ML20059E731
| ML20059E731 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/30/1993 |
| From: | Mcmeekin T COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9401120204 | |
| Download: ML20059E731 (4) | |
Text
-- __.
11 1
Duke EbwerCompany T. C McMany McGone Suclear Generation Depamnent Vice hesident 12700Hugers ferry Raad(MG0lVT')
(704)8754800
. Hunterwelle.hc28078M (704)8754809 Fax DUKEPOWER
'W December 30,1993 U. S. Nuclear Regulatory Commission i
ATTN: Document Control Desk Washington, D.C. 20555
Subject:
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 NRC Inspectiorf Report No. 50-369, 370/93-11 Violation 50-369, 370/93-11-01 Supplemental Reply to a Notice of Violation Gentlemen:
Enclosed is a supptemental response to the Notice of Violation issued August 9,1993 concerning an inadequate preventative maintenance procedure for calibrating take level instrumentation. The initial response to violation 3tA 370/93-11-01 dated October 8,1993 stated th'at Duke's three nuclear sites plan to submit their proposal cancerning adoption of tne NUMARC EAL methodology to the NRC by December 31,1993 with full implementation planned by June 30,1994. A Duke Task Force plans to present their recommendations on adoption of the NUMARC EAL methodolo'gy to the three nuclear stations in January 1994. Based on this schedule, McGuire will submit a proposal concerning adoption of the NUMARC EAL.
methodology to the NRC by May 1,1994 with full implementation no later than six months after NRC approval of the proposal. This implementation includes complete upgrade training of all licensed SRO's to the new EAL's.
Should there be any questions concerning this response, contact Randy Cross at (704) 875-4179.
Very Truly Yours, 17MP +
T. C. McMeekin i
Attachment
' i xc:
(w/ attachment) l Mr. S. D. Ebneter '
Mr. George Maxwell Regional Administrator, Region 11 NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 PDR ADOCK 05000369 b
fl/(-
940122O204-931230 h4 0
ppg
. gj
~,-~
a-
,-,e
=
,r e
w
. _ _ _ _ _ _. _ _.. _ _ _ _ _ ~. _.. _ _.. _ _ _ _. _ _ _ _ _ _ _ _. -. _ _. _.. _ - _ _.,
b g
..1 i
i i
a U.S. Nuclea'r Regulatory Commission j
Dece'mber 30,1993 i
xc:
(w/ attachment)
{
i i
Mr. Victor Nerses I
U.S. Nuclear Regulatory Commission f
1 Office of Nuclear Reactor Regulation One White Flint North, Mail Stop 9H3 i
Washington, D. C. 20555 I
2 1
)
i f
l l
I i
I l
r e
I h
f i-I t
f i
I h
i i
i I
F l
i t
1 t
I r
t 4
i la r
.... -.. _ -... -.. -, -. ~.. - - - - -
_~ ~ -. - -__ _ - -. _ -
McGuire Nuclear Station i
Supplemental Reply to a Notice of Violation j
Miolatign_36_927Q/93-11-01 l
During an Nuclear Regulatory Commission (NRC) inspection conducted on June 13,1993 through July 17,1993, a violation of NRC requirements was identified. In accordance with the " General Statement of Poliev and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:
i Technical Specification 6.8.1 requires that written procedures be established, implemented, and maintained f
covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February,1978, which includes calibration of instrumentation and development of a preventative maintenance schedule.
Contrary to the above, the licensee had no specific procedure in place nor any preventative maintenance schedule developed for lake level instrumentation, which is used to monitor lake level for the purpose of entering the emergency plan.
This is a Severity Level IV (Supplement I) violation.
i Beply to Violation 361370/93-11-01 i
1.
Reason for the Violation:
Instrument loop 1MRCLT6480 (take level) was not prevv2 sly included in the station PM/PT program because it has not Leen designated as a safet) -related instrument and the FSAR statement concerning a low water alarm system monitored in the Control Room was inadvertently overlooked. Until the subject inspection, there was no alarm in the Control Room for low lake level. The sole input for lake level to the Control Room is via the Unit 1 Operator Aid Computer (OAC).
2.
Corrective ste._ps that have been taken and the results achieved:
A.
1 MRCLT6480 was repaired and a functional veritication was performed on June 24,1993.
B.
Minor Modification 3765 was written, approved and implemented to place the computer point alarm (OAC point A0766)in service. Computer point A0766 will now alarm at 748' elevation decreasing.
C.
The location of the instrument was verified to insure isolation of an RC (Condenser Circulating Water) system bay would not isolate 1MRCLT6480 from the lake.
D.
1MRCLT6480 was added to the station PM/PT program on July 27,1993.
2 E.
A reading packagt (93-22-SRN) concerning the low lake level EAL was developed and covered with all operators (completed September 30,1993).
i
.l
-)
i
.m
3.
Qorr'ective steps that will be taken to avoid further violations:
McGuire Nuclear Station will submit a proposal to the NRC to alter the focus of the low lake level EAL from the lake to the Standby Nuclear Service Water Pond (SNSWP). The current EAL on the low lake level is in error and should have addressed low SNSWP level which is the assured ultimate heat sink. Technical Specification 3/4.7.5 bases states "The limitations on the SNSWP level and temperature ensure that sufficient cooling capacity is available either to: (1) provide normal cooldown of the facility, or (2) mitigate the effects of accident conditions within acceptable limits. The limitations on minimum water level and maximum temperature are based on providing a 30 day cooling water supply to safety-related equipment without exceeding their design basis temperature and is consistent with the recommendations of Regulatory Guide 1.27," Ultimate Heat Sink for Nuclear Plants," March 1974."
Instrument loop OMRNLT6000 (SNWSP level) provides information to the Control Room staff in the form of a level gauge and two annunciator alarms (Iow and low-low level). This instrument loop is not safety-related but is included in the station PM/PT program which ensures yearly calibration. Additionally, the Control Room staff completes a required daily surveillance on the SNSWP level via the Control Room gauge.
i The station's proposal will include basing the subject EAL on the SNSWP level rather than the lake level since the SNSWP is the assured ultimate heat sink. FSAR section 2.4.11 will be updated at the next periodic update to reflect the proposed changes. Annunciator response procedures associated with OMRNLT6000 (SNSWP level) will be changed to address the new EAL when the NRC grants approval of the proposal. If the NRC elects to not approve the proposal, the station will submit a revised violation response.
i in addition, a Duke Task Force plans to present their recommendations on adoption of the NUMARC EAL methodology to the three nuclear stations in January 1994. Based on this schedule, McGuire will submit a proposal concerning adoption of the NUMARC EAL methodology to the NRC by May 1,1994 with full implementation no later than six months after NRC approval of the proposal. This implementation includes complete upgrade training of alllicensed SRO's to
{
the new EAL's.
4.
Date when full comgiance will be achieved:
Pending NRC approval of the subject EAL proposal, the station will be in full compliance no later r
I than six months after NRC approval of Duke's proposed adoption of the NUMARC EAL methodology.