previous submittal on July 1, 1993.
- Subsequent revisions to the QA Program Description will be provided with our periodic UFSAR revisions.
Based on the information provided in Attachment 1,
we have concluded that the QA Program Description changes included in Revision 3 of the UFSAR do not reduce the commitments in the QA Program Description previously accepted by the NRC.
As required by 10CFR50. 71 (e) (2 ) (i), I certify that to the best of my knowledge, Revision 3 of the UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.
In addition, as required by 10CFR50.71(e) (2) (ii), Attachment 2 to this letter identifies changes made under the provision of 10CFR50.59 and included in the enclosed UFSAR Revision 3, but not previously submitted to the NRC.
If you have any questions or require further information, please contact us.
Very truly yours, Attachments Enclosures cc:
T. T. Martin, Administrator, Region I, USNRC w/ attachments /1 copies of enclosures N. S.
Perry, USNRC Senior Resident Inspector, I4S w/ attachments /1 copy of enclosure 1
ATTACHMENT 1 Page 1 of 5 PHILADELPHIA ELECTRIC COMPANY
~
NOV. 1993 QUALITY ASSURANCE PROGRAM DESCRIPTION CHANGES LGS UFSAR REVISION 3 (Program Description Revision 12)
Change Para. No.
Description of Chanae Classification 17.2.1 Changed "Information Systems and Organizational l
General Services" to " Support Services"-
j f
17.2 1.2 Changed " Nuclear Engineering, Nuclear Organizational Services" to " Station Support" 17 2.1.2.2 Changed " Nuclear Engineering and Organizational Nuclear Services" to " Station Support" j
t 17.2.1.2.3 Changed " General Manager" to Organizational
" Director" (3 places) f g.
Deleted "Monitorings" See Note 1 l
l Changed " Inspections" to Clarification
'" Verifications" f
i h.
Changed " Nuclear Services" to Organizational
" Station Support" l
p.
Deleted " Technical Monitoring" Note 1 17.2.1.2.3.1 Changed " General Manager" to Organizational l
" Director" e.
Deleted "monitorings" Note 1 l
t Changed " inspections" to Clarification.
i
" verifications" j
l
.17.2.1.2.3.1.1
.i e.
Deleted " technical monitoring" Note 1 g.
Deleted " technical monitoring" Note 1 j.
Changed " technical monitoring" to Note 1
" surveillance" k.
Changed " Monitoring" to "Sur.2illance~
Note 1
]
17.2.1.2.3.3 Changed " General Manager" to Organizational
" Director" e.
Changed " Nuclear Engineering and Organizational Nuclear Services" to " Station Support"
- )
]
1
. ATTACHMENT I Page'.2 of 5 j
.I l
f Change Para. No.
Descriotion of Chance Classification
.j
-17.2.1.4 Changed "Information Systems and Organizational General Services" to " Support Services" (4 places)
Changed " Senior Vice President, Organizational Finance" to " President and Chief
'l Operating Officer" 17.2.1.4.1 Changed "Information Systems and Organizational
^
General Services" to " Support Services" 17.2.1.4.1,2)
Changed " Nuclear Services" to Organizational
" Station Support" i
)
17.2.2.1 Changed " Project Q-List" to " LGS Organizational Component Record List (CRL)"
. j 17.2.2.1.1 Changed " technical monitoring" to Note 1
" surveillance" Changed " control" to " verification" Clarification 17.2.2.2 Changed station " technical" group Organizational i
to " engineering" (group) l t
17.2.2.4 Changed "by the Plant Manager or Clarification i
designee" to "in accordance with 1
Technical Specification requirements" 1
17.2.2.5 Changed " Senior Health Physicist, Organizational j
Radwaste Engineer, and Chemist" to j
" Health Physics, Radwaste and l
Chemistry Managers" l
Changed " technical group" to " Health Organizational l
Physics, Radwaste and Chemistry i
groups"
{
17.2.2.6 Changed " Maintenance / Instrument and Organizational j
Control" group to " Maintenance Group" Changed "through its Superintendent Organizational l
to the Plant Manager" to "to the i
Station Vice President" l
Changed quality " control checking and Clarification inspection" to quality " verification" t
Changed " Nuclear Engineering and Organizational Services" to " Station Support" i
[
,,-._4.,..v-.
...~.
u.~r v.- e s-
ATTACHMENT 1 P:.9e.3 of 5
. Change Para. No.
Description of Chanae Classification 17.2.2.7 Changed "is an independent Organizational organization functioning as a service group to the station" to " reports to 1
the Director, Outage Management, at l
the station"
'17.2.2.9 Changed " Project Q-List" to-Clarification
.l
" Component Record List (CRL)"
1 17.2.2.10 Deleted " Technical Monitoring" Note 1-T Changed quality " control" to Clarification l
" verification" l
17.2.2.12 Deleted " monitoring" Note 1-
!.)
i Changed " inspections" to Clarification
" verifications" f
17.2.3.8 b.
Changed " Engineering Work Letter is Clarification issued" to "Various documents are j
generated in accordance with i
Administrative Procedures" j
i c.
Changed " Safety Evaluation" to Clarification "10CFR50.59 review" d.
