ML20059B916
| ML20059B916 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/19/1993 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20059B920 | List: |
| References | |
| NPF-68-A-067, NPF-81-A-046 NUDOCS 9310290146 | |
| Download: ML20059B916 (2) | |
Text
,.
=.
TABLE 3.3-1 (Continued)
E 5
REACTOR TRIP SYSTEM INSTRUMENTATION 8S
$o E MINIMUM g g c-TOTAL NO.
CHANNELS CHANNELS APPLICABLE h FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION 7 0-o4 M gS -
b.
Two Loops (Above P-7 and 3/ loop 2/ loop in 2/ loop l'
6
,co a below P-8)
~
two oper-each oper-gaa N ating loops ating loop S
(l00P1 LOOP 2 LOOP 3 LOOP 4 FI-0414 FI-0424 FI-0434 FI-0444 FI-0415
'FI-0425 FI-0435 FI-0445 FI-0416 FI-0426 FI-0436 FI-0446) 13.
SteamGeneratopWater 4/stm. gen.
2/stm. gen.
3/stm. gen.
1, 2 6
I Level--Low-Low in any oper-each oper-ating stm.
ating stm.
gen.
gen.
(LOOP 1 LOOP 2 LOOP 3 LOOP 4 LI-0517 LI-0527 LI-0537 LI-0547 LI-0518 LI-0528 LI-0538 LI-0548 Y
LI-0519 LI-0529 LI-0539 LI-0549
^
LI-0551 LI-0552 LI-0553 LI-0554) 14.
Undervoltage--Reactor Coolant Pumps 4-2/ bus 2
3 l'
9 j
i S5 15.
Underfrequency--Reactor Coolant hh Pumps 4-2/ bus 2'
3 l'
9 l
mo 55 16.
Turbine Trip gg a.
Low Fluid Oil Pressure 3
2 2
l' 6
(PT-6161, PT-6162, PT-6163) gg b.
Turbine Stop Valve Closure 4
4 1
l' 12 EE 17.
Safety Injection Input hh from ESF 2
1 2
1, 2 7
l
'See Specification 3.3.3.6
s.
s TABLE 4.3-2 (Continued)
<8 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION
[
SURVEILLANCE REQUIREMENTS E
TRIP Z
ANALOG ACTUATING MODES CHANNEL DEVICE MASTER SLAVE FOR WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE
[FUNCTIONALUNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST.
IS REQUIRED
- 1. (Continued)
- e. Steam Line S
R Q
N.A.
N.A.
N.A.
N.A.
l##, 2##, 3## l Pressure-Low *
(LOOP 1 LOOP 2 LOOP 3 LOOP 4 PI-0514A,B&C PI-0524A&B PI-0534A&B PI-0544A,B&C PI-0515A PI-0525A PI-0535A PI-0545A PI-0516A PI-0526A PI-0536A PI-0546A)
- 2. Containment Spray g
- a. Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1, 2, 3, 4
[
- b. Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
M(1)
Q 1, 2, 3, 4 a,
Logic and Actuation Relays N
- c. Containment Pressure-S R
Q N.A.
N.A.
N.A.
N.A.
1",2",3",4" o Pug >
High-3** (PI-0934, PI-0935, PI-0936, yy PI-0937) a~
R E 3. Containment Isolation zu
??
- a. Phase "A" Isolation um
- 1) Manual Initiation N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1, 2, 3, 4 EE
- 2) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
M(1)
Q 1, 2, 3, 4
- 3. 3.
Logic and Actuation Relays SC
- See Specification 4.3.3.6.
.,