Changed design " criteria" to " input" Clarification j
i
.l 17.2.5.2 Added "in accordance with Technical Clarification Specifications requirements" 17.2.5.4 Added "in accordance with Technical Clarification Specifications requirements" l
17.2.5.5 Deleted " Maintenance Request Forms" Clarification i
i 17.2.5.6 Changed " notification to field forces Clarification j
and other engineering groups" to j
" instructions" j
Changed "given in one or more Clarification Engineering Work Letters" to i
"provided in accordance with j
Administrative Procedures"
.l Changed " Engineering Work Letter (s)"
Clarification to " instructions"
ATTACHMENT 1 Page 4 of 5 1
Change 1
-Para. No.
Description of Chance Classification i
17.2.5.7 Changed " Installation Memoranda are Clarification issued by the Installation Section" to " installation instructions are l
prepared in accordance with Administrative Procedures" Changed " Modification Installation Clarification j
Memoranda" to " work instructions" Replaced items a through 9 with Clarititol'7n
.l
" drawings, specifications, inspection reports, installation documents and work order activities" 17.2.5.9 Changed " technical monitoring" to Note 1
" surveillance" r
17.2.6.1 Changed Document " Administration" Organizational l
Center to " Control"
~
17.2.6.4 Changed " General Manager" to Organizational-
" Director" 17.2.7.1.a Changed " Nuclear Engineering and Organizational l
Services" to " Station Support" i
17.2.7.7 Changed " General Manager" to Organizational
" Director" 17.2.9.9 Changed quality " control" to Clarification j
" verification" Changed " technical monitoring" Note 1 f
to " Surveillance" 1
17.2.10.;
Changed " Engineering Work Letters" Clarification to " engineering instructions"
}
17.2.10.9 Changed quality " control inspections" Clarification.
to " verifications" t
17.2.10.12 Changed " technical monitoring" to Note 1
" surveillance" i
Changed " inspections" to Clarification-
" verifications" 17.2.10.12.1 Changed quality " control" to Clarification
" verification" I:
.----i--r e+--e 2
r---eim--
w=w-+-
a ATTACHMENT _1 Page 5 of 5 j
r Change
-l
. Para. No.
Description of Chanae Classification
'j 17.2.11.3.d Changed " inspection" to " verification" Clarification.
i
- 17~.2.12.4
' Added "of Station Support" Clarification j
17.2.14.11 Changed quality " control" to Clarification f
" verification" l
'?
Changed " technical monitoring" Note 1 i
to " surveillance" 17.2.15.2.1 Deleted " Nuclear" (Engineering)
Organizational 17.2.15.3 Changed " Procurement Engineering Organizational l
Group" to " Site Engineering" 4
Deleted "Within the Materials Organizational Management Section" t
17.2.16.4.3 Deleted " technical monitoring" Note 1 Changed " inspections" to Clarification
.l
" verification" j
17.2.17.7 Changed Document " Administration" Organizational L
Center to " Control" l
t 17.2.18.5 Changed " General Manager" to Organizational l
" Director" 1
i 17.2.18.13 Changed " General Manager" to Organizational
" Director"
- Appendix 17.2.I Changed "MA and M Series" to Clarification -
"M-C Series"
- Appendix 17.2.11 l
I a.1 Changed quality " control" to Clarification t
" verification" i
h.
Changed quality " control" to Clarification
" verification" l
I r.
Changed Nuclear Engineering Organizational j
" Department" to " Division" Note I:
Under the current PECo Quality Assurance Program, the requirements for conducting a
" surveillance" equals or exceeds the requirements for performing ~' a i
" surveillance" or " technical monitoring" as previously described in the LGS UFSAR j
QA Program Description.
}
I l
I pp 4
m e
a m
mn m,w'-w
+
n-
-~
P i
l.
ATTACHMENT 2 Page 1 of 3 i
i Changes made under 10CFR50.59 included in Revision 3 of'tbe Limerick.
~. Generating Station Updated Final Safety Analysis Report, but not-previously i
submitted to the NRC are identified below.
j Modification Unit Number Number Description l
5001 1&2 Adding new vent lines and a demineralized water l
fill conection to RWCU recirculation pump j
system 5085 1
Rosemount Transmitter Replacement j
5117 1&2 Installation of desiccant breathers and overflow l
line on acid storage tanks for circulation water and makeup demineralizer system a
-1 5142 1
Replacement of instrumentation and provide control power isolation for each. of. the three reactor feed pump minimum flow control systems j
I 5241 1
Temporary circuit alternations were made permanent for certain Emergency Response
- i facility Data System 5248 1
Replaces conductivity instrumentation in the Reactor Water Cleanup, Feedwater Condensate Pump Discharge, J,akeup Demineralizer, Condensate Filter Cemineralizer and Radwaste Demineralizer Effluent Sampling System and adds dissolved oxygen monitoring to the Reactor Water Cleanup l
I inlet and the feedwater sampling 5416 1
Post Accident Sampling System (PASS) improvements 5816 2
Implements changes to the Control Rod Drive Hydraulic System in order to improve the performance of the Integrated Leak Rate Testing
)
5843 1&2 Remove trip capability of low temperature switches for Reactor Enclosure and Refueling Floor supply fans 5880 1
Technical justification to use an alternate method for performance of the local leak rate testing of feedwater long-path recirculation valve HV-41-109A and a necessary modification to provide a test tap on the neck of the valve body l
5956 1&2 Installation of the General Electric's Zinc Injection Passivation (GEZIP) system 5987 1&2 Cooling Tower Acid Feed System upgrade 6036 1
Replacement of flow orifices in Core Spray minimum flow lines l
~
ATTACHMENT 2'(continued)
Page 2.of 3-
{
-i Modification Unit Number Number Description 6065 1&2 Installation ~of Control Enclosure chiller units
]
Safety Indicator Panels
- )
6079 1&2 Reflect addition of combustibles on Refueling Floor l
6102 2
Provide piping for and alternate non-safety
.l related flow path from the Generator Hydrogen Cooler Service Water supply line to the Isophase I
Bus Coolers
]
6104 1
Add drain connection to line to the Containment j
Atmospheric Control system 6130 1&2 Operator's break area facility j
i 6133 1&2 Replacement of the Riley Temperature Monitoring i
Instrumentation associated with the Steam Leak l
Detection System j
6135 1&2 Modify the Turbine Generator Fire Detection and l
Suppression System j
6136 1&2 Carbon dioxide system fire protection for j
Turbine Generator Exciter Bearings 11 & 12 6137 1&2 Addition of Radiation Area Access Control system l
6138 1
. Hydrogen Water Chemistry (HWC) system tie-in work requiring plant' outage conditions j
l 6139 1
Snubber Reduction Program Phase A j
6141 1&2 Tie in of LGS Training Facility Fire Protection l
System to the station system j
6144 1&2 Replace underrated, non-lE DC fuses
-l 6155 1&2 Installation of drain pipes for rain water from yard dikes to Radwaste Laundry Facility
-l 6161 1&2 Removal of low service water flow alarms from l
the glycol and vault cooling refrigeration machines j
6163 2
Removal of automatic swap-over capability of the Offgas Aftercondenser Drain Valve CV 69-256 6167 1&2 Removal of the trip capability of the manual reset overtemperature switches for the Standby Gas Treatment System Heaters i
I
~
ATTACHMENT 2 (continued)
Page 3 of 3 Modification Unit 5
Number Number Description
]
6168 1 & 2
Installation nf high point vents on_ Reactor. Feed i
Pumps suction piping j
6171 1&2 Instrument air header retubing for the main l
control room alarm and indication
^
d 6182 1&2 Rerouting of the Reactor Water Cleanup (RWCU) system Precoat Tank overflow line to install a tee and associated valves to run the overflow line to the Dirty Radwaste (DRW) system during i
backwash of the RWCU Filter Demineralizers l
6183 1&2 Setpoint change for Reactor Enclosure blowout l
panels
-l 6187 1&2 Provide a new permanently installed 480-volt '
power feed to the Turbine Operating Floor from i
Site Perimeter Substation to support turbine i
generator outage work i
~!
6189 1&2 Modify the Turbine Enclosure ventilation system
-l supply fans low temperature trip instrumentation j
6191 1&2 Installation of a manually operated selector switch to disable the low pressure alarm for an out-of-service Steam Jet Air Ejector train 6207 1&2 Replacement of the Emergency Service Water (ESW)
-)
piping from the High Pressure Coolant Injection room unit coolers to the common return line of-i the 'B' loop of the ESW l
t 6210 1
Restore operability of Extraction Steam drain j
valves to their original design condition j
6226 2
Addition of fire detection to three plant l
locations where Thermo-Lag fire barriers are installed i
i l
i i
i l
I
- 'l l
- -.. ~.
RECEIPT ACKNOWLEDGEMENT FORM For LGS USFAR Controlled CoDV # 1-11 Assigned to:
Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn:
Document Control Desk-Mail Station P1-137 Washington, DC 20555 Please sign below as evidence of receipt of the Limerick Generating Station Updated Final Safety Analysis, Revision 03 replacement pages.
These are controlled documents that must be inserted into your copy of the UFSAR.
Please take this opportunity to verify the accuracy of your documents by conducting a self-audit.
This can be done, while inserting the revision, by making a comparison of each individual page in your documents to the enclosed Page Revision Listing.
The most current revision is indicated 1.9 the bottom right-hand corner of each page.
This revision number should coincide with that indicated on the Page Revision Listing.
If these controlled documents are not needed, or you wish to report missing pages, please contact the UFSAR Revision Coordinator in Licensing at the address below.
/
Signed Organization Date Return to:
C. G.
Krajnik (215-640-6777)
Philadelphia Electric Company 62A-1, Licensing Section 965 Chesterbrook Boulevard Wayne, PA 19087-5961
LIMERICK GENERATING STATION, UNITS 1.AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT INSTRUCTION FOR PAGE REPLACEMENT REVISION 03,11/93
- t REMOVE AND DISCARD INSERT
" LIST OF EFFECTIVE PAGES" VOLUME l
l 2
L0EP l-3 through LOEP l-7 L0EP l-3 through L0EP.1-7 i
LOEP 2-1 through L0EP 2-15 L0EP 2-1 through LOEP 2-15 L0EP 3-9 and LOEP 3-11 L0EP 3-9 and LOEP 3-11 i
L0EP 4-3 through L0EP 4-9 L0EP 4-3 through L0EP 4-9 LOEP 6-1 L0EP 6-1 L0EP 6-5 and L0EP 6-7 L0EP 6-5 and L0EP 6-7 a
L0EP 8-1 through L0EP 8-13 L0EP 8-1 through L0EP 8-13 LOEP 9-1 through LOEP 9-13 L0EP 9-1 through L0EP 9-13 j
L0EP 10-1 L0EP 10-1 L0EP 10-5 and L0EP 10-7 LOEP 10-5 and L0EP 10-7 L0EP 10-11 LOEP 10-11 LOEP 10-17 L0EP 10-17 L0EP 11-1 through L0EP 11-7 LOEP 11-1 through L0EP 11-7 L0EP 12-3 L0EP 12-3 L0EP 12-7 and L0EP 12-9 LOEP 12-7 and LOEP 12-9 L0EP 12-13 L0EP 12-13 LOEP 13-5 L0EP 13-5 l
L0EP 13-9 and L0EP 13-11 LOEP 13-9 and L0EP 13-11 L0EP 14-1 through L0EP 14-9 L0EP 14-1 through L0EP 14-9 L0EP 15-1 L0EP 15-1 L0EP 15-3 L0EP 15-3 L0EP 15-7 L0EP 15-7 L0EP 15-9 L0EP 15-9 I
L0EP 15-11 L0EP 15-11 LOEP 15-13 L0EP 15-13 LOEP 16-1 through L0EP 16-9 L0EP 16-1 through L0EP 16-9 i
LOEP 17-1 L0EP 17-1
.l L0EP 17-3 L0EP 17-3 I
LOEP 17-11 LOEP 17-11 i
L0EP 18-1 L0EP 18-1 l
L0EP 18-3 L0EP 18-3 L0EP 19-3 L0EP 19-3 i
L0EP 19-13 and L0EP 19-15 LOEP 19-13 and L0EP 19-15 VOLUME 1
[
Figure 1.2-20 Figure 1.2-20 i
Figure 1.2-56 Figure 1.2-56 Figure 1.2-57 Figure 1.2-57 Figure 1.2-71 Figure 1.2-71 Table 1.7-1 Table 1.7-1 Table 1.7-2 Page 6 Table 1.7-2 Page 6 i
Table 1.7-2 Page 9 and 10 Table 1.7-2 Page 9 and 10 LGS UFSAR/PR-1 Rev. 3 Nov./93 l
[
INSTRUCTIONS FOR PAGE REPLACEMENT
. j REMOVE AND DISCARD INSERT VOLUME 2 l
Text 1.8-17 Text 1.8-17
= i Text 1.8-25 Text 1.8-25 l
Text 1.8-27 Text 1.8-27 Text 1 8-35 Text 1.8-35 Text 1.8-37 Text 1.8 !
Table 1.10-2 Page 2 Table 1.10-2 Page 2-Text 1.13-3 Text 1.13-3 Text 1.13-5 Text 1.13-5
. Text 1.13-19 Text 1.'13-19 Text 1.13-93
. Text 1.13-93 Table 1.13-4 Table 1.13-4 j
Table 2.2-6 Table 2.2-6 Text 2.3-37 Text 2.3-37 Table 2.3.4-2 Page 8 Table 2.3.4-2 Page 8 l
Text 2.4-45 Text 2.4-45 i
VOLUME 3 l
Text 3.2-13 Text 3.2-13 i
Table 3.2-1 Page 23 and 24 Table 3.2-1 Page 23 and 24 l
Table 3.2-1 Page 43 Table 3.2-1 Page 43 i
Table 3.2-6 Page 1 Table 3.2-6 Page 1
~!
I VOLUME 4 i
Text 3.6-27
. Text 3.6-27 Text 3.6-29 Text 3.6-29 Table 3.6-19 Table 3.6-19
~j Figure 3.6-11 Sheet I and 2 Figure 3.6-11 Sheet I and 2.
i Figure 3.6-19 Sheet I and 2 Figure 3.6-19 Sheet I and 2 i
Figure 3.6-23 Sheet I and 2 Figure 3.6-23 Sheet I and 2 i
Figure 3.6-24 Sheet I and 2 Figure 3.6-24 Sheet I and 2 4
Figure 3.6-27 Sheet I and 2 Figure 3.6-27 Sheet 1 and 2 i
Figure 3.6-30 Figure 3.6-30 l
Figure 3.6-43 Figure 3.6-43 VOLUME 5-No page in this volume was revised VOLUME 6 l
Text 3.9-65 Text 3.9-65 l
Text 3.9-69 Text 3.9-69 Table 3.9-6(o)
Table 3.9-6(o)
Table 3.9-8 Page 1 and 2 Table 3.9-8 Page 1 and 2 VOLUME 7 AND VOLUME 7A No page in this volume was revised LGS UFSAR/PR-2 Rev. 3 Nov./93
LGS UFSAR INSTRUCTIONS FOR PAGE REPLACEMENT REMOVE AND DISCARD INSERT VOLUME 8 Text 4.3-1 Text 4.3-1 i
Text 4.4-15 Text 4.4-15 Text 4.6-15 Text 4.6-15 Text 4.6-35 Text 4.6-35 Figure 4.6-5 Sheet I and 2 Figure 4.6-5 Sheet I and 2 Figure 4.6-6 Sheet I and 2 Figure 4.6-6 Sheet 1 and 2 Figure 5.1-3 Sheet I through 4 Figure 5.1-3 Sheet I through 4 l
Figure _5.1-4 Sheet I through 3 Figure 5.1-4 Sheet I through 3 l
Text 5.2-5 Text 5.2 -
Text 5.2-21 Text 5.2-21 i
Text 5.2-41 Text 5.2-41 l
Text 5.2-47 Text 5.2-47 Text 5.2-59 Text 5.2-59 Figure 5.2-4 Figure 5.2-4 Figure 5.2-11 Sheet 1 tarough 4 Figure 5.2-11 Sheet I through 4 Text 5.3-3 Text 5.3-3 Text 5.3-5 Text 5.3-5 Text 5.3-7 Text 5.3-7 Text 5.3-9 Text 5.3-9 Text 5.3-11 Text 5.3-11 Text 5.3-13 Text 5.3-13 Text 5.3-21 Text 5.3-21 Table 5.3-5 Page I through 5 Table 5.3-5 Page 1 through 5
'I Text 5.4-13 Text 5.4 Text 5.4-37 Text 5.4-37 i
Text 5.4-49 Text 5.4-49 Figure 5.4-8 Sheet I and 2 Figure 5.4-8 Sheet I and 2 Figure 5.4-9 Sheet I and 2 Figure 5.4-9 Sheet I and 2 _
Figure 5.4-13 Sheet I through 4 Figure 5.4-13 Sheet I through 4 Figure 5.4-13 Sheet 6 Figure 5.4-13 Sheet 6 1
Figure 5.4-16 Sheet I through 4 Figure 5.4-16 Sheet I through_4 Figure 5.4-18 Sheet I and 2 Figure 5.4-18 Sheet I and 2 VOLUME 9 Text 6.1-5 Text 6.1-5 Text 6.2-33 Text 6.2-33 l
Text 6.2-35 Text 6.2-35 lext 6.2-57 Text 6.2-57 i
Text 6.2-73 Text 6.2-73 j
Text 6.2-93 Text 6.2-93 i
Text 6.2-113 Text 6.2-113 i
Table 6.2-1 Page I and 2 Table 6.2-1 Page 1 and 2
{
Table 6.2-2 Page 2 Table 6.2-2 Page 2 Table 6.2-9 Page I through 3 Table 6.2-9 Page 1 through 3 i
Table 6.2-17 Page 3 Table 6.2-17 Page 3 Table 6.2-17 Page 10 Table 6.2-17 Page 10 l
Table 6.2-22 Page 1 Table 6.2-22 Page 1 Table 6.2-25 Page 14 Table 6.2-25 Page 14 LGS UFSAR/DR-3 Rev. 3 Nov./93 i
LGS OFSAR INSTRUCTIONS FOR PAGE REPLACEMENT REMOVE AND DISCARD INSERT VOLUME 9 (continued)
Figure 6.2-36 Sheet 12 Figure 6.2-36 Sheet 12 Figure 6.2-36 Sheet 17 and 17a Figure 6.2-36 Sheet 17 and 17a Figure 6.2-37 Sheet I through 4 Figure 6.2-37 Sheet 1 through 4 Text 6.3-23 Text 6.3-23 Text 6.3-33 Text 6.3-33 Text 6.3-35 Text 6.3-35 Text 6.3-37 Text 6.3-37 Text 6.3-41 Text 6.3-41 Figure 6.3-1 Figure 6.3-1 Figure 6.3-2 Figure 6.3-2 Figure 6.3-7 Sheet I and 2 Figure 6.3-7 Sheet 1 and 2 Figure 6.3-8 Sheet 1 Figure 6.3-8 Sheet 1 Figure 6.3-9 Sheet I and 2 Figure 6.3-9 Sheet 1 and 2 Text 6.4-1 Text 6.4-1 Text 6.4-11 Text 6.4-11 Text 6.5-9 Text 6.5-9 Table 6.5-2 Page 4 Table 6.5-2 Page 4 Table 6.5-8 Page 3 Table 6.5-8 Page 3 VOLUME 10 Text 6.6-5 Text 6.6-5 Figure 6.7-1 Sheet I and 2 Figure 6.7-1 Sheet I and 2 Text 7.1-71 Text 7.1-71 Text 7.2-3' Text 7.2-3 Text 7.2-5 Text 7.2-5 Figure 7.2-14 Figure 7.2-14 Figure 7.2-15 Figure 7.2-15 Text 7.3-37 Text 7.3-37 Text 7.3-305 Text 7.3-305 VOLUME 11 Figure 7.3-7 Sheet 1 through 6 Figure 7.3-7 Sheet I through 8 Figure 7.3-8 Sheet 1 through 5 Figure 7.3-8 Sheet I through 6 Figure 7.3-10 Sheet 3 rigure 7.3-10 Sheet-3 Figure 7.3-20 Sheet 1 Figure 7.3-20 Sheet 1 Figure 7.3-23 Sheet 1 Figure 7.3-23-Sheet 1 Figure 7.3-23 Sheet 5 Figure 7.3-23 Sheet 5 Figure 7.3-23 Sheet 11 Figure 7.3-23 Sheet 11 Figure 7.3-25 Sheet 2 and 3 Figure 7.3-25 Sheet 2 and 3 Figure 7.4-1 Sheet I through 6 Figure 7.4-1 Sheet I through 7 Table 7.5-3 Page 1 Table 7.5-3 Page 1 Table 7.5-3 Page 4 through 6 Table 7.5-3 Page 4 through 6 Table 7. 5-3 Page 11 through 14 Table 7.5-3 Page 11 through 14 Table 7.5-3 Page 17 Table 7.5-3 Page 17 Table 7.5-3 Page 19 Table 7.5-3 Page 19 Table 7.5-3 Page 22 Table 7.5-3 Page 22 Table 7.5-3 Page 25 through 27 Table 7.5-3 Page 25 through 27 Text 7.6-21 Text 7.6-21 LGS UFSAR/PR-4 Rev. 3 Nov./93
LGS UFSAR INSTRUCTIONS FOR PAGE REPLACEMENT.
REMOVE AND DISCARD INSERT VOLUME 11 (continued)
Text 7.6-23 Text 7.6-23 Text 7.6-25 Text 7.6-25.
Text 7.6-29 Text 7.6-29 Text 7.6-35 Text 7.6-35 Text 7.6-97 Text 7.6-97 Text 7.6-99 Text 7.6 VOLUME 12 Text 7.7-111 Text 7.7-111 Figure 7.7-11 Figure 7.7-11 Text 8.1-21 Text 8.1-21 Text 8.1-45 Text 8.1-45 Text 8.1-47 Text 8.1-47 Figure 8.1-1 Figure 8.1-1 Text 8.2-3 Text 8.2-3 Text 8.2-5 Text 8.2-5 Figure 8.2-3 Figure 8.2-3 Figure 8.2-4 Figure 8.2-4 Figure 8.2-5 Figure 8.2-5 Text 8.3-1 Text 8.3-1 Text 8.3-5 Text 8.3-5 Text 8.3-7 Text 8.3-7 Text 8.3-9 Text 8.3-9 Text 8.3-13 Text 8.3-13 Text 8.3-15 Text 8.3-15.
Text 8.3-17 Text 8.3-17 Figure 8.3-1 Sheet 2 Figure 8.3-1 Sheet 2 Figure 8.3-3 Sheet I through 6 Figure 8.3-3 Sheet I through 6 VOLUME 13 Figure 9.1-3 Sheet 1 Figure 9.1-3 Sheet 1 Figure 9.1-4 Sheet 1 Figure 9.1-4 Sheet 1 Text 9.2-21 Text 9.2-21 Figure 9.2-1 Sheet 1 through 4 Figure 9.2-1 Sheet I through 4 Figure 9.2-1 Sheet 8 and 9 Figure 9.2-1 Sheet 8 and 9 Figure 9.2-2 Sheet I and 2 Figure 9.2-2 Sheet 1 and 2 Figure 9.2-3 Sheet 1 Figure 9.2-3 Sheet 1 Figure 9.2-4 Sheet 2 Figure 9.2-4 Sheet 2 Figure 9.2-5 Sheet 1 through 3 Figure 9.2-5 Sheet I through 3 Figure 9.2-24 Sheet 1 through 3 Figure 9.2-24 Sheet I through 3 Figure 9.2-25 Sheet 1 Figure 9.2-25 Sheet 1 Figure 9.2-27 Sheet 8 Figure 9.2-27 Sheet 8 Text 9.3-5 Text 9.3-5 Text 9.3-17 Text 9.3-17 Text 9.3-25 Text 9.3-25 Text 9.3-27 Text 9.3-27 Text 9.3-31 Text 9.3-31 Text 9.3-33 Text 9.3-33 LCS UFSAR/PR-5 Rev. 3 Nov./93
l INSTRUCTIONS FOR PAGE REPLACEMENT f
'RFMOVE AND DISCARD INSERT VOLUME 14 I
Figure 9.3-1 Sheet I through 3 figure 9.3-1 Sheet I through 3
- }
Figure 9.3-1 Sheet 8 Figure 9.3-1 Sheet 8 Figure 9.3-1 Sheet 10 Figure 9.3-1 Sheet 10 l
Figure 9.3-1 Sheet 12 Figure 9.3-1 Sheet 12 j
Figure 9.3-1 Sheet 16 Figure 9.3-1 Sheet 16 Figure 9.3-1 Sheet 18 and 19 Figure 9.3-1 Sheet 18 and 19 I
Figure 9.3-1 Sheet 25 Figure 9.3-1 Sheet 25 l
Figure 9.3-1 Sheet 27 Figure 9.3-1 Sheet 27 i
Figure 9.3-1 Sheet 30 Figure 9.3-1 Sheet 30-j Figure 9.3-1 Sheet 33 Figure 9.3-1 Sheet 33
.i Figure 9.3-1 Sheet 36 Figure 9.3-1 Sheet 36 l
Figure 9.3-1 Sheet 45 Figure 9.3-1 Sheet 45 4'
Figure 9.3-2 Sheet 2 Figure 9.3-2 Sheet 2' Figure 9.3-2 Sheet 4 tigure 9.3-2 Sheet 4 l
Figure 9.3-3 Sheet 2 through 5 Figure 9.3-3 Sheet 2 through,
Figure 9.3-3 Sheet 7 Figure 9.3-3 Sheet 7 Figure 9.3-4 Sheet 1 Figure 9.3-4 Sheet 1-Figure 9.3-4 Sheet 4 Figure 9.3-4 Sheet 4 i
Text 9.4-5 Text 9.4-5 Text 9.4-9-A Text 9.4-9-A Text 9.0-19 Text 9.4 l Text 9.4-47 Text 9.4-47 i
Text 9.4-53 Text 9.4-53 i
Text 9.4-55 Text 9.4-55 Text 9.4-57 Text 9.4-57 Figure 9.4-2 Sheet I and 2 Figure 9.4-2 Sheet I and 2 l
Figure 9.4-2 Sheet 7 through 9 Figure 9.4-2 Sheet 7 through 9 Figure 9.4-3 Sheet 3 Figure 9.4-3 Sheet 3 Figure 9.4-4 Sheet 1 Figure 9.4-4 Sheet 1 Figure 9.4-4 Sheet 5 and 6 Figure 9.4-4 Sheet 5 and 6 3
Figure 9.4-5 Sheet I through 6 Figure 9.4-5 Sheet 1.through 7
?
Figure 9.4-9 Sheet 1 Figure 9.4-9 Sheet 1 Text 9.5-7 Text 9.5-7 j
Text 9.5-9 Text 9.5-9 i
Text 9.5-11 Text 9.5-11 Text 9.5-13 Text 9.5-13
(
Text 9.5-19 Text 9.5-19 1
Text 9.5-49 Text 9.5-49 Text 9.5-57 Text 9.5-57 i
Text 9.5-61 Text 9.5-61 j
Text 9.5-63 Text 9.5-63 i
Figure 9.5-1 Sheet I through 10 Figure 9.5-1 Sheet I through 10 Figure 9.5-2 Figure 9.5-2 Figure 9.5-3 Figura 9.5-3 Figure 9.5-5 Figure 9.5-5 i
Figure 9.5-6 Figure 9.5-6 f
b f
LGS UFSAR/PR-6 Rev. 3' Nov./93 1
LGS ~UFSAR i
INSTRUCTIONS FOR PAGE REPLACEMENT j
i REMOVE AND DISCARD INSERT l
VOLUME 15 j
Text 9A-33 Text 9A i Text 9A-35 Text 9A.;
Text 9A-61 Text 9A-61 Text 9A-63 Text 9A-63 i
Table 9A-1 Page 2 through 15 Table 9A-1 Page 2 through 15 1
Table 9A-2 Table 9A-2 Table 9A-4 Page 2 Table 9A-4 Page 2 Table 9A-5 Page 3 Table 9A-5 Page 3 Table 9A-9 Page 3 Table 9A-9 Page 3 i
Table 9A-22 Page 2 Table 9A-22 Page 2 Figure 9A-3 Figure 9A-3 Figure 9A-4 Figure 9A-4 Figure 9A-7 Figure 9A-'7 i
VOLUME 16 Figure 10.2-1 Sheet I through 4 Figure 10.2-1 Sheet I through-4
~
Figure 10.2-2 Sheet 1 Figure 10.2-2 Sheet 1 Figure 10.3-1 Sheet 2 Figure 10.3-1 Sheet 2 Text 10.4-15 Text 10.4-15 Text 10.4-25 Text 10.4-25 1
Text 10.4-27 Text 10.4-27 Figure 10.4-1 Sheet I through 4 Figure 10.4-1 Sheet I through 4 Figure 10.4-2 Sheet 2 through 5 Figure 10.4-2 Sheet 2 through 5 Figure 10.4-2 Sheet 8 Figure 10.4-2 Sheet 8 l
Figure 10.4-3 Sheet 2
. Figure 10.4-3 Sheet 2 Figure 10.4-4 Sheet I through 3 Figure 10.4-4 Sheet I through 3-l Figure 10.4-5 Sheet I through 6 Figure 10.4-5 Sheet I through 8 Text 11.2-5 Text 11.2-5 Text 11.2-9 Text 11.2-9 Figure 11.2-1 Sheet 2 Figure 11.2-1 Sheet 2 i
Figure 11.2-2 Sheet 2 Figure 11.2-2 Sheet 2 Figure 11.2-3 Sheet 1 Figure 11.2-3 Sheet 1 Figure 11.2-4 Figure 11.2-4 Text 11.3-11 Text 11.3-11 Figure 11.3-2 Sheet 3 Figure 11.3-2 Sheet 3 l
Figure 11.3-3 Sheet 1 Figure 11.3-3 Sheet 1 Figure 11.3-3 Sheet 3 and 4 Figure 11.3-3 Sheet 3 and 4 Figure 11.4-2 Sheet 5 Figure 11.4-2 Sheet 5 Figure.11.4-2 Sheet 1 and 2 Figure 11.4-2 Sheet I and 2 t
~
LGS UFSAR/PR-7 Rev. 3 Nov./93 l
i
. LGS UFSAR INSTRUCTIONS FOR PAGE REPLACEMENT-REMOVE AND DISCARD INSERT
'l VOLUME 17 j
Text 11.5-39 Text 11.5-39 Text 11.5-41 Text 11.5-41 l
Table 11.5-1 Page I through 3 Tabla 11.5-1 Page 1 through 3 Figure 11.5-1 Sheet 1 Figuia 11.5-1 Sheet 1 i
Figure 11.5-1 Sheet 5 Figure 11.5-1 Sheet'5 Text 12.1-9 Text 12.1-9 Text 12.5-13 Text 12.5-13 1
Text 12.5-15 Text 12.5-15 Text 12.5-17 Text 12.5-17 VOLUME 18 Text 13-i through Text 13-vi Text 13-1 through Text 13-v*
l 4
Text 13.1-1 through 13.1-19 Text 13.1-1 through 13.1-23 Figure 13.1-1 through 13.1-4 Figure 13.1-1 through 13.1-4 Text 13.2-1 through 13.2-27 Text 13.2-1 through 13.2-7 Table 13.2-1 Table 13.2-1 Figure 13.2-1 Figure 13.2-1 Text 13.4-1 Text 13.4-1 Text 13.4-3 Text 13.4-3 Text 13.4-7 Text 13.4-7 Text 13.4-9 Text 13.4-9 Text 13.5-1 Text 13.5-1 Text 13.5-3 Text 13.5-3 Text 13.5-11 Text 13.5-11 i
Text 13.5-13 Text 13.5-13 i
Text 13.5-17 Text 13.5-17 Text 13.5-21 through 13.5-33 Text 13.5-21 through 13.5-33
- l Figure 14.2-5 Figure 14.2-5 j
VOLUME 19 Text 15.4-1 Text 15.4-1 Text 15.4-7 Text 15.4-7 Text 17-i Text 17-i t
Text 17-11 Text 17-ii i
Text 17.2-1 through 17.2-65 Text 17.2-1 through Text 17.2-65 figure 17.2-1 through 17-2-10 Figure 17.2-1 through 17.2-10 Text 17.2.1 Page 1 through 4 Text 17.2.1 Text 17.2 I1-1 through 17.2.11-13 Text 17.2.11-1 through 17.2-11 4 Page 13-iv is attached to the Page Replacement Instructions.
LG5 UFSAR/PR-8 Rev. 3 Nov./93
.I i
LGS UFSAR CHAPTER 13 TABLES Table Title 13.1-1 Plant Staffing 13.1-2 Shift Crew Co:nposition - Minimum Requirements 13.2-1 Matrix of LGS Training Program Guidelines i
s 6
O
[
I l
1 O
13-iv Rev. 3 Nov./93
TABLES Table Title I
i 13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements i
13.2-1 Matrix of LGS Training Program Guidelines i
i h
O i
i f
1 I
1 i
i O
13-iv Rev. 3 Nov./93 l
LGB UFSAR CHAPTER 13 O
TABLES Table Title l
13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of LGS Trainir g Program Guidelines 1
O l
I i
i I
i i
O 1
i 13-iv Rev. 3 Nov./93
LGB UFSAR i
CHAPTER 13 O
i TABLES Table Title 13.1-1 Plant Staffing i
13.1-2 Shift Crew Composition - Minimum Requirements l
13.2-1 Matrix of LGS Training Program Guidelines f
i l
l O
i P
l t
4 I
i O
4 d
13-iv Rev. 3 Nov./93 l
l
.m
b CHAPTER 13 f
O i
TABLES Table Title l
i 13.1-1 Plant Staffing l
13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of LGS Training Program Guidelines f
f I
I t
l O
O 13-iv Rev. 3 Nov./93
o
{
TABLES I.a.A1.s!
Tit 1e i
i 13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements i
13.2-1 Matrix of LGS Training Program Guidelines
't I
b i
1 O
i 1
i r
s 3
r
[
I i
1 O
13-iv Rev. 3 Nov./93 i
{
l I
TABLES Table Title 13.1-1 Plant Staffing l
13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of LGS Training Program Guidelines i
i O
l i
r i
l v
I
?
I I
1 i
i 1
O 4
1 13-iv Rev. 3 Nov./93 l
l 1
TABLES i
i Table TitJ_e l
13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements i
13.2-1 Matrix of LGS Training Program Guidelines t
I l
i O
i l
I i
1 i
)
J i
1 0
13-iv Rev. 3 Nov./93
+
?
CZAPTER 13 O
TABLES Table Title 13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements r
13.2-1 Matrix of LGS Training Program Guidelines O
k E
i t
i O
i 13-iv Rev. 3 Nov./93
1 CHAPTER 13 O
TABLES j
. Table Title i
i 13.1-1 Plant Staffing i
13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of ISS Training Program Guidelines 1
4 4
i L
1 I
y I
O t
I f
+
i i
i r
i i
i t
t O
s 13-iv Rev. 3 Nov./93
[
LGB UFSAR j
CHAPTER 13 TABLES r
Table Title 13.1-1 Plant Staffing 13.1-2 Shift Crew Composition - Minimum Requirements 13.2-1 Matrix of LGS-Training Program Guidelines i
O 6
~f i
i
?
)
i I
t O
I i
13-iv Rev. 3 Nov./93 i
I
-.